| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC PLEASE SEE THE FINANCIAL EVALUATION UPLOADED | |
| 2 | L2₹4.2 L+₹22,230.17 (5.57%)Rejected-AOC | L2 | Rejected-AOC PLEASE SEE THE FINANCIAL EVALUATION UPLOADED | |
| 3 | L3₹4.3 L+₹32,422.75 (8.12%)Rejected-AOC | L3 | Rejected-AOC PLEASE SEE THE FINANCIAL EVALUATION UPLOADED | |
| 4 | L4₹4.4 L+₹42,102 (10.5%)Rejected-AOC | L4 | Rejected-AOC PLEASE SEE THE FINANCIAL EVALUATION UPLOADED |
Tender Value
₹4.6 L
EMD Value
₹9,300
Closing Date
30 Nov 2020, 3:00 pmClosed
Director, Directorate of Lighthouses and Lightship
DIRECTORATE OF LIGHTHOUSES AND LIGHTSHIPS DEEP BHAVAN, PORT RESIDENTIAL AREA, SALIGRAMPURAM, VISAKHAPATNAM - 530 024
Construction of 20,000 Lt. underground RCC water sump at Antervedi Lighthouse cum DGPS Station
2020_DGLL_597207_1
MT-VSP-02002(08)/3/2020-MAINT
Open Tender
Civil Works
Works
90 days
Antervedhi.Lighthouse, Antervedipalem(post), East
EMD etc.
9 documents required · 9 mandatory
₹0
₹9,300
Deep Bhavan, Port Residential Area Saligramapuram,
1 Feb 2021
13 Nov 2020
1 Dec 2020
13 Nov 2020
30 Nov 2020
13 Nov 2020
13 Nov 2020 - 23 Nov 2020
23 Nov 2020
Amount
Earth work in excavation in all kinds of soil in trenches for foundation and area not exceeding 10 Sq.mt on plan including dressing of sides and ramming of bottoms, lift up to 2.03 m including stacking the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m in all kind of soils including supply of all materials, tools & plants, labours, scaffoldings, and all other charges etc. complete.
Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out metre water as required depth 20% Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. (Rate considerd 20% of the total earth work amount for dewatering per meter depth)
Providing & Laying of Dry stone pitching 22.5 cm thick under floors, ramps, roads and pathways as per drawing and wherever directed with approved quality stone, by proper hand packing, consolidation by rolling/ramming as required filling interstices with spalls and sand all as per standard specifications and as directed, consolidating to required gradient and camber, watering including cost of all labour, materials, tools and plants etc., complete.including cost of all materials, labours, tools & plants and all other charges etc., complete.
Providing and laying Cement Concrete in foundation bed with 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) upto floor two level including laying, compacting, curing as directed by the engineer in charge including cost of all materials, labours, tools & plants and all other charges etc., complete.
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but including the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Raft foundation
230 mm thick side Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Top Roof Slab
Add extra cement over specified Design mix (aprx. 60kg/Cum)
providing steel reinforcement Fe-500D of approved brand (SAIL, TATA TISCON, VIZAG STEEL ) including Supplying, cutting, bending, placing in position, binding of tested Tor steel reinforcement of approved 1st quality for R.C.C. work as per drawing and as directed at all heights including cost of all labour, materials, tools & plants etc., and other charges complete.
Providing of Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete, Suspended floors, roofs, landings, balconies and access platform, Columns, Pillars, Piers, Abutments, Posts and Struts and Stairs, (excluding landings) except spiral-staircases including cost of all labour, materials, tools & plants etc., and other charges complete.
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platform.
20 mm thick cement plaster with CM 1:3 in two coats, backing coat 15 mm and finishing coat 5 mm thick on rough side of brick masonry surfaces and Concrete surfaces for Eexterior plastering up to floor two level, including and finished even and smooth in CM 1 : 3 including supply of all material,labours, tools & plants and all other charges etc., complete.
Providing and laying water proofing treatment for inside Sump etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. (The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.)
Supplying and fixing of 455x610 mm rectangular C.I. cover (light duty) the weight of the cover to be not less than 23 kg and frame to be not less than 8.1 kgs all as per drawing, standard specifications and as directed including cost of material,labours, tools & plants and all other charges etc., complete.
M/s-U. TECH SERVICE
MEPF INFRA
THANMAYEE ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .