Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹37.2 Cr
EMD Value
₹5 L
Closing Date
28 Aug 2023, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MR Harimangal Singh
PHED RAIPUR
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon of size 7X3 mtr at Gej Dam, Raw Water Electric Sub-station 100 KVA/11/0.415 KV with all required Work, Raw water HSCF pumps set and motors 3 no-25BHP havingDischarge of 370495 LPH against 28.0 m head at floating pumping station site, 6.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors -03 nos 90BHP having discharge of 177838 LPH against 160 m head , Clear Water Electric Sub station 200 KVA/11/0.415 KV with all required Work at WTP Site, 170 KL capacity 15 staging MBR-1 no at village Chharchha, 295 KL capacity 28 staging MBR-2 no at village Murma , 350 KL capacity 30 m staging MBR- 3 no at village Patna, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9, 350 mm Dia Length 200 m and Clear water pumping main 150 mm Dia DI K-9 Length 50 m, 250 mm dia length 4550 m, 300 mm dia length 9500 m, 350 mm dia length 2500 m, Total 16600 m & Clear Water Gravity Mains pipe OPVC pipe PN 16: 250mm dia 11898m, 160 mm dia – 28325 m, 110 mm dia – 48262m, & DI K-7, 300 mm dia - 8009 m. Total Length- 96494 m with all required valves & specials,as per attached key plan map, Providing and fixing Bulk flow meters, nala crossing and work include taking permission to PWD, WRD deptt. etc. Allied All civil works including Boundary wall around WTP campus completion period 12 months including rainy season Integration of all components comprises of 03 month testing & 09 month trial run under BARDIYA Group Water Supply Scheme of Block- BAIKUNTHPUR, District KOREA (C.G.)
144680
293/Tendercell/CE/PHED/Raipur Date 16-08-2023
RESTRICTED TENDER
WORKS
PERCENTAGE
12 days
PHED RAIPUR
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Public Health Engineering Department (PHED)
WORKS
MR Harimangal Singh
RESTRICTED TENDER
PERCENTAGE
A
PHED RAIPUR
O/O CHIEF ENGINEER ZONE RAIPUR (TENDER CELL)
O/O CHIEF ENGINEER ZONE RAIPUR
120
12
No
0
144680
28 Aug, 2023 5:30:00 PM IST
29 Aug, 2023 5:31:00 PM IST
18 Aug, 2023 10:00:00 AM IST
293/Tendercell/CE/PHED/Raipur Date 16-08-2023
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon of size 7X3 mtr at Gej Dam, Raw Water Electric Sub-station 100 KVA/11/0.415 KV with all required Work, Raw water HSCF pumps set and motors 3 no-25BHP havingDischarge of 370495 LPH against 28.0 m head at floating pumping station site, 6.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors -03 nos 90BHP having discharge of 177838 LPH against 160 m head , Clear Water Electric Sub station 200 KVA/11/0.415 KV with all required Work at WTP Site, 170 KL capacity 15 staging MBR-1 no at village Chharchha, 295 KL capacity 28 staging MBR-2 no at village Murma , 350 KL capacity 30 m staging MBR- 3 no at village Patna, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9, 350 mm Dia Length 200 m and Clear water pumping main 150 mm Dia DI K-9 Length 50 m, 250 mm dia length 4550 m, 300 mm dia length 9500 m, 350 mm dia length 2500 m, Total 16600 m & Clear Water Gravity Mains pipe OPVC pipe PN 16: 250mm dia 11898m, 160 mm dia – 28325 m, 110 mm dia – 48262m, & DI K-7, 300 mm dia - 8009 m. Total Length- 96494 m with all required valves & specials,as per attached key plan map, Providing and fixing Bulk flow meters, nala crossing and work include taking permission to PWD, WRD deptt. etc. Allied All civil works including Boundary wall around WTP campus completion period 12 months including rainy season Integration of all components comprises of 03 month testing & 09 month trial run under BARDIYA Group Water Supply Scheme of Block- BAIKUNTHPUR, District KOREA (C.G.)
500000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
372186000.00
2
29 Aug, 2023 5:30:00 PM IST
372186000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
15 documents required · 14 mandatory · 1 optional
₹0
₹5 L
28 Aug 2023
18 Aug 2023
29 Aug 2023
18 Aug 2023
29 Aug 2023
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .