Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹66.7 L
Closing Date
5 Aug 2026, 6:00 pm
Chief Engineer (O&M), DGVCL, Corporate Office
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All Items/Material required to complete works for Turnkey Based Contract For Conversion of Existing LT Line Network Including Consumer Service Lines Into Under Ground Cable Network using FSP/MSP & Ring Main System at Bardoli Town-A Sub-Division of Bardoli Division of Surat Rural Circle Under DGVCL with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under Gujarat Wire Free City Mission (GWFCM)
324439
DGVCL/O&M/GWFCM/2026-27/ Bardoli Town-A
Open
Electrical
Turn-key
Surat
11 documents required · 11 mandatory
₹11,800
DAKSHIN GUJARAT VIJ COMPANY LIMITED
₹66.7 L
15 Jul 2026
15 Jul 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
BoQ view By Sub-division
Name of Sub-Dvision Bardoli Town-A
Supply, Installation, Testing & Commissioning for Conversion of Existing LT Electrical Network into Underground Cable Network with Associated Activities under
jurisdiction area of Bardoli Town-A (Mahanagarpalika/Nagarpalika/Taluka/Town) Sub-division for all Feeders under Gujarat Wire Free City Mission (GWFCM)- GoG
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
A Supply Installation Testing & Commissioning of LT FSP-MSP-BUSBAR & It's Accessories as per attached Technical Specification
FSP (Fuse Section Piller) 800 Amp : Supplying and erecting
120x100x40 cms. Fuse section pillar fabricated from 4 mm thick
Thermosetting Plastic(moulded in a single piece) i.e. Glass
Reinforced Polyester Sheet Moulding Compound (SMC) with cable
clamps to be burried in ground to have appropriate erection on look
uniform unit erected with cement concrete foundation and 60 cms
high brick masonary internal supported on both side with internal and
1 outer side locking arrangement with lock and keys in duplicate. Nos 6 120194.80 721168.80 6 4577.22 27463.32
Incoming switchgear SFU of 800 Amp TPN and outgoing HRC SMC
fuse base and kinfe type links 32 Amp to 630 Amp. capacity, fuse
base fitted on 630 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming 1 Core 300 Sq.mm 4 Nos. and outgoing 5/6 nos.
3.5 core cables of suitable sizes.( As per Technical specification of
FSP (Fuse Section Piller) 630 Amp: Supplying and erecting
120x100x40 cms. Fuse section pillar fabricated from 4 mm thick
Thermosetting Plastic(moulded in a single piece) i.e. Glass
Reinforced Polyester Sheet Moulding Compound (SMC) with cable
clamps to be burried in ground to have appropriate erection on look
uniform unit erected with cement concrete foundation and 60 cms
high brick masonary internal supported on both side with internal and
2 outer side locking arrangement with lock and keys in duplicate. Nos 228 96594.80 22023614.40 228 4577.22 1043606.16
Incoming switchgear SFU of 630 Amp TPN and outgoing HRC SMC
fuse base and kinfe type links 32 Amp to 630 Amp. capacity, fuse
base fitted on 630 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming 1 Core 300 Sq.mm 4 Nos. and outgoing 5/6 nos.
3.5 core cables of suitable sizes.( As per Technical specification of
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
FSP (Fuse Section Piller) 400 Amp: Supplying and erecting
120x100x40 cms. Fuse section pillar fabricated from 4 mm thick
Thermosetting Plastic(moulded in a single piece) i.e. Glass
Reinforced Polyester Sheet Moulding Compound (SMC) with cable
clamps to be burried in ground to have appropriate erection on look
uniform unit erected with cement concrete foundation and 60 cms
high brick masonary internal supported on both side with internal and
3 outer side locking arrangement with lock and keys in duplicate. Nos 44 84794.80 3730971.20 44 4577.22 201397.68
Incoming switchgear SFU of 400 Amp TPN and outgoing HRC SMC
fuse base and kinfe type links 32 Amp to 630 Amp. capacity, fuse
base fitted on 630 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming 1 Core 300 Sq.mm 4 Nos. and outgoing 5/6 nos.
3.5 core cables of suitable sizes.( As per Technical specification of
MSP (Mini Section Piller) 400 Amp: Supplying and erecting with
rain hood shall be 1370(H) x 735 (W) x 516 (D)mm. Mini section
pillar fabricated from 3.15 mm. mm thick Thermosetting
Plastic(moulded in a single piece) i.e. Glass Reinforced Polyester
Sheet Moulding Compound (SMC) with cable clamps to be burried in
ground to have appropriate erection on look uniform unit erected with
cement concrete foundation and 60 cms high brick masonary internal
4 supported on both side with internal and outer side locking Nos 556 35695.00 19846420.00 556 4577.22 2544934.32
arrangement with lock and keys in duplicate. Incoming HRC SMC
fuse base and kinfe type links 32 Amp to 250 Amp. capacity, fuse
base fitted on 250 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming 1 Core 300 Sq.mm 4 Nos. and outgoing 5/6 nos.
3.5 core cables of suitable sizes.( As per Technical specification of
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
MSP (Mini Section Piller) 200 Amp : Supplying and erecting with
rain hood shall be 1370(H) x 735 (W) x 516 (D)mm. Mini section
pillar fabricated from 3.15 mm. mm thick Thermosetting
Plastic(moulded in a single piece) i.e. Glass Reinforced Polyester
Sheet Moulding Compound (SMC) with cable clamps to be burried in
ground to have appropriate erection on look uniform unit erected with
cement concrete foundation and 60 cms high brick masonary internal
5 supported on both side with internal and outer side locking Nos 833 23895.00 19904535.00 833 4577.22 3812824.26
arrangement with lock and keys in duplicate. Incoming HRC SMC
fuse base and kinfe type links 32 Amp to 250 Amp. capacity, fuse
base fitted on 250 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming 1 Core 300 Sq.mm 4 Nos. and outgoing 5/6 nos.
3.5 core cables of suitable sizes.( As per Technical specification of
SFU: Supply, Instalation, Testing, Commissioning switch fuse unit
made by SMC box and capacity of 400 A, Mostaly used in flat area.
Installation worked caried out with instruction of EIC. And as per the
drawing approved by CA- Minimum 16 Nos. Of Circuit
SFU: Supply, Instalation, Testing, Commissioning switch fuse unit
made by SMC box and capacity of 200 A, Mostaly used in flat area.
7 Installation worked caried out with instruction of EIC. And as per the Nos 191 21712.00 4146992.00 191 1357.00 259187.00
drawing approved by CA - Minimum 16 Nos. Of Circuit
Supply ,Installation,Testing & Commissioning of Busbar Chamber
8 capacity of 100 Amp.Installation worked caried out with instruction of Nos 1515 10165.70 15401035.50 1515 1180.00 1787700.00
Preparing and supply of complete drawing Society/Transformer wise
(In soft & Hard Copy) from road centre level including jointing
locations etc. for cable laid routes in six sets. The drawing should be
geographical indicating all directions (For Turnkey Projects Only)
WARNING TAP: For laying on trench after laying cable on trech to
provide indication cable route below land surface in underground
trench to protect cable for mechnical injuries.
(Material:Virgin LDPE/LLDPE, Width:150 mm, Thickness:250 Micron
min., Color:Yellow, Printing: "CAUTION-DGVCL ELECTRIC CABLE
BELOW-DO NOT DIG")
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
CABLE TERMINAL FERRULS: The PVC Cable terminal ferruls for
identification of phase sequence and feeder/PSS/FSP name of HT/LT
11 cables shall be provided at every termination of all cables stating Nos. 52628 23.60 1242020.80 52628 11.80 621010.40
detail as under. HT Cable :Feeder name/Phase(R/Y/B) LT Cable :
TC/FSP name/Phase(R/Y/B/N) -Digital Embosing
CABLE TAG: The PVC tag for identification of feeder/PSS/FSP/RMU
12 name of HT/LT cables shall be provided at every 10 MTR HT Nos 2802 23.60 66127.20 2802 11.40 31939.44
Feeder: Substation/Feeder LT Feeder : PSS/Transformer/FSP
Supply, Installation, Testing and commissioning erecting earth pit of
minimum bore dia. 150 mm size approved make safe Earthing
Electrode consisting Pipe in pipe Technology as per IS 3043-1987
made of corrosion free G.I. Pipes having Outer pipe dia of 48 mm
having 80-200 Micron galvanising connections, terminal dia of 12 mm
13 with constant ohmic value surrounded by highly conductive No. 1667 4546.54 7579082.18 1667 1180.00 1967060.00
compound with high charge dissipation with civil works of earthing
chamber. For Electrical installation covering Transformer
neutrals,HT & LT switchgears for independent earthing in normal soil,
Length of Pipe 2/3 mtrs.Backfilling compound 2 bags of 25 kg each
(As per technical specification and drawing) - 2000 MM electrode for
FSP & MSP Chemical Type Earthing
Supply, Installation, Testing and commissioning erecting earth pit of
minimum bore dia. 150 mm size approved make safe Earthing
Electrode consisting Pipe in pipe Technology as per IS 3043-1987
made of corrosion free G.I. Pipes having Outer pipe dia of 48 mm
having 80-200 Micron galvanising connections, terminal dia of 12 mm
14 with constant ohmic value surrounded by highly conductive No. 506 6341.32 3208707.92 506 1180.00 597080.00
compound with high charge dissipation with civil works of earthing
chamber. For Electrical installation covering Transformer
neutrals,HT & LT switchgears for independent earthing in normal soil,
Length of Pipe 2/3 mtrs.Backfilling compound 2 bags of 25 kg each
(As per technical specification and drawing) - 3000 MM electrode for
CSS/Transformer-Chemical Type Earthing
Supply, Installation & commissioning of earthing conductor 25 x
mm G.I. strip for pole mounted transformer and upto FSP, MSP Etc
as well as connection to be made to the earth pit. Rates inclusive of
hot dipped hardwares.(With Isulated Sleeve)
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
LT cable saddling works: Direct cable saddleing with and within wall
16 and etc for this work GI type saddle and nail shall be used.(Rate of No. 0 0.00 0.00 69034 21.24 1466282.16
fixing of clip and nails to be considered with all sundry material).
Providing and applying painted pointed lettering of 2-inch size on
FSP, MSP, SFU, etc., at any location as directed by the Engineer-in-
Charge, including supply of approved paint, surface preparation, and
all labour, materials, tools, and incidental charges, complete.
LT XLPE CABLE: Supply Installation Testing & Commissioning of XLPE(IS:7098) (I)-88 ISI marked Armoured cable multistrand Aluminium conductor for 1.1 kV to be
B laid by digging cable trench method (IS:1255) of following size of cables.(Including rate of Half Round Muff Size-1" thick, 6"dia. Having minimum length 12" half round
cement pipes -Open Excavation Method-As per attached Technical Specification & Methodolgy
1 1C X 300 Sqmm LT Cable (TC to FSP by saddling) Meter 1976 754.02 1489943.52 0 0.00 0.00
2 1C X 400 Sqmm LT Cable (TC to FSP by saddling) Meter 48 972.32 46671.36 0 0.00 0.00
8 4 C X 95 mm2 Aluminium LT Cable Meter 944 720.98 680605.12 283 286.74 81147.42
9 4 C X 70 mm2 Aluminium LT Cable Meter 240 538.08 129139.20 72 237.18 17076.96
10 4 C X 50 mm2 Aluminium LT Cable Meter 112 413.00 46256.00 34 237.18 8064.12
11 4 C X 25 mm2 Aluminium LT Cable Meter 424 257.24 109069.76 127 237.18 30121.86
12 4 C X 16 mm2 Aluminium LT Cable Meter 1664 181.72 302382.08 499 237.18 118352.82
14 2C X 10 mm2 Aluminium LT Cable Meter 5600 70.21 393176.00 1680 237.18 398462.40
LT XLPE CABLE: Supply Installation Testing & Commissioning of XLPE(IS:7098) (I)-88 ISI marked Armoured cable multistrand Aluminium conductor for
C kV to be laid by push through method of following size of cables(Including rate of HDPE Pipe-Size of HDPE Pipe is attached)-Push Through Digging Method-
As per attached Technical Specification
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
8 4 C X 95 mm2 Aluminium LT Cable Meter 1416 720.98 1020907.68 142 848.42 120475.64
9 4 C X 70 mm2 Aluminium LT Cable Meter 360 538.08 193708.80 36 479.08 17246.88
10 4 C X 50 mm2 Aluminium LT Cable Meter 168 413.00 69384.00 17 479.08 8144.36
11 4 C X 25 mm2 Aluminium LT Cable Meter 636 257.24 163604.64 64 479.08 30661.12
12 4 C X 16 mm2 Aluminium LT Cable Meter 2496 181.72 453573.12 250 479.08 119770.00
14 2C X 10 mm2 Aluminium LT Cable Meter 8400 70.21 589764.00 840 479.08 402427.20
LT Cable Termination: Supply Installation Testing & Commissioning of Cable Termination and errection on LT Pole, FSP, MSP, LT Distribution Trasformer
Box of pole mounted trasformer/transformer center LT side of LT cable grade as specified below. LT CABLE including cutting,stripping of
cable,insulations,providing compression type terminals,suitable cable glands,crimping lugs with necessary connections.Work carried out up to consumer
premises with meter shifting, and provide load side cable as per site conditions and as per EIC. All the accessories in the scope of bidders.
9 4 C X 70 mm2 Aluminium LT Cable Nos 60 1049.02 62941.20 60 73.16 4389.60
10 4 C X 50 mm2 Aluminium LT Cable Nos 28 948.72 26564.16 28 73.16 2048.48
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
Providing, supplying, laying, fixing and commissioning of Green color Hose Pipe for LT armored service cable protection/saddling work in consumer
E premises where digging is not possible up to energy meter location, including all accessories such as saddles, clamps, clips, bends, fastening materials
etc. complete in all respect as per technical specification.(Saddleing with and within wall and etc, for this work GI type saddle and nail shall be used)
1 Green color Hose Pipe of Size 40mm/32mm Meter 65418 140.00 9158520.00 65418 21.24 1389478.32
2 Green color Hose Pipe of Size 77mm/63mm Meter 84 430.00 36120.00 84 21.24 1784.16
3 Green color Hose Pipe of Size 90mm/75mm Meter 180 480.00 86400.00 180 21.24 3823.20
F Backfilling and Restoration Work including removing / demolition of existing .
Demolition & Providing and laying cement concrete 1:2:4 (1-Cement:
2- coarse sand: 4- hand broken stone aggregates 40 mmnominal
size) and curing complete excluding cost of formwork (For 0.15m
thick concrete)
Removing & Re-fixing Paver block /pre-cast Rubber Dye / steel Dye
Inter locking concrete block 60mm thick with grade of concrete M300
pnumatic compressed/vibrated mechanically and as per approved
2 design Confirming to IS 15658: 2006 including 35 mm Sand layer for Sq. mtr 0 0.00 0.00 6019 438.96 2642100.24
levelling and filling the joint with sand in proper line and level as per
guidlines of IRC: SP 63-2018 etc. Complete in true line and level as
directed by EIC.
G DISMENTALLING WORK:
Dismentaling of LT ABC OF 3*50 SQ MM +1*25 SQ MM+1*35 SQ
MM and crediting fitting of all accessories to departmental store.
Dismentaling of LT ABC OF 1*35 SQ MM + 1*25 SQ MM and
crediting fitting of all accessories to departmental store.
Dismentaling of LT ABC OF 2*50 SQ MM +1*25 SQ MM+ 35 SQ MM
and crediting fitting of all accessories to DGVCL store.
4 Dismentaling of bare Conductor and crediting to DGVCL Store COND 0 0.00 0.00 2 2709.28 5418.56
Dismentaling & removing of service line from pole & crediting to
concern sub-divn offices (1 ph.)
Dismentaling & removing of service line from pole & crediting to
concern sub-divn office s(3 ph.)
Dismentalling of 8 Mtr PSC Pole including all components (Old
fabication,guy set,pin/Disc Insulator,Nut-Bolt etc.) with crediting of
fabrication at store & stacking of pole safely on road side or crediting
Dismentaling Of Rsj (9/11 Meter) Pole including all components (Old
8 fabication,guy set,pin/Disc Insulator,Nut-Bolt etc.)And Crediting to Nos 0 0.00 0.00 243 1077.34 261793.62
Supply of Material inclusive of 18% GST Labor Charge inclusive of only 18% GST
Sr. Particulars of Item
Unit Rate Unit Rate Rs.
Unit Supply Qty. Total in Rs Erection Qty. Total in Rs
10 Dismentaling Of LT Distribution Box and Crediting to DGVCL Store Nos 0 0.00 0.00 253 481.44 121804.32
TOTAL of Material Part 234536876.57 94263796.99
2% storage charge
TOTAL Material cost
Total Labour Cost
Total cost in Cr.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. 1.1 KV CABLES PV.pdf
2. Technical Specification LT Cable.pdf
3.FSP_MSP Drawing sheet.pdf
4. Cables Tags and Markers.pdf
5. Erection Specification of LT Cabling Works.pdf
6.LT_Cable_Spec_with_laying.pdf
7. GI Earthing Pipe.pdf
8.Technical Specification for LT Cable Joints.pdf
9. Triple Pole Switch Fuse Units with Neutral Links.pdf
10. Revised Size of HDPE.pdf
11. TS FOR CIVIL WORKS.pdf
12. TS FOR FUSE SECTION PILLAR (FSP).pdf
13. TS FOR HDPE PIPES.pdf
14. TS FOR MAINTENANCE FREE EARTH FOR ELECTRICAL INSTALLATION.pdf
15. TS FOR MINI SECTION PILLAR (MSP).pdf
16. TS OF GI EARTHING STRIPS.pdf
17. TS OF MATERIALS USED FOR CIVIL WORKS.pdf
18.BoM for Removing and refixing of RCC and Paver Block.pdf
14.Bardoli Town-A_BoQ_GWFCM_FY 2026-27_33.35 Cr.pdf
14.Tender_NP-MNP_SBD_Bardoli Town-A.pdf
Download all tender documents and submit your bid