Tender Value
₹8.2 L
EMD Value
₹10,202
Closing Date
22 Jan 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer ,W.J. Area
Transportation of one pony belt drivehead from E 8 BG and installation of Pony belt drivehead(P4) at 380m chainage from 10th DR jn. In D-19 BG, of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
2026_BCCL_351087_1
BCCL/WJA/MND/SUR/2025-26/74
Open Tender
Miscellaneous Works
Percentage
30 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹10,202
21 Feb 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
Transportation of one pony belt drivehead from E-8 B/G and installation of Pony belt drivehead(P4) at 380m chainage from 10th D/R jn. In D-19 B/G, of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
Manual Transportation of gearbox of pony drivehead from E-8 B/G to zero level,4th D/R jn &loading on arm trolley. i.e.Total distance=50m Analysis: Manshift required for manual transportation of gearbox/60m =10 unskilled manshift/shift Cost/mt= 10*1367.60/60 =Rs.227.9/mt
Manual Transportation of jib drum of pony drivehead from E-8 B/G to zero level,4th D/R jn &loading on arm trolley. i.e.Total distance=50m Analysis: Manshift required for manual transportation of jib drum/60m =10 unskilled manshift/shift Cost/mt= 10*1367.60/60 =Rs.227.9/mt
Manual Transportation of Motor from E-8 B/G to zero level,4th D/R jn &loading on arm trolley. i.e.Total distance=50m Analysis: Manshift required for manual transportation of Motor/60m =10 unskilled manshift/shift Cost/mt= 10*1367.60/60 =Rs.227.9/mt
Manual Transportation of starter of pony drivehead from E-8 B/G to zero level,4th D/R jn &loading on arm trolley. i.e.Total distance=50m Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Manual Transportation of Drive frames of pony drivehead from E-8 B/G to zero level,4th D/R jn &loading on arm trolley. i.e.Total distance=50m Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Transportation of Drive frames, gear box,Jib drum,Motor,Starter of pony drivehead from 7th D/R,400mh main line. to D-18 T/G,9th D/R Jn. via Track &Haulages. Analysis: No. of Arm trolleys required = 5 Manshift required/Arm trolley = 8 unskilled (including loading & unloading) for 2 shifts. Cost/Arm trolley = (8*1367.6)*2 =Rs.21881.6/Trolley
Manual Transportation of jib drum,gear box,motor of pony drivehead from D-18 T/G,9th D/R jn. to 380m inside D-19 B/G face i.e.Total distance=530m Analysis: Manshift required for manual transportation of one item/60m =10 unskilled manshift/shift Cost/mt/item= 10*1367.60/60 =Rs.227.9/mt/item Total items=3 no.;Therefore cost/mt=(Rs 227.9 *3)=Rs 683.7/mt
Manual Transportation of Drive frames of pony drivehead from D-18 T/G,9th D/R jn. to 380m inside D-19 B/G face i.e.Total distance=530m Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Manual Transportation of starter of pony drivehead from D-18 T/G,9th D/R jn. to 380m inside D-19 B/G face Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Manual Transportation of one tail end drum & frame from D-18 T/G,9th D/R jn. to 380m inside D-19 B/G face i.e.Total distance=530m Analysis: Manshift required for manual transportation of one item/100m =10 unskilled manshift/shift Cost/mt= 10*1367.60/100 =Rs.136.76/mt
Installation of Pony Drivehead at D-18 T/G 9th D/R jn. Analysis: Unskilled manshift required/shift=8 cost/shift=(8*1367.6)=Rs10940.8
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_363827.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .