| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC C O HOTEL VASUNDHARA PLACE KAILASH GATE MUNIKI RETI TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | ₹1.5 Cr | L1 | Accepted-AOC Accepted |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
10 Mar 2023, 3:00 pmClosed
Superintending Engineer
Office of the 8th Circle, PWD, New Tehri.
Construction of pavement surface by dismantling of C.C. pavement and relaying of pavement, improvement of surface by BM and SDBC and constt. of pucca drains of PTC. Kandakhet M/R in Narendranagar constituency of district T.G. proposed in G-20 summit
2023_pwd_55506_1
1053/03Cash-Tender-8/2022 Date 25-02-2023
Open Tender
Civil Works - Roads
Item Rate
60 days
Narendranagar Tehri Garhwal
As Per Tender Notice, Technical Bid and BOQ
2 documents required · 2 mandatory
₹5,900
EE CD PWD Narenderanagar
₹3.2 L
8th Circle, PWD, New Tehri.
7 Sept 2023
27 Feb 2023
10 Mar 2023
27 Feb 2023
10 Mar 2023
1 Mar 2023
1 Mar 2023
Amount
Excavation in foundation for retaining, breast walls , surfacing of roads etc, in all types of soils and rocks including all lead, lift and disposal o surplus material as perdirection of engineer- in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction also including all T&P, labour, etc. and cleaning the site dressing the same after construction of the work
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 Using naturally occuring gravel
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 (1:3:6) using concrete mixer
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.By Mechanical Means 2-5-2-A Cement Concrete
Cement Concrete (PCC M-30) Pavement:- Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then0.2 cum capacity and appropriate weigh batcher using approved mix design, laidin approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405By Manual Means
Prime Coat 5-1-1 Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 50
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)with Bitumen VG-10
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respectsmix) 10,741.20 Cum 3-5-2 Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix
Maintenance of Earhen shoulder (stripping of excess soil/ filling in dip portion using locally availabe soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 11-4-3-1 Nominal mix (1:2:4) using concrete mixer
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .