| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Finance | ₹14.6 L | L1 | Admitted-Finance |
| 2 | L2₹14.8 LAdmitted-Finance | ₹14.8 L | L2 | Admitted-Finance |
| 3 | L3₹14.9 LAdmitted-Finance | ₹14.9 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.M.Joy L1 | Vallooran Constructions L3 | GEORGE A K L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling AC / GI / Tufflite / Aluminium/Zincalum sheet roofing, side cladding etc and depositing the debris away from plant limit within a distance of 150 m. | 435 | M2 | 100 ₹43,500 | 88 ₹38,280 Lowest | 90 ₹39,150 |
| 2.00 | Dismantling AC/Aluminium/Zincalum ridge pieces and clearing away debris from the plant limit. | 20 | PAA | 75 ₹1,500 Lowest | 88 ₹1,760 | 100 ₹2,000 |
| 3.00 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge) | 16 | TO | 10,000 ₹1,60,000 | 9,700 ₹1,55,200 Lowest | 20,000 ₹3,20,000 |
| 4.00 | Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores | 4.3 | MT | 1,20,000 ₹5,16,000 Lowest | 1,28,500 ₹5,52,550 | 1,27,000 ₹5,46,100 |
| 5.00 | Erection of fabricated structural (dismantled or serviceable) at all levels such as trusses, brackets etc. including conveying repairing if any by straightening, cutting, welding etc. and erecting to lines and levels as per deptl. instructions. (The fabricated structural, gas & electrodes will be supplied by the Company free of cost). | 6.5 | TO | 17,000 ₹1,10,500 Lowest | 25,000 ₹1,62,500 | 20,000 ₹1,30,000 |
| 6.00 | Fabrication and erection of structural steel works bolted or welded as per drawings at all levels for trusses, ladders splices, frame work, base plates, HD bolts, purling, cleats, struts etc. including drilling, welding, cleaning the structural, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts (Structural, gas & electrodes will be supplied free of cost by the Company) | 8.75 | TO | 40,000 ₹3,50,000 | 34,000 ₹2,97,500 | 20,000 ₹1,75,000 Lowest |
| 7.00 | Roofing/side cladding with AC corrugated/Semi corrugated sheets 6 mm thick with 7 mm or nearest available dia and suitable length GI Hooks/bolts and nuts,GI and bitumen washers , cutting sheets to required shape/length, providing a minimum overlap of 150 mm at ends including cost of AC sheets and all other materials, scaffolding charges etc complete at all heights. | 445 | M2 | 500 ₹2,22,500 | 493 ₹2,19,385 Lowest | 520 ₹2,31,400 |
| 8.00 | Providing AC Corrugated/semi corrugated ridge capping with 7 mm or nearest dia and suitable length GI hooks/bolts and nuts, GI and bitumen washers etc,providing required overlaps at ends including cost of all materials including ridge, scaffolding charges etc complete at all heights. | 20 | M | 500 ₹10,000 | 430 ₹8,600 | 320 ₹6,400 Lowest |
| 9.00 | Painting with one coat of zinc chromate yellow metal primer and two coats of synthetic enamel paint using approved brand & quality at all heights after cleaning the surface by using waterjet spray/ manually including cost of all paint and materials, labour charges, etc.complete as per deptl instructions. | 250 | M2 | 200 ₹50,000 | 223 ₹55,750 | 100 ₹25,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 Apr 2026, 11:00 amClosed
SM(Mat) C
Contracts Dept. Corporate Materials FACT
Roof lifting works of sulphur truck unloading bins in Raw material plant at FACT Cochin Division, Ambalamedu, Kochi, as per tender conditions.
2026_FACT_904252_1
04031/2025-2026/E33352
Open Tender
Miscellaneous Works
Item Rate
90 days
FACT CD, Ambalamedu
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹25,000
Yes
11 Jun 2026
2 Apr 2026
23 Apr 2026
2 Apr 2026
22 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling AC / GI / Tufflite / Aluminium/Zincalum sheet roofing, side cladding etc and depositing the debris away from plant limit within a distance of 150 m. | - | M2 | - | - |
| 2 | Dismantling AC/Aluminium/Zincalum ridge pieces and clearing away debris from the plant limit. | - | PAA | - | - |
| 3 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge) | - | TO | - | - |
| 4 | Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores | 1 | MT | - | - |
| 5 | Erection of fabricated structural (dismantled or serviceable) at all levels such as trusses, brackets etc. including conveying repairing if any by straightening, cutting, welding etc. and erecting to lines and levels as per deptl. instructions. (The fabricated structural, gas & electrodes will be supplied by the Company free of cost). | - | TO | - | - |
| 6 | Fabrication and erection of structural steel works bolted or welded as per drawings at all levels for trusses, ladders splices, frame work, base plates, HD bolts, purling, cleats, struts etc. including drilling, welding, cleaning the structural, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts (Structural, gas & electrodes will be supplied free of cost by the Company) | - | TO | - | - |
| 7 | Roofing/side cladding with AC corrugated/Semi corrugated sheets 6 mm thick with 7 mm or nearest available dia and suitable length GI Hooks/bolts and nuts,GI and bitumen washers , cutting sheets to required shape/length, providing a minimum overlap of 150 mm at ends including cost of AC sheets and all other materials, scaffolding charges etc complete at all heights. | - | M2 | - | - |
| 8 | Providing AC Corrugated/semi corrugated ridge capping with 7 mm or nearest dia and suitable length GI hooks/bolts and nuts, GI and bitumen washers etc,providing required overlaps at ends including cost of all materials including ridge, scaffolding charges etc complete at all heights. | - | M | - | - |
| 9 | Painting with one coat of zinc chromate yellow metal primer and two coats of synthetic enamel paint using approved brand & quality at all heights after cleaning the surface by using waterjet spray/ manually including cost of all paint and materials, labour charges, etc.complete as per deptl instructions. | - | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Unpriced_bid.pdf
Tender Documents • 0.10 MB
BOQ_950444.xls
BOQ • 0.31 MB
Tender_docs.pdf
Tender Documents • 2.71 MB
Compliance_statement.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].