| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.1 L+₹47,474.42 (3.04%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹16.5 L+₹85,782.07 (5.50%)Rejected-AOC ELID EWS SECTION ASSISTANT ENGINEER KANJIRAPUZHA GRAMAPANCHAYAT POTTASSERY P O | PATHANAMTHITTA | KERALA | 689694 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹44,700
Closing Date
12 Nov 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer,KPIP Division No.1 ,Kanhirapuzha
Rectification works to canal
2020_Irrig_396998_1
30/E-TN/KPIP/2020-21
Open Tender
Civil Works - Canal
Item Rate
120 days
KANHIRAPUZHA
Contractor must have valid contractor license and GST registration
6 documents required · 6 mandatory
₹2,996
Yes
₹44,700
Yes
15 Jan 2021
4 Nov 2020
17 Nov 2020
4 Nov 2020
12 Nov 2020
4 Nov 2020
4 Nov 2020 - 6 Nov 2020
Amount
Civil work
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Abdul Sathar
SULAIMAN M K
Bidder Name
SULAIMAN M K
Abdul Sathar
FAISAL K K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_565095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .