| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.6 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹95.0 L+₹4.3 L (4.80%)Rejected-AOC | L2 | Rejected-AOC L2 bidder |
Tender Value
₹95.5 L
EMD Value
₹50,000
Closing Date
27 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addiitonalm Director of SoilCOnservation
Officeofthe Directorof SoilSurveyandSOilConservation Trivandrum14
DLTworksin Vellamundaand Edavakapanchayatsof Wayanad district
2022_DSSC_494957_1
PG(1)7792/2022/RKI-3
Open Tender
Civil Works - Others
Item Rate
365 days
VellamundaEdavaka panchayat
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,755
₹50,000
5 Sept 2022
20 Jun 2022
29 Jun 2022
20 Jun 2022
27 Jun 2022
20 Jun 2022
60 days
Amount
RECREATION OF FIRST ORDER DRAIN WITH SUPPORT OF ARECANUT THAITHAL PROTECTION TO COLLECT AND DIVERT THE EXCESS RUN OFF (0.60 M DEPTH)
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressws.All kinds of soil
od3013/2020_2021- RECREATION OF 1st & Ist ORDER DRAIN 0.60 M Depth
REJUVENATION OF EXISTING THODU (2nd & 3rd ORDER) WITH SUPPORT OF ARECANUT THAITHAL & VEGITATIVE PLANTS FOR THE SAFE DISPOSAL OF STORM WATER TO CONTROLL FLOOD P (0.80 M DEPTH)
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressws.All kinds of soil
od3013/2020_2021 - RECREATION OF 1st & 2nd ORDER DRAIN 0.80 M Depth
REJUVENATION OF EXISTING THODU (3rd ORDER) WITH SUPPORT OF ARECANUT THAITHAL & VEGITATIVE PLANTS FOR THE SAFE DISPOSAL OF STORM WATER TO CONTROLL FLOOD P (1.00 M DEPTH)
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressws.All kinds of soil
od3013/2020_2021 - Recreation of third order drain 1.00 m depth
PLANTING BAMBOO / WILD REED SEEDINGS ALONG THE STREAM BANK AND SLIPPED AREA
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressws.All kinds of soil
od 3015/2020-2021 - Planting bamboo / wild reed seedings along the stream bank and slopped area
CONSTRUCTION OF Pond - 15 x 15 x 3 m size
2.6.1-Earth Work in excavation by mechanical mens (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressws.All kinds of soil
od1516/2020-2021 Earthwork excavation first depth
60.7.1 Dry Rubble Masonry - Dry rubble blasted rubble including packing to compactness to lines and levels cost and conveyancee of all materialslabour charges etc . Complete as per direction of Departmental officers at site
5.3 - Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement :.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.2-Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
13.1.1 -12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
8.2.2.2 Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm
16.21 Engraving letters in Hard Stone
od3018/2020_2021 Earth Work Excavation - Second Lift
7.1.1 - RR Masonry Parapet - Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
CONSTRUCTION OF SIDE PROTECTION WALL FOR THE PADDY FIELD FROM THE OVERFLOW OF RAIN WATER RUNOFF - 75 M
2.6.1-Earth Work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:3:6 (1cement:3 coarse sand :6graded stone aggregate 40 nominal size)
4.3.1-Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
4.3.2-Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
13.1.1 - 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
CONSTRUCTION OF RCC FARM POND 4 M DIA - 18 Nos
2.6.1-Earth Work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressed.All kinds of soil
5.1.2- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stoneSaoggirlegSatue r2v0 emym n&omiSnaol siilzeC
5.9.12 - Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od3031/2021_2022 - Sinking well 4.00M<br>Sinking well in all soils other than rock to lines and levels and plumb by scoping out from inside and below the steining including use of dredgers or any other appliance hire and labour for kentledge, jetting, dewatering, blasting, vibration, or any other method including removal of obstacles and dumping the spoil with in a distance of 150m well 4.00m to 5.50m dia 1st depth upto 3.00m below spring level
13.1.1 - 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.61.1 - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.71 - LETTERING FOR SIGN BOARD
60.2.2 - Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
DR Retaining Wall 2.50m height at Paramoola Paniya Colony - 25 m
2.6.1-Earth Work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 - P.C.C 1:4:8 Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.1 - DR Masonry - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.2 - Providing and laying in position specified grade of reinforced cement concrete, excluding the cost ofcentering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.6 - PCC 1:3:6 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.22.6- Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.2- Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
7.1.1 - RR Masonry Parapet - Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.1.1 12mm cement plaster of mix 1:4 (1 cement: 4 fine sand)
EXTENSION OF CANAL AT UPPAN NADA _85m
2.6.1-Earth Work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10sqm plan)including disposal of excavated earth,lead up to 50m and lift up to 1.5 m,disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2 - Dry Rubble Packing -DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.6 - PCC 1:3:6 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.1- Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
4.3.2- Centering and shuttering including strutting,propping etc.and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc.
13.1.1 - 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_710257.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .