Loading…
Loading…
Tender Value
₹31.5 L
EMD Value
₹31,480
Closing Date
23 May 2026, 4:00 pmClosed
HOD M and S and Contracts
HOD M and S and Contracts BIOM Bacheli Complex
Repair of 03 no 195 HP DC Propel motor Armature, 03 no 130 HP DC crowd motor Armature and Replacement of one no Rotor Shaft of Crowd Motor Armature of Electric Rope shovels 182M
2026_NMDC_836127_1
GEM/2026/B/7475809
Open Tender
Miscellaneous Services
120 days
Bacheli
As per NIT
2 documents required · 2 mandatory
₹0
₹31,480
Yes
25 Apr 2026
25 Apr 2026
23 May 2026
25 Apr 2026
23 May 2026
25 Apr 2026
Repair of Propel motor armature,195 HP,475V,Make _GE
a) Complete rewinding of armature with EC
Grade DGC and associated works
b) Re-stacking of the core if required
c) Insulation & varnish with F class
d) Rotor truness checking & dynamic balancing
e) To perform all the required tests as per standard
f) Replacement of commutator with new one
g)One side transportation ( After repairs from your work shop to NMDC Bacheli)
Salvage value of old copper (i.e. winding wire & commutator) which is removed from Armature ( (50 KG for Each Armature , Total =50 *3 =150 Kg)
Repair of Crowd motor armature,130HP,475V,Make _GE
a) Complete rewinding of armature with EC
Grade DGC and associated works
b) Re-stacking of the core if required
c) Insulation & varnish with F class
d) Rotor truness checking & dynamic balancing
e) To perform all the required tests as per standard
f) Replacement of commutator with new one
g)One side transportation ( After repairs from your work shop to NMDC Bacheli)
Salvage value of old copper (i.e. winding wire & commutator) which is removed from Armature (40 KG for Each Armature , Total =40 *3 =120 Kg)
Replacement of rotor Shaft of crowd armature
Total Amount excluding GST [1+2+3]
Total Amount incl. GST [4+5]
Toal amount excl. GST [1A+2A]
Total Amount incl. GST [7+8]
Gross Total Amount [6-9]
1. Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid.
2.In case some or many of the items of BOQ are left blank, the offer and subsequent evaluation shall be treated as per the manner specified in Corporation's manuals.
4.Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
NIT.pdf
Tender Documents • 2.10 MB
BOQ.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid