Loading…
Loading…
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
14 Sept 2026, 6:00 pm
Executive Engineer, Damanganga Canal Inv. Dn, Valsad
CONSTRUCTION OF TEMPORARY ANTI-SEA EROSION WALL AT UMARSADI NEAR WALKWAY BRIDGE, VILLAGE: UMARSADI, TALUKA-PARDI & DISTRICT: VALSAD
335112
05 of 2026-27
Open
Civil - All
Works
Valsad
9 documents required · 8 mandatory · 1 optional
₹6,000
Executive Engineer, Damanganga Canal Inv. Dn,Valsad
₹3.1 L
14 Aug 2026
14 Aug 2026
14 Aug 2026
14 Sept 2026
14 Aug 2026
BILL OF QUANTITIES
NAME OF WORK: - CONSTRUCTION OF TEMPORARY ANTI-SEA EROSION WALL AT
UMARSADI NEAR WALKWAY BRIDGE, VILLAGE: UMARSADI, TALUKA & DISTRICT:
Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) figures
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soils, soft &
hard murrum etc.dry condition including
1 disposing of the excavated stuff in uniform 8631.00 CM 86.10
layers in banks or as directed etc.complete for
lead upto1.0 Km. and all lifts. (By.Machinery)
(b) Below Water table.
Providing and laying geo fabric filter (GWF-50-
300 catogary) over the excavated surface as per
2 specification including stiching with overlap to 5520.00 SM 108.80
design profile as directed in tidal range etc.
Supplying and laying bedding layer of 20 cm
thick with single layer of jute/nylon bags filled
with stone grit (up to 5mm size) including all
leads & lifts as ditrected in tidal range etc.
(B)-do-layer of 15 cm thick
Supplying & Laying trap rubble stone 20 to
Kg. in weight for toe and core filling including
coveying and stacking to required line level
Slopes section including all leads and lifts.
Conveying material from stacks and laying etc.
Supplying & Laying trap rubble stone of 50 to
200 Kg. weight for toe & core fillng including
conveying and stacking to required line, level,
slope section including all leads & lifts
conveying materials from stacks and laying etc.
Supplying & Laying trap Rubble Stone 500 to
1000 KG in weight for toe & core filling
including conveying and stacking to required
line, level, slope section including all leads
& lifts conveying materials from stacks and
laying etc. completely.
Supplying & Laying trap rubble stone 1.0 to
1.50 tonne in weight for toe and core filling
including coveying and stacking to required
line, level, slope section including all leads &
lifts conveying materials from stacks and laying
etc. completely.
Providing vidiography on the ocassion of
function or for on going construction work
8 including dubbing, titeling etc. complete 1.00 4 Hour 1230.51
including cost of cassette/CD.
(b) Upto 4.00 Hours
Rupees Three Crore Fourteen Lakh Nine Thousand Four Hundred Seventy One and Paise Twenty Six
I/We am/are willing to carry out the work at _____________ % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimate Amount Estimate Amount
put to tender Rs. 31409471.26 put to tender Rs.
Deduct___________ % below Add___________ % Above
Net( If any) ______% ( in Figure)___________ Net
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
Deputy Executive Engineer Executive Engineer
Damanganga Canal Sub Dn No.13 Damanganga Canal Investigation Dn
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Umarsadi wakeway Bridge.pdf
tender SBD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].