Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.4 LAdmitted-Fee/PreQual/Technical/Finance | -3.00% | ₹16.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.0 L+₹50,858.37 (3.09%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹17.0 L+₹50,858.37 (3.09%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
17 Sept 2026, 5:00 pmClosed
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
Improvement of Fish Market alongwith Plantation, Cleaning, Spreading of Paver Block and Fixing at Signage Board
2026_ORULB_139576_7
ODULB_KGM_04/2026-2027
Open Tender
Civil Works - Others
Percentage
90 days
KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹20,000
Yes
19 Sept 2026
25 Aug 2026
18 Sept 2026
25 Aug 2026
17 Sept 2026
25 Aug 2026
25 Aug 2026 - 4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 10.26 | cum | 276.89 | ₹2,840.89 |
| 2 | Earth work in slushy soil ( in water upto 0.6m depth requiring the said of pans and vessels ) within 50 m initial lead & 1.50 m initial lift as per direction and specification of the deparment. including cost of all labour & Cess etc. all | 36 | cum | 236.11 | ₹8,499.96 |
| 3 | Filling in with good fertile earth meant for gardening purpose including excavation, loading, unloading and breaking the clod to maximum 5 to 7 cm in size and laying in layers of about 30 cm deep within 50 m initial lead & 1.50 m initial lift leveling & dressing the bed by engaging any mechanical means within 10.00 km lead as per direction of Er.in charge including cost of all labour , T & P , Transporting charges etc. all complete (Quotation call Notice No- 5894/KGM Date - 12.08.2025) | 23.09 | cum | 687.16 | ₹15,866.52 |
| 4 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 111.87 | cum | 867.39 | ₹97,034.92 |
| 5 | C.C. ( 1 : 4 : 8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 7.5 | cum | 5,583.53 | ₹41,876.48 |
| 6 | P.C.C. work in C.C. M-20 Grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete | 30.46 | cum | 5,954.69 | ₹1,81,379.86 |
| 7 | Rigid & smooth Centering & shuttering for PCC works including false work and dismentalling them after casting including cost & charges of all materials & cost of all labour complete . | 204 | SQM | 254.49 | ₹51,915.96 |
| 8 | Providing & Laying 80mm thick Factory made Chamfered edge Cement Concrete Paver Bliocks of M-40 grade & required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete including cost of all materials, labour cess, etc.T & P required for the work complete in all respect as per direction of Engineer-in-charge. | 1,330 | SQM | 614.48 | ₹8,17,258.4 |
| 9 | Labour charges for shifting of RCC drain cover slab & re- installing the same to orginal position carefully after cleaning the inside of drain as per direction of EIC | 200 | mtr | 75.42 | ₹15,084 |
| 10 | R.C.C. work in C.C. M-20 Grade of concrete using 20 mm & down graded size hg chips including hoisting & laying with cost, conveyance to site , royalty,cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour with rigid & smooth Centering & shuttering and dismentalling them after casting & removing the debris clear from work site complete including the cost & conveyance & labour charge for cutting , bending, binding , tying the grills & placing in position providing 0.80 Qntl / cum of Concrete of M.S./ T.S. rod complete | 4 | cum | 13,830.5 | ₹55,322 |
stage.html
html • 0.02 MB
finance_607223.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
DTCN.pdf
Tender Documents • 0.82 MB
BOQ_607223.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .