| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC AT CEMENT NAGAR P O BARDOL DIST BARGARH PIN 768038 | BARGARH | ODISHA | 768038 | ₹11.0 L | L1 | Accepted-AOC 1st lowest responsive bidder |
| 2 | L2₹11.3 L+₹33,919.59 (3.09%)Accepted-Technical AT BRAHMAVIHAR W N 19 P O BARGARH DIST BARGARH PIN 768028 | BARGARH | ODISHA | 768028 | ₹11.3 L+₹33,919.59 (3.09%) | L2 | Accepted-Technical Responsive |
Tender Value
₹11.3 L
EMD Value
₹11,400
Closing Date
30 May 2026, 5:00 pmClosed
Superintending Engineer, BID
At-Canal Colony, Bargarh, Odisha
Shifting of LT and 11 KV line and Substation for Construction of River Embankment cum Ring Road on the Left Bank of River Jeera from Sai Mandir to Ruhunia, Bargarh.
2026_CEBBU_129546_1
BID-04 of 2026-27 dated 15.05.2026
Open Tender
Electrical Works
Percentage
30 days
Bargarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,400
Yes
5 Sept 2026
21 May 2026
1 Jun 2026
21 May 2026
30 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of PSC pole supports 300 kg & 9 mtr long including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 4 | Nos | 5,875.47 | ₹23,501.88 |
| 2 | Cost of Transformer / Breaker / Joist Pole supports 11 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 8 | Nos | 37,998.83 | ₹3,03,990.64 |
| 3 | Cost of Transformer / Breaker / Joist Pole supports 13 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 1 | Nos | 50,777.99 | ₹50,777.99 |
| 4 | Construction of D.P mounted 11/4kv s/s with double disc….25 kva transformer. (excluding pole and transformer) (polymer type) common material including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 1 | Nos | 1,46,595.18 | ₹1,46,595.18 |
| 5 | Construction of D.P mounted 11/4kv s/s with double disc….250 kva transformer. (excluding pole and transformer) (polymer type) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 1 | Nos | 1,89,067.15 | ₹1,89,067.15 |
| 6 | Cost of 100 mm2 alloy aluminium XLPE insulated conductor including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 0.63 | Km | 1,62,960.92 | ₹1,02,665.38 |
| 7 | Cost analysis of 1km of 3-ph 50mm2 AB Cable on 9 mtr*300 kg. PSC pole for LT line(30 mtr. Span)(excluding pole) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 0.09 | Km | 6,54,799.72 | ₹58,931.97 |
| 8 | cost of LT stay set including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 2 | Nos | 4,943.66 | ₹9,887.32 |
| 9 | 11KV single pole cut point(excluding pole)(polymer) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 1 | Nos | 58,554.99 | ₹58,554.99 |
| 10 | 11kv Intermidiate rsj/psc pole including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. | 4 | Nos | 9,379.81 | ₹37,519.24 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592008.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
04BidDocument01.pdf
Tender Documents • 2.26 MB
BOQ_592008.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .