| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.3 L+₹35,349.33 (11.8%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,880
Closing Date
3 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, PWD CITY DIVISION, JODHPUR
EXECUTIVE ENGINEER, PWD CITY DIVISION, JODHPUR
Day to Day Repair and Maintenance work at H/V Type RHC Staff Qtr. Sardar Patel Colony, Jodhpur
2026_CEPWD_604868_7
NIT No 19 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Jodhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
E E, PWD CITY DIVISION, JODHPUR/MDRISL JAIPUR
₹7,880
Yes
4 Nov 2026
27 Oct 2026
4 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge : 1: 4: 8 or leaner mix. | 6 | Cum | 432 | ₹2,592 |
| 2 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 40 | Sqm | 88 | ₹3,520 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:
All kinds of soil | 10.8 | Cum | 175 | ₹1,890 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 3.6 | Cum | 3,962 | ₹14,263.2 |
| 5 | Repair to damaged RCC slabs, beams and columns etc for strengtheing with cement mortar 1 : 2 in following steps
i) Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.
ii) Applying Epoxy primer on the exposed steel bars.
iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concrete and steel bars with brush.
iv)Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.
v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.
vi) Cure the plastered surface for 15 days
All work including scaffolding etc. complete in all respect. | 7.5 | Sqm | 1,725 | ₹12,937.5 |
| 6 | Providing and fixing 1st quality MAT finished ceremic tile size 300x300mm confirming to IS : 13755 and IS : 15622 colour such as white, grey, ivory, fume red brown, light green, light blue and other light shades in floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the cost of cement mortar bed 1:4). | 12 | Sqm | 823 | ₹9,876 |
| 7 | Providing and fixing 1st quality MAT & GLOSSY finished ceramic tile confirming to IS : 13755 and IS : 15622 colour such as white, grey, ivory, fume red brown, light green, light blue and other light shades in floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the cost of cement mortar bed 1:4).Size 300mm x 450mm, thicknes 7mm to 8mm | 9 | Sqm | 890 | ₹8,010 |
| 8 | Add extra for Fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymer modified quick-set tile adhesive (Water based) conforming to IS: 15477 , using 5kg. adhesive per sqm of tile area, in average 3mm thickness instead of cement mortar. | 9 | Sqm | 141 | ₹1,269 |
| 9 | Providing & Fixing of ward robe shutters made out of 19mm thick BWP block board ISI of superior quality make with following details :-Front side finishing with 1mm thick superior quality mica approved make and 0.8mm thick approved shade mica in the inner side. Covering with teak wood beading 25x12mm all the sides of shutter & 35x12mm on outer frame for making good the wall joint including heavy brass S.S. fittings (Handle 200mm 2 Nos., Tower Bolt 150mm 2 Nos., Brass Lock 1 Nos., Magnetic Catcher 2 Nos., Brass Hinges 75x40x2.5 mm 6 Nos., SS Hanger Rod 20mm dia) complete as per drawing and design approved by Engineer in Charge | 1.4 | Sqm | 6,128 | ₹8,579.2 |
| 10 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 15 | Mtr. | 122 | ₹1,830 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_1072729.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .