| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹3.8 L (2.25%)Admitted-Finance PLOT NO A 41 SECTOR 58 SECTOR 58 ROAD BIJALI GHAR GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.7 Cr+₹3.8 L (2.25%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹5.2 L (3.09%)Admitted-Finance | ₹1.7 Cr+₹5.2 L (3.09%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹7.6 L (4.56%)Admitted-Finance | ₹1.7 Cr+₹7.6 L (4.56%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹8.0 L (4.82%)Admitted-Finance | ₹1.8 Cr+₹8.0 L (4.82%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Svasca Industries (India) Ltd. L1 | ABC TRANSFORMERS PVT LTD L2 | Modern Transformers Pvt. Ltd. L3 | VINDHYA WIRES L4 | J P Electrical Industries L5 | Associated Electricals (Gzb) Pvt. Ltd. L6 | DD INFRAVENTURE PVT. LTD. L7 | A.Q. INDUSTRIES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.003 MVA Repairing | |||||||||||
| 1.01 | HV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coil assembly..(The rate shall be Variable) | 650 | Kg. | - | - | - | - | - | - | - | - |
| 1.02 | LV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coils assembly.(The rate shall be Variable) | 650 | Kg. | - | - | - | - | - | - | - | - |
| 1.03 | Fresh transformer oil of approved quality as per IS: 335/83 and latest amendment thereof.(The rate shall be Variable) | 2,530 | Ltr | - | - | - | - | - | - | - | - |
| 1.04 | Burnt / damaged leg coils to be retained by the contractor.(The rate shall be Variable) (These items (Burnt / damaged leg coils) damaged metal parts are to be retained by the contractor. Tax as legally payable by UPCL on sale of these items shall be recovered from the repair bill of the contractor. Executive Engineer, Electy Stores Division shall ensure payment of the amount so recovered with tax department. in accordance with the regulation of tax on the subject.) | 1,300 | Kg. | - | - | - | - | - | - | - | - |
| 1.05 | Damaged metal parts of bushing to be retained by contractor.(The rate shall be Firm) | 4 | Kg. | - | - | - | - | - | - | - | - |
| 1.06 | HV bushing 33 KV(The rate shall be Firm) | 3 | No. | - | - | - | - | - | - | - | - |
| 1.07 | LV bushing (11 KV)(The rate shall be Firm) | 4 | No. | - | - | - | - | - | - | - | - |
| 1.08 | HV bushing Metal parts.(The rate shall be Firm) | 3 | No. | - | - | - | - | - | - | - | - |
| 1.09 | LV Bushing Metal parts.(The rate shall be Firm) | 4 | No. | - | - | - | - | - | - | - | - |
Tender Value
₹6.3 Cr
EMD Value
₹12.6 L
Closing Date
1 Jul 2020, 5:00 pmClosed
SE-II
VCV GABAR SINGH URJA BHAWAN DEHRADUN
FOR 80 NOS. OVERHAULING AND REPAIRING 33/11 KV, 3MVA TO 10MVA OLD AND USED AND DAMAGED POWER TRANSFORMER
2020_UPCLC_23376_5
CCP-II/35/2019-2020
Open Tender
Electrical Works
Item Rate
180 days
UTTARAKHAND
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,600
Yes
Executive Engineer, Electricity Store Division,
₹12.6 L
Yes
19 Oct 2020
22 Jun 2020
2 Jul 2020
22 Jun 2020
1 Jul 2020
26 Jun 2020
3 MVA Repairing
HV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coil assembly..(The rate shall be Variable)
LV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coils assembly.(The rate shall be Variable)
Fresh transformer oil of approved quality as per IS: 335/83 and latest amendment thereof.(The rate shall be Variable)
Burnt / damaged leg coils to be retained by the contractor.(The rate shall be Variable) (These items (Burnt / damaged leg coils) damaged metal parts are to be retained by the contractor. Tax as legally payable by UPCL on sale of these items shall be recovered from the repair bill of the contractor. Executive Engineer, Electy Stores Division shall ensure payment of the amount so recovered with tax department. in accordance with the regulation of tax on the subject.)
Damaged metal parts of bushing to be retained by contractor.(The rate shall be Firm)
HV bushing 33 KV(The rate shall be Firm)
LV bushing (11 KV)(The rate shall be Firm)
HV bushing Metal parts.(The rate shall be Firm)
LV Bushing Metal parts.(The rate shall be Firm)
Set of gaskets.(The rate shall be Firm)
Silica-gel breather with fresh silica-gel(The rate shall be Firm)
Magnetic type oil level gauge with low level alarm contact.(The rate shall be Firm)
Tapping Switch complete with handle.
Oil drain valve incorporating sampling device (with narrow orifice) and having suitable arrangement for locking.(The rate shall be Firm)
Filter valve(The rate shall be Firm)
Dial type thermometer of 150 dia with max. temp. indicator complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Double float bucholz relay complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Air release plug(The rate shall be Firm)
Replacement of damaged core and lamination(The rate shall be Firm)
Pair of arcing horns(The rate shall be Firm)
Radiator valve(The rate shall be Firm)
Overhauling of OLTC
Replacement of OLTC contact(The rate shall be Firm)
Replacement of OLTC terminal barrier board(The rate shall be Firm)
Replacement of gaskets, lubrication of mechanical system(The rate shall be Firm)
M.S. clamping rings(The rate shall be Firm)
Winding temperature indicator (complete set)(The rate shall be Firm)
Sundry item viz. cover bolts ,plug caps, screw washers, insulation materials ,minor repairs of tank other parts required if any, Aluminium name plate etc.(The rate shall be Firm)
LABOUR CHARGES
(a) Preliminary inspection of transformers involving minor repair at UPCL site / workshop (The rate shall be Firm)
(b) Detailed inspection of transformers at repairer works for assessment & estimation involving major repairs of transformer as detailed below: - Opening of transformers cover , draining of oil, if any, de-tanking core and coil assembly, replacement of damaged parts, minor repair of any part including core and tank (if required), cleaning washing of dust & dirt etc. from all parts including core and tank, Cooling tubes of radiators, removal of damaged parts requiring replacement, fitting & fixing of new parts, making connection & assembly complete in all respects, re-tanking after repairs, filling fresh transformer oil, making transformer ready for tests and testing for all tests as per clause No. 16 of Technical Specification.(The rate shall be Firm)
Painting inside & outside of transformer including radiator tubes conservator with suitable primer and two coats of suitable paint of smoke grey colour and marking etc.(The rate shall be Firm)
Transportation charges from any site in Uttarakhand /Workshop to contractor works & from contractor works to UPCL site / Store center including packing forwarding loading unloading stacking and transit cum 30 days storage insurance charges (The rate shall be Firm)
Manual Dragging charges from road side to Plinth / plinth to road side (The rate shall be Firm)
Description of Work / Item(s)
10MVA Overhauling - Plain
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Plain Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Description of Work / Item(s)
5MVA Repairing
HV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coil assembly..(The rate shall be Variable)
LV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coils assembly.(The rate shall be Variable)
Fresh transformer oil of approved quality as per IS: 335/83 and latest amendment thereof.(The rate shall be Variable)
Burnt / damaged leg coils to be retained by the contractor.(The rate shall be Variable) (These items (Burnt / damaged leg coils) damaged metal parts are to be retained by the contractor. Tax as legally payable by UPCL on sale of these items shall be recovered from the repair bill of the contractor. Executive Engineer, Electy Stores Division shall ensure payment of the amount so recovered with tax department. in accordance with the regulation of tax on the subject.)
Damaged metal parts of bushing to be retained by contractor.(The rate shall be Firm)
HV bushing 33 KV(The rate shall be Firm)
LV bushing (11 KV)(The rate shall be Firm)
HV bushing Metal parts.(The rate shall be Firm)
LV Bushing Metal parts.(The rate shall be Firm)
Set of gaskets.(The rate shall be Firm)
Silica-gel breather with fresh silica-gel(The rate shall be Firm)
Magnetic type oil level gauge with low level alarm contact.(The rate shall be Firm)
Tapping Switch complete with handle.
Oil drain valve incorporating sampling device (with narrow orifice) and having suitable arrangement for locking.(The rate shall be Firm)
Filter valve(The rate shall be Firm)
Dial type thermometer of 150 dia with max. temp. indicator complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Double float bucholz relay complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Air release plug(The rate shall be Firm)
Replacement of damaged core and lamination(The rate shall be Firm)
Pair of arcing horns(The rate shall be Firm)
Radiator valve(The rate shall be Firm)
Overhauling of OLTC
Replacement of OLTC contact(The rate shall be Firm)
Replacement of OLTC terminal barrier board(The rate shall be Firm)
Replacement of gaskets, lubrication of mechanical system(The rate shall be Firm)
M.S. clamping rings(The rate shall be Firm)
Winding temperature indicator (complete set)(The rate shall be Firm)
Sundry item viz. cover bolts ,plug caps, screw washers, insulation materials ,minor repairs of tank other parts required if any, Aluminium name plate etc.(The rate shall be Firm)
LABOUR CHARGES
(a) Preliminary inspection of transformers involving minor repair at UPCL site / workshop (The rate shall be Firm)
(b) Detailed inspection of transformers at repairer works for assessment & estimation involving major repairs of transformer as detailed below: - Opening of transformers cover , draining of oil, if any, de-tanking core and coil assembly, replacement of damaged parts, minor repair of any part including core and tank (if required), cleaning washing of dust & dirt etc. from all parts including core and tank, Cooling tubes of radiators, removal of damaged parts requiring replacement, fitting & fixing of new parts, making connection & assembly complete in all respects, re-tanking after repairs, filling fresh transformer oil, making transformer ready for tests and testing for all tests as per clause No. 16 of Technical Specification.(The rate shall be Firm)
Painting inside & outside of transformer including radiator tubes conservator with suitable primer and two coats of suitable paint of smoke grey colour and marking etc.(The rate shall be Firm)
Transportation charges from any site in Uttarakhand /Workshop to contractor works & from contractor works to UPCL site / Store center including packing forwarding loading unloading stacking and transit cum 30 days storage insurance charges (The rate shall be Firm)
Manual Dragging charges from road side to Plinth / plinth to road side (The rate shall be Firm)
Description of Work / Item(s)
8MVA Repairing
HV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coil assembly..(The rate shall be Variable)
LV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coils assembly.(The rate shall be Variable)
Fresh transformer oil of approved quality as per IS: 335/83 and latest amendment thereof.(The rate shall be Variable)
Burnt / damaged leg coils to be retained by the contractor.(The rate shall be Variable) (These items (Burnt / damaged leg coils) damaged metal parts are to be retained by the contractor. Tax as legally payable by UPCL on sale of these items shall be recovered from the repair bill of the contractor. Executive Engineer, Electy Stores Division shall ensure payment of the amount so recovered with tax department. in accordance with the regulation of tax on the subject.)
Damaged metal parts of bushing to be retained by contractor.(The rate shall be Firm)
HV bushing 33 KV(The rate shall be Firm)
LV bushing (11 KV)(The rate shall be Firm)
HV bushing Metal parts.(The rate shall be Firm)
LV Bushing Metal parts.(The rate shall be Firm)
Set of gaskets.(The rate shall be Firm)
Silica-gel breather with fresh silica-gel(The rate shall be Firm)
Magnetic type oil level gauge with low level alarm contact.(The rate shall be Firm)
Tapping Switch complete with handle.
Oil drain valve incorporating sampling device (with narrow orifice) and having suitable arrangement for locking.(The rate shall be Firm)
Filter valve(The rate shall be Firm)
Dial type thermometer of 150 dia with max. temp. indicator complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Double float bucholz relay complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Air release plug(The rate shall be Firm)
Replacement of damaged core and lamination(The rate shall be Firm)
Pair of arcing horns(The rate shall be Firm)
Radiator valve(The rate shall be Firm)
Overhauling of OLTC
Replacement of OLTC contact(The rate shall be Firm)
Replacement of OLTC terminal barrier board(The rate shall be Firm)
Replacement of gaskets, lubrication of mechanical system(The rate shall be Firm)
M.S. clamping rings(The rate shall be Firm)
Winding temperature indicator (complete set)(The rate shall be Firm)
Sundry item viz. cover bolts ,plug caps, screw washers, insulation materials ,minor repairs of tank other parts required if any, Aluminium name plate etc.(The rate shall be Firm)
LABOUR CHARGES
(a) Preliminary inspection of transformers involving minor repair at UPCL site / workshop (The rate shall be Firm)
(b) Detailed inspection of transformers at repairer works for assessment & estimation involving major repairs of transformer as detailed below: - Opening of transformers cover , draining of oil, if any, de-tanking core and coil assembly, replacement of damaged parts, minor repair of any part including core and tank (if required), cleaning washing of dust & dirt etc. from all parts including core and tank, Cooling tubes of radiators, removal of damaged parts requiring replacement, fitting & fixing of new parts, making connection & assembly complete in all respects, re-tanking after repairs, filling fresh transformer oil, making transformer ready for tests and testing for all tests as per clause No. 16 of Technical Specification.(The rate shall be Firm)
Painting inside & outside of transformer including radiator tubes conservator with suitable primer and two coats of suitable paint of smoke grey colour and marking etc.(The rate shall be Firm)
Transportation charges from any site in Uttarakhand /Workshop to contractor works & from contractor works to UPCL site / Store center including packing forwarding loading unloading stacking and transit cum 30 days storage insurance charges (The rate shall be Firm)
Manual Dragging charges from road side to Plinth / plinth to road side (The rate shall be Firm)
Description of Work / Item(s)
10MVA Repairing
HV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coil assembly..(The rate shall be Variable)
LV leg coils complete with insulation varnishing by vacuum impregnating (if required as per sample) and baking of coils assembly.(The rate shall be Variable)
Fresh transformer oil of approved quality as per IS: 335/83 and latest amendment thereof.(The rate shall be Variable)
Burnt / damaged leg coils to be retained by the contractor.(The rate shall be Variable)
Damaged metal parts of bushing to be retained by contractor.(The rate shall be Firm)
HV bushing 33 KV(The rate shall be Firm)
LV bushing (11 KV)(The rate shall be Firm)
HV bushing Metal parts.(The rate shall be Firm)
LV Bushing Metal parts.(The rate shall be Firm)
Set of gaskets.(The rate shall be Firm)
Silica-gel breather with fresh silica-gel(The rate shall be Firm)
Magnetic type oil level gauge with low level alarm contact.(The rate shall be Firm)
Tapping Switch complete with handle.
Oil drain valve incorporating sampling device (with narrow orifice) and having suitable arrangement for locking.(The rate shall be Firm)
Filter valve(The rate shall be Firm)
Dial type thermometer of 150 dia with max. temp. indicator complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Double float bucholz relay complete with resetting device and alarm contacts etc.(The rate shall be Firm)
Air release plug(The rate shall be Firm)
Replacement of damaged core and lamination(The rate shall be Firm)
Pair of arcing horns(The rate shall be Firm)
Radiator valve(The rate shall be Firm)
Overhauling of OLTC
Replacement of OLTC contact(The rate shall be Firm)
Replacement of OLTC terminal barrier board(The rate shall be Firm)
Replacement of gaskets, lubrication of mechanical system(The rate shall be Firm)
M.S. clamping rings(The rate shall be Firm)
Winding temperature indicator (complete set)(The rate shall be Firm)
Sundry item viz. cover bolts ,plug caps, screw washers, insulation materials ,minor repairs of tank other parts required if any, Aluminium name plate etc.(The rate shall be Firm)
LABOUR CHARGES
(a) Preliminary inspection of transformers involving minor repair at UPCL site / workshop (The rate shall be Firm)
(b) Detailed inspection of transformers at repairer works for assessment & estimation involving major repairs of transformer as detailed below: - Opening of transformers cover , draining of oil, if any, de-tanking core and coil assembly, replacement of damaged parts, minor repair of any part including core and tank (if required), cleaning washing of dust & dirt etc. from all parts including core and tank, Cooling tubes of radiators, removal of damaged parts requiring replacement, fitting & fixing of new parts, making connection & assembly complete in all respects, re-tanking after repairs, filling fresh transformer oil, making transformer ready for tests and testing for all tests as per clause No. 16 of Technical Specification.(The rate shall be Firm)
Painting inside & outside of transformer including radiator tubes conservator with suitable primer and two coats of suitable paint of smoke grey colour and marking etc.(The rate shall be Firm)
Transportation charges from any site in Uttarakhand /Workshop to contractor works & from contractor works to UPCL site / Store center including packing forwarding loading unloading stacking and transit cum 30 days storage insurance charges (The rate shall be Firm)
Manual Dragging charges from road side to Plinth / plinth to road side (The rate shall be Firm)
Description of Work / Item(s)
3MVA Overhauling (Hill)
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Hill Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Description of Work / Item(s)
3MVA Overhauling - Plain
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Plain Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Description of Work / Item(s)
5MVA Overhauling - Hill
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Plain Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Description of Work / Item(s)
5MVA Overhauling - Plain
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Plain Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Description of Work / Item(s)
8MVA Overhauling - Plain
Transportation charges from any site in Uttarakhand/Work shop to contractor works & from contractor works to UPCL site/ store center including packing forwarding loading un- loading stacking and transit cum 30 days storage insurance charges (for Plain Areas)(The rate shall be Firm)
Opening nut and bolt of Top cover plate of Power Transformer Flushing of core and coil assembly of transformer by the injecting of hot transformer oil through filter machine it is to be assured that the flushing oil used should be hot, free from moisture & sludge. Cleaning of radiator with hot oil & Blowing hot dry air. Drying it in sunny weather. (The rate shall be Firm)
Supply & fixing of rubberized gasket set between top cover and top flange of power transformer by use of good quality 12 mm rubberized gasket sheet. (The rate shall be Firm)
(A) Supply & Replacement of HT Bushing of the transformer (The rate shall be Firm)
(B) Supply & Replacement of LT bushing of the transformer(The rate shall be Firm)
(A)Supply & Replacement of HT metal part of the trans former. (The rate shall be Firm)
(B) Supply & Replacement of LT metal part of the trans former including neutral bushing .(The rate shall be Firm)
Supply and fixing of silica jel breather containing of blue color size 2 to 4 mesh silica jell. Also fill the oil of oil pot of breather (The rate shall be Firm)
Supply & Replacement / Overhouling of Bucholdz relay of reputed make.(The rate shall be Firm)
Supply & filling of fresh transformer oil after dehydrating it as per specified value i.e. up to more than 50 KV BDV..(The rate shall be Variable)
Radiator should be placed in such a way that moisture could not enter into radiator's the plate should be fixed on flange of raditor, it should be open only at the time of commissionning of transformer. (The rate shall be Firm)
Supply and fixing of oil temperature and winding temperature meter of reputed make(The rate shall be Firm)
Cleaning of transformer tank, radiator and all parts from out side with water and caustic soda, removing rusted point . Painting of transformer with two coats of smoke gray synthetic enamel paint after one coat of red oxide primer paint. (The rate shall be Firm)
Repairing of marshalling box and its housing, hinges, shuters, glasses. (The rate shall be Firm)
(A) Supply & Replacement off load tap changer(The rate shall be Firm)
(B) Repair & overhauling of off load tap changer(The rate shall be Firm)
(A) Supply & Replacement of Radiator Valve(The rate shall be Firm)
(A) Supply & Replacement of Drain Valve(The rate shall be Firm)
Supply and Replacement Magnetic type Oil Level Gauge(The rate shall be Firm)
Checking of all LV, HT neutral bushing Rod connection to transformer winding. Making them perfectly intacts replace ment of all HV, LV gaskets of bushing(The rate shall be Firm)
Deputing engineer for supervision by the contractor at site during commissioning of the transformer (the work involved in erection i.e. handling of different parts assembly of trans former shall be carried out by respective agencies construct ing the sub-station)(The rate shall be Firm)
In case the erection is delayed on account of delay in lifting by users units/incomplete site work for more than 3 months and if the values of oil and winding comes down to the standard values. The contractor shall make all arrangements for dehydration to achieve proper values of transformers. The work shall be carried out after erection of transformer. (The rate shall be Firm)
Old & used transformer oil received from transformer and to be retained by the contractor.(The rate shall be Firm)
Damaged metal parts received from transformer and to be retained by contractor.(The rate shall be Firm)
Svasca Industries (India) Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
DD INFRAVENTURE PVT. LTD.
Modern Transformers Pvt. Ltd.
A.Q. INDUSTRIES
Modern Transformers Pvt. Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
DD INFRAVENTURE PVT. LTD.
A.Q. INDUSTRIES
Associated Electricals (Gzb) Pvt. Ltd.
Svasca Industries (India) Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
Modern Transformers Pvt. Ltd.
A.Q. INDUSTRIES
DD INFRAVENTURE PVT. LTD.
Svasca Industries (India) Ltd.
Modern Transformers Pvt. Ltd.
VINDHYA WIRES
J P Electrical Industries
ABC TRANSFORMERS PVT LTD
A.Q. INDUSTRIES
DD INFRAVENTURE PVT. LTD.
Associated Electricals (Gzb) Pvt. Ltd.
Modern Transformers Pvt. Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
DD INFRAVENTURE PVT. LTD.
A.Q. INDUSTRIES
Modern Transformers Pvt. Ltd.
ABC TRANSFORMERS PVT LTD
A.Q. INDUSTRIES
Associated Electricals (Gzb) Pvt. Ltd.
VINDHYA WIRES
J P Electrical Industries
DD INFRAVENTURE PVT. LTD.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
Modern Transformers Pvt. Ltd.
A.Q. INDUSTRIES
DD INFRAVENTURE PVT. LTD.
Associated Electricals (Gzb) Pvt. Ltd.
Svasca Industries (India) Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
Associated Electricals (Gzb) Pvt. Ltd.
DD INFRAVENTURE PVT. LTD.
A.Q. INDUSTRIES
Modern Transformers Pvt. Ltd.
ABC TRANSFORMERS PVT LTD
VINDHYA WIRES
J P Electrical Industries
DD INFRAVENTURE PVT. LTD.
A.Q. INDUSTRIES
Associated Electricals (Gzb) Pvt. Ltd.
ABC TRANSFORMERS PVT LTD
Modern Transformers Pvt. Ltd.
DD INFRAVENTURE PVT. LTD.
VINDHYA WIRES
J P Electrical Industries
A.Q. INDUSTRIES
Associated Electricals (Gzb) Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
PQRPARTI.xls
Tender Documents • 0.11 MB
BOQ_29107.xls
BOQ • 0.81 MB
TenderspecsTECH.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .