Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
SAND BLASTING OF THE FANS AND MISCELLANEOUS EQUIPMENTS IN NP PLANT, FACT CD
2025_FACT_865908_1
04096/2025-2026/E31704
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
17 Jul 2025
24 Jun 2025
17 Jul 2025
24 Jun 2025
16 Jul 2025
24 Jun 2025
Sand Blasting of the Fans & Miscellaneous Equipments in NP Plant, FACT CD..
Sand blasting of De-Humidifier (DH) Fan/ Fume Fans of A & B Stream of NP Plant. The work involves the arrangement and transportation of all required materials and equipment to the site, including sand, blasting equipment, hoses, and related items. All necessary tools and equipment, including an air compressor required for sandblasting, shall be provided by the contractor. Upon receiving clearance from the Maintenance and Process Departments, the fan's casing cover and drain pipe will be dismantled and placed aside. The fan's plummer blocks shall be properly covered to prevent sand ingress during sandblasting. The shift engineer shall then be informed to inspect the deposits on the fans. Sandblasting shall be carried out thoroughly on the fan rotor and suction hood to ensure complete removal of deposits. After sandblasting, the shift engineer will again be notified to verify the cleanliness and confirm that no deposits remain. All used sand and removed deposits must be cleaned from the interior of the fan casing. Upon completion of cleaning, the fan casing cover and drain pipe shall be carefully reinstalled and secured to prevent leakage. The contractor must adhere to the latest applicable standards and best practices for sandblasting and implement all necessary safety measures throughout the process.
Sand blasting of Dryer Fan / Cooler Fan of A & B Stream of NP Plant. The work involves the arrangement and transportation of all required materials and equipment to the site, including sand, blasting equipment, hoses, and related items. All necessary tools and equipment, including an air compressor required for sandblasting, shall be provided by the contractor. Upon receiving clearance from the Maintenance and Process Departments, the fan's casing cover and drain pipe will be dismantled and placed aside. The fan's plummer blocks shall be properly covered to prevent sand ingress during sandblasting. The shift engineer shall then be informed to inspect the deposits on the fans. Sandblasting shall be carried out thoroughly on the fan rotor and suction hood to ensure complete removal of deposits. After sandblasting, the shift engineer will again be notified to verify the cleanliness and confirm that no deposits remain. All used sand and removed deposits must be cleaned from the interior of the fan casing. Upon completion of cleaning, the fan casing cover and drain pipe shall be carefully reinstalled and secured to prevent leakage. The contractor must adhere to the latest applicable standards and best practices for sandblasting and implement all necessary safety measures throughout the process.
Sand blasting of Miscellaneous Equipments at NP Plant. The work involves the arrangement and transportation of all required materials and equipment to the site, including sand, blasting equipment, hoses, and related items. All necessary tools and equipment, including an air compressor required for sandblasting, shall be provided by the contractor.Sand or shot blasting shall be carried out in accordance with the latest applicable standards on ducts, vessels, tanks, and equipment such as fans, which are not covered under Activity 1 and Activity 2. The contractor shall be responsible for any dismantling required to facilitate smooth execution of the work. After completion, proper reassembly and closure shall be ensured to prevent any leakage. All used sand and removed deposits must be cleaned from the site. The contractor must adhere to the latest applicable standards and best practices for sandblasting and implement all necessary safety measures throughout the process.
stage.html
html • 0.02 MB
finance_910303.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .