| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC KOLLAM KOLLAM KERALA 673585 | KOZHIKODE | KERALA | 673585 | ₹5.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.0 LRejected-Finance CHERAT KARUVISSERY P O PIN 673 010 | KARUVISSERY | KOZHIKODE | KERALA | 673010 | ₹6.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RITHU M.V L1 | ABDUL BASHEER C L2 |
|---|---|---|---|---|---|
| 1.00nangandoor karatt thazham road | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 570.9 | sqm | 12.97 ₹7,404.57 | 20 ₹11,418 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 75.73 | cum | 3,045 ₹2.3 L | 3,000 ₹2.3 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 504.9 | sqm | 70.6 ₹35,645.94 | 85 ₹42,916.50 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 6.6 | cum | 2,716 ₹17,925.60 | 2,700 ₹17,820 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 504.9 | sqm | 16.55 ₹8,356.10 | 25 ₹12,622.50 |
| 1.01 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 148.5 | sqm | 16.55 ₹2,457.68 | 25 ₹3,712.50 |
| 1.01 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 16.72 | sqm | 270 ₹4,514.40 | 400 ₹6,688 |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 6.97 | sqm | 348 ₹2,425.56 | 500 ₹3,485 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 719.4 | sqm | 255.5 ₹1.8 L | 275 ₹2.0 L |
Tender Value
₹6.5 L
EMD Value
₹16,145
Closing Date
6 Oct 2025, 6:00 pmClosed
ASSISTANT ENGINEER
O/o ASSISTANT ENGINEER LID AND EW KAKKODI KAKKODI GP 673611
Annual Plan-206/2025-26-RENOVATION OF N A N G A N D O O R K A R A T T H A Z H A M ROAD-General Civil Work-at kakkodi panchayath
2025_LSGD_802535_12
47/LSGD/AE/2025-26
Open Tender
Civil Works - Roads
KAKKODI
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,425
Yes
₹16,145
Yes
10 Apr 2026
26 Sept 2025
8 Oct 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1334314.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
PRELIMINARYAGREE.pdf
Tender Documents • 0.26 MB
SBDNAGADIOOOR.pdf
Tender Documents • 1.94 MB
FORMOFTENDER.pdf
Tender Documents • 0.25 MB
EPAY.pdf
Other Document • 0.23 MB
AFFIDAVIT.pdf
Additional Documents • 0.24 MB
FOIP.pdf
Other Document • 0.23 MB
BOQ_1334314.xls
BOQ • 0.31 MB
NITNANDOOR.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid