Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
10 Sept 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORKS
16 conditions · 4 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB , along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All rates are inclusive of GST and bidders should be registered in GST.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed (Which should have been issued not prior to 60 days of date of invitation of present tender) any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate
Similar Nature of work:- "Any Civil Engineering work."
13 conditions · 9 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / HUF etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.(Para 14.1 (see Page-17 of GCC, April-2022) & Tenderer shall submit the documents in support of their constitution of the firm as per Para 14 of GCC, April-2022 (See Page-17 to 19).
As per instructions please attach proforma of ANNEXURE V-A this certificate is to be given by attorney/authorized signatory/each member of partnership firm / Joint Venture (JV)/ Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.) Non submission of above certificate (s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent up on the tenderer to identify, state and submit the supporting documents duly self-attested / digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document. Proforma is available in uploaded documents.
Certificate of Information regarding Employment/Partnership etc. of Retired Railway Employees with the tender as per the attached Performa. As per clause No 16 (a) and (b) of GCC Part-I April 2022 corrected up to date. (As per Para 16 of GCC, April2022 (See Page-19 to 20).
Restrictions on the Employment of Retired Engineers of Railway Services Within One Year of their Retirement: As per Para 59.9, of GCC, April-2022 (see Page-91).
Certificate of NO Relative being an employee of Western Railway as per attached Performa.
The tenderer should upload the scan copy of EPFO and ESI registration number. However EPFO and ESI registration would be mandatory and documents towards EPFO and ESI registration must be submitted before execution of the agreement .
In case of Bid Security in the form of Bank Guarantee, the same should be in favor of Sr. DFM Vadodara with the tender for due performance with the stipulation to keep the offer open till such date as specified in the tender, under condition of tender. GCC April 2022 Part I Instructions to tenderers (ITT) para 5 Bid Security (1) (a,b,c),(2) (3)(i-viii). As per ACS 2 issued vide Rly. board letter No.2022/CEI/ CT/GCC-2022/Policy date 13.12.2022: (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document within 5 working days before closing date for submission of bids. As pr ACS 5 RB No. 2022/CE-I/CT/GCC-2022/Policy date 20.10.2023:- Para 5(3) II The original bank guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bid.(i.e. excluding the last date of submission of bids).
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. As par Para 15 of GCC, April-2022 (see Page-19) .
Maintenance period for the work is "Six Months" from the certified date of the completion.
Being a tender having advertised value more than Rs 10 crore wherein eligibility criteria includes bid capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender as per Annexure-VI, Part-I of GCC April-2022 correction Slip No.1 & 12 (Copy attached).
Vadodara Division:- Construction of Track Machine Sidings at CVJ, TKWL, GTE and other Stations as per Requirement, Construction of TMC Rest Houses at VDA, CTD and EKNR, and Improvement of Allied Facilities at Existing Track Machine Sidings over Vadodara Division (Re-invited) (R-1).
DRM-BRC-073-OF-2026-27~WR
DRM-BRC-073-OF-2026-27
Open
Works - General
12 Months
Vadodara, Gujarat
₹0
₹25.8 L
18 Aug 2026
18 Aug 2026
27 Aug 2026
288 items across 4 schedules · ₹17,05,32,741.27 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 1 | Using Soil Class SQ2 | cum | 15151.00 | 529.05 | 80,15,636.55 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | — | — | — | — | |
| 2 | In all conditions and classifications of soil except rock | cum | 71775.00 | 112.71 | 80,89,760.25 |
| 3 | Providing weep holes by making suitable opening or drilling in existing Brick Masonry / Plain / Reinforced Concrete abutment, wing wall/return wall with 110 mm dia UPVC pipe (working pressure 4kg/sqcm) extending through the full width of the structure complete and repairing the same with cement mortar 1:2 (1 cement : 2 coarse sand). Rate is excluding the cost of cement which shall be paid extra. | Metre | 1080.00 | 516.59 | 5,57,917.2 |
| Pulling & positioning of rails accurately on cess including supporting rails, providing required gap and squaring at ends for renewal preparation, as directed by Engineer in-charge. | — | — | — | — | |
| 4 | Up to 40 m long rail panel | RM | 2268.00 | 9.8 | 22,226.4 |
| 5 | More than 40 m long rail panel | RM | 1062.00 | 15.5 | 16,461 |
| Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. | — | — | — | — | |
| 6 | For Casual/Scattered Rail Renewal work | RM | 2268.00 | 38 | 86,184 |
| Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately. | — | — | — | — | |
| 7 | For Casual/Scattered Rail Renewal work | RM | 2268.00 | 40.24 | 91,264.32 |
| Replacement of any type of sleepers in track with PSC sleepers lying on cess or at Bridge Approaches for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor's tools including packing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over at specified location within an average lead of 250 m or near either side of Bridge approaches as directed. | — | — | — | — | |
| 8 | Locations other than Ballasted Deck Bridge | Each | 1883.00 | 507.15 | 9,54,963.45 |
| Fixing of fish plates with fish bolts on a joint of all rail sections duly lubricating fish plates/bolts with contractor's grease graphite in running track condition including transportation of fish plates and fish bolts from nearest station / store / level crossing. Note: Rail cutting & drilling to be paid separately. | — | — | — | — | |
| 9 | Fish plates of 6 bolts. | Joint | 17.00 | 319.18 | 5,426.06 |
| 10 | Opening and refixing of Joggled fish plates provided to weld joints/rail of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge. Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned SSE/PW Stores. 2.Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt. | Set | 18.00 | 56.16 | 1,010.88 |
| 11 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 6354.00 | 5.91 | 37,552.14 |
| Lubrication of Plate/Rail screws of Points and crossings, SEJs, Bridges, Curves etc., with greases graphite, including removal of screws carefully without damaging sleepers, cleaning with wire brush etc., both screws and dowel hole, applying grease graphite, refixing the screw and sealing the top and sides of screw with grease graphite to prevent ingress of moisture and corrosion with contractors labour, tools, consumables under traffic condition all lead and lift complete. | — | — | — | — | |
| 12 | By using Contractor's Grease Graphite | Each | 45.00 | 40.38 | 1,817.1 |
| Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : | — | — | — | — | |
| 13 | Rail section of 52Kg and above | Each | 218.00 | 108.38 | 23,626.84 |
| 14 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block c o n d i t i o n s as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 3.00 | 9,223.09 | 27,669.27 |
| Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. | — | — | — | — | |
| 15 | 1 in 8½ Turnout (Under Traffic Block) | Set | 6.00 | 36,162.9 | 2,16,977.4 |
| Assembling complete BG Turnout on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches, crossings with a maximum lead of 500m, all lift & crossing of track as required and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete including lubrication of all fastenings, complete in all respect. Note: 1.Rail cutting and Drilling shall be paid separately 2. Required P.Way fittings/fastenings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 16 | 1 in 12 Turnout | Set | 6.00 | 49,571.49 | 2,97,428.94 |
| Assembling all types of Switches on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches with a maximum lead of 500m, all lift & crossing of track as required including cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including lubrication of fittings/fastenings, complete in all respect. Note: Required P.Way fittings shall be supplied at SSE/P.Way stores. | — | — | — | — | |
| 17 | Derailing Switch | Set | 3.00 | 9,167.35 | 27,502.05 |
| Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect a n d as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 18 | 1 in 12 Turnouts | Set | 6.00 | 76,893.24 | 4,61,359.44 |
| 19 | Derailing Switch | Set | 3.00 | 16,126.03 | 48,378.09 |
| Casual renewal of PSC sleepers on points and crossings, derailing switches and diamonds portion of any layout including packing under new sleepers. All the released materials shall be stacked at specified location in a countable manner within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed with contractor's vehicles, consumables, stores, labour etc. complete, as directed by Engineer in- charge. Note: Approach and Exit sleepers shall be paid as normal sleepers under relevant item. | — | — | — | — | |
| 20 | Sleepers up to 2.85 m length | Each | 84.00 | 651.53 | 54,728.52 |
| 21 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 126.00 | 898.16 | 1,13,168.16 |
| 22 | Sleepers of more than 4.20 m length | Each | 66.00 | 1,416.3 | 93,475.8 |
| Re-spacing of PSC sleepers of existing turnout after pre-marking of sleeper locations as per standard layout drawings, removing ballast and all other fittings/fastenings to clear obstruction for shifting as required, shifting of sleeper at correct location, fixing of all fittings/fastenings, ballasting, requisite packing, boxing and profiling, complete as directed by Engineer-in-charge. Note: Prior inspection and recording defective spacing and approval of Engineer-in-Charge shall be mandatory for operating this item. | — | — | — | — | |
| 23 | Turnout sleepers of length up to 2.85 m | Each | 168.00 | 147.2 | 24,729.6 |
| 24 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 252.00 | 176.64 | 44,513.28 |
| 25 | Sleepers of length more than 4.20 m | Each | 132.00 | 191.36 | 25,259.52 |
| Manual deep screening of Plain track/ turnouts as per procedure prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts. | — | — | — | — | |
| 26 | Depth of 250 mm below bottom of sleeper - For Plain Track : | TRM | 567.00 | 552.85 | 3,13,465.95 |
| 27 | Extra to item nos. from 081011 to 081018 and from 081021 to 081028 for disposal of muck at a distance beyond 50m for every additional lead of 50 metres or part thereof up to 500 metres for 1 TRM in station yard / cutting. | Each | 7508.00 | 5.94 | 44,597.52 |
| Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by Engineer-in-charge. Note: Payment shall be made based on ballast stack measurement. | — | — | — | — | |
| 28 | For average lead up to 50m and lift up to 5m | cum | 1689.00 | 151.5 | 2,55,883.5 |
| 29 | Extra over item no. 082011 for each additional average lead of 50m or part thereof when total average lead exceeds 50m, but up to 250m. Note: This item may be used only in exceptional circumstance under prior order on record. | Each | 337.00 | 28.24 | 9,516.88 |
| 30 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 1134.00 | 28.14 | 31,910.76 |
| Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre- defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. | — | — | — | — | |
| 31 | Under Traffic Block Conditions: | cum | 1689.00 | 56.2 | 94,921.8 |
| Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance betw e e n nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully. | — | — | — | — | |
| 32 | When distance of nearest quarry is more than 100 km and up to 150 km | cum | 3379.00 | 1,463.8 | 49,46,180.2 |
| 33 | Dismantling of existing LWR/SWR track of any structure, removing rails, sleepers, fish plates, cutting of rails, segregation and stacking of released Rails, Sleepers and fitting at nominated location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new t r a c k over it, all as per direction of Engineer-in-Charge. | TRM | 830.00 | 205.23 | 1,70,340.9 |
| 34 | Dismantling existing sand humps in yards from end of turnout to end of sand hump. Scope includes dismantling of track and brick / stone masonry on either sides of track, removing sand and earth to the required level including clearing site and stacking released materials within maximum lead of 250m, clear of infringement, complete and as directed. | Each | 3.00 | 14,319.95 | 42,959.85 |
| 35 | Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 1689.00 | 48.51 | 81,933.39 |
| Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. | — | — | — | — | |
| 36 | For sleeper density of 1660 sleepers per km | TRM | 1134.00 | 335.55 | 3,80,513.7 |
| 37 | For sleeper density of 1540 sleepers per km | TRM | 437.00 | 310.5 | 1,35,688.5 |
| Shifting / Slewing the existing or newly assembled track of any rail section with any type of sleepers and any density under line block to correct locations & alignment and attending to one round kutcha packing to run safely at 20KMPH speed with all contractors tools and consumables complete and as directed by Engineer in- charge. | — | — | — | — | |
| 38 | Maximum Shifting / Slewing up to 1 metre | TRM | 413.00 | 221.24 | 91,372.12 |
| 39 | Maximum Shifting / Slewing for more than 1 metre & up to 2 metres | TRM | 500.00 | 265.83 | 1,32,915 |
| 40 | Construction of Sanded Dead End as per RDSO's Drawing no. RT-347 (with all amendments) with brick-work using country bricks or CC bricks in mud mortar and filling with river coarse sand, surrounding rails and filling around. Note: Cost of brick and sand is not included in the rate. | Each | 3.00 | 11,719 | 35,157 |
| Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual | — | — | — | — | |
| 41 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 1134.00 | 111.67 | 1,26,633.78 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 42 | For PSC Sleeper Track with Sleeper Density of 1540 | TRM | 957.00 | 134 | 1,28,238 |
| Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer-in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it. | — | — | — | — | |
| 43 | 1 in 8½ PSC layout | Set | 6.00 | 12,240.79 | 73,444.74 |
| 44 | 1 in 8½ Derailing Switch | Set | 3.00 | 1,738.65 | 5,215.95 |
| 45 | Packing of isolated loose PSC sleepers on plain track below the bottom of the sleepers and surrounding through out its length duly opening two galas on either side of the renewed sleepers and packing the sleeper to bring the track to normal speed including gauging, aligning, squaring of sleepers and sectioning of ballast to the required profile with all contractor's labour, tools and plant etc. including all lead and lift and crossing of tracks where ever necessary complete and as directed by the Engineer-in-charge. | Sleeper | 188.00 | 86.43 | 16,248.84 |
| Pulling of welded rail panels to create a specified gap under traffic block, including opening of fittings & fastenings and re- fixing them on track after pulling of rail and creating standard gap for welding. | — | — | — | — | |
| 46 | For Rail panel more than 13m and up to 40m length | RM | 227.00 | 22.96 | 5,211.92 |
| 47 | For Rail panel more than 40m length | RM | 227.00 | 26.88 | 6,101.76 |
| De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any. | — | — | — | — | |
| 48 | Without Rail tensor | TRM | 1134.00 | 47.35 | 53,694.9 |
| 49 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 1701.00 | 15.94 | 27,113.94 |
| Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. | — | — | — | — | |
| 50 | For day time block working | TRM | 1134.00 | 20.3 | 23,020.2 |
| Carrying out pre-tamping, during tamping and post-tamping works for tamping of Turnouts of all types Under Traffic Block Conditions which include :(1) Re- adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator; (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of UNIMAT; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings including check rails immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting worked-out / fallen fittings; (9) Removing and re-fixing joggled fish plates & wooden blocks, OHE bonds & other obstructions, wherever necessary ; (10) Removing and re-fixing stretcher bar, as directed; (11) Adjustment in opening and housing of switch for testing operation of points (12)Manual consolidation of ballast in cribs and shoulders; (13) Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping; (14) Recovery at the rate of twice the applicable rate will be effected in case contractor fails to carry out any of the pre/during/post operation. | — | — | — | — | |
| 51 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 6.00 | 11,639.19 | 69,835.14 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in- charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 52 | 60 Kg - 110/90 UTS - Outside Track | Each | 176.00 | 242.54 | 42,687.04 |
| 53 | 60 Kg - 110/90 UTS - On Running Line | Each | 87.00 | 310.82 | 27,041.34 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 54 | Outside Track | Each | 272.00 | 61.48 | 16,722.56 |
| 55 | On Running Line | Each | 136.00 | 78.7 | 10,703.2 |
| 56 | Drilling holes of specified size for bond holes with 7.2mm dia drill twist to correct spacing and location on 60kg/52kg rails on cess or under traffic block with contractor's tools and plant, equipment, consumable, labour etc complete as directed by the Engineer in charge at site. | Each | 53.00 | 44.75 | 2,371.75 |
| 57 | Sleeper Spacing, Re-spacing / Squaring of sleeper by Hydraulic Sleeper Spacer with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Hydraulic Sleeper Spacer shall be as per RDSO's Specification No. TM/SM/17, dated 31.03.1992. | Each | 150.00 | 75.84 | 11,376 |
| 58 | Extraction of jammed ERC by Heavy Duty Hydraulic Extractor with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Heavy Duty Hydraulic Extractor for jammed ERCs (10 Ton capacity) shall be used as per RDSO's Specification No. TM/SM/6, dated 8.05.1991. | Each | 358.00 | 36.81 | 13,177.98 |
| Loading of rails of any section and length up to 13 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. | — | — | — | — | |
| 59 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 136.00 | 216.82 | 29,487.52 |
| Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre. | — | — | — | — | |
| 60 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 24.00 | 206.4 | 4,953.6 |
| Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. | — | — | — | — | |
| 61 | For lead up to 500 metre. | MT | 92.00 | 410.32 | 37,749.44 |
| 62 | For lead beyond 500 metre and up to 1 Km. | MT | 54.00 | 529.6 | 28,598.4 |
| 63 | Extra to Items no. 171032 for lead beyond 1 Km for every subsequent Km or part thereof and up to 10 Km | MT | 122.00 | 63.38 | 7,732.36 |
| Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. | — | — | — | — | |
| 64 | From wagons during period of traffic block where handling by mechanical means is not possible | MT | 115.00 | 189.12 | 21,748.8 |
| 65 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 126.00 | 156.8 | 19,756.8 |
| Unloading of rails of any section and length from 13 metre to 39 metre, in neat manner for Railway usage from departmental material train (DMT) including lead up to 50 metre and lift up to 5 metre. | — | — | — | — | |
| 66 | During period of traffic block | MT | 91.00 | 197.7 | 17,990.7 |
| Unloading of all type of rails of length 130 metre and beyond from end unloading rake and keep the panels in head-up position at specified distance from centre of track clear from any infringement.. Note: Contractor has to keep Oxygen and Acetylene gas with cutter as standby during the period of work. | — | — | — | — | |
| 67 | During period of traffic block | MT | 136.00 | 31.32 | 4,259.52 |
| Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 68 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 653.00 | 178.3 | 1,16,429.9 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 69 | For lead up to 500 metres | MT | 543.00 | 319.49 | 1,73,483.07 |
| 70 | For lead beyond 500 metre and up to 1 Km | MT | 237.00 | 474.19 | 1,12,383.03 |
| 71 | Extra to Items no. 172032 for lead beyond 1 Km for every subsequent Km or part thereof and up to 10 Km | MT | 131.00 | 49.44 | 6,476.64 |
| Loading, leading and unloading of all types of P.Way fittings and all other m i s c e l l a n e o u s m a t e r i a l except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. | — | — | — | — | |
| 72 | Lead up to 5 Km | MT | 30.00 | 179.92 | 5,397.6 |
| 73 | Lead beyond 5 Km and up to 10 km | MT | 30.00 | 222.96 | 6,688.8 |
| 74 | Lead beyond 10 Km and up to 20 km | MT | 30.00 | 281.29 | 8,438.7 |
| 75 | Lead beyond 20 Km and up to 30 km | MT | 30.00 | 352.03 | 10,560.9 |
| 76 | Lead beyond 30 Km and up to 50 km | MT | 30.00 | 449.86 | 13,495.8 |
| 77 | Lead beyond 50 Km and up to 100 Km | MT | 30.00 | 662.06 | 19,861.8 |
| 78 | Lead beyond 100 Km and up to 150 Km | MT | 30.00 | 980.75 | 29,422.5 |
| 79 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 7606.00 | 3.26 | 24,795.56 |
| Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. | — | — | — | — | |
| 80 | Lead up to 5 Km | MT | 35.00 | 56.61 | 1,981.35 |
| 81 | Lead beyond 5 Km and up to 10 km | MT | 35.00 | 99.65 | 3,487.75 |
| 82 | Lead beyond 10 Km and up to 20 km | MT | 35.00 | 157.98 | 5,529.3 |
| 83 | Lead beyond 20 Km and up to 30 km | MT | 66.00 | 228.72 | 15,095.52 |
| 84 | Lead beyond 30 Km and up to 50 km | MT | 135.00 | 326.55 | 44,084.25 |
| 85 | Lead beyond 50 Km and up to 100 Km | MT | 325.00 | 538.74 | 1,75,090.5 |
| 86 | Lead beyond 100 Km and up to 150 Km | MT | 327.00 | 857.43 | 2,80,379.61 |
| 87 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 16260.00 | 3.26 | 53,007.6 |
| Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 88 | From DMT - During period of traffic block | MT | 653.00 | 178.18 | 1,16,351.54 |
| 89 | From Truck / Trailer | MT | 653.00 | 146.36 | 95,573.08 |
| Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. | — | — | — | — | |
| 90 | From Truck / Trailer | MT | 24.00 | 234.02 | 5,616.48 |
| Collection, segregation and stacking of various scattered P.Way materials at nominated stacking location with serviceable and un-serviceable ones separately within a lead up to 500 metre and lift up to 5 metre including crossing of track(s) wherever necessary as directed by Engineer-in-Charge. | — | — | — | — | |
| 91 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 80.00 | 478.8 | 38,304 |
| 92 | All type of PSC sleepers | MT | 65.00 | 516.47 | 33,570.55 |
| 93 | P.Way fittings of all types and other similar loose items | MT | 30.00 | 414.33 | 12,429.9 |
| Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed. | — | — | — | — | |
| 94 | For erection | Each | 36.00 | 272.4 | 9,806.4 |
| 95 | For removal | Each | 36.00 | 223.3 | 8,038.8 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 96 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 960.00 | 846.09 | 8,12,246.4 |
| 97 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 720.00 | 2,118.4 | 15,25,248 |
| 98 | Tractor with Trolley for local transportation or other misc. works. | Hour | 600.00 | 599.84 | 3,59,904 |
| 99 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 227.00 | 753.26 | 1,70,990.02 |
| Schedule total | ₹3,12,31,678.86 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-F.pdf
ATTACHMENT
JPOSTDepartment.pdf
ATTACHMENT
PCECircular88forQualityofWorks.pdf
ATTACHMENT
IRSGCCApril-2022.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
ImplementationofContractore-MB_1.pdf
ATTACHMENT
Dainikkaaryanishpaadananumatipatra.pdf
ATTACHMENT
Recommendedmakermanufacturerofcivilmaterials.pdf
ATTACHMENT
DraftlistofmanufacturersforCivilWorks.pdf
ATTACHMENT
1PCECircular86ForEarthworks.pdf
ATTACHMENT
2ComprehensiveGuidelineRDSO-2020-GE-IRS-0004-1-100.pdf
ATTACHMENT
2ComprehensiveGuidelineRDSO-2020-GE-IRS-0004-101-223C.pdf
ATTACHMENT
3SystemImprovement-Reiterationofinstructionsregardingmaterialinvoicessubmittedbycontractors.pdf
ATTACHMENT
BidCapacityFormat.pdf
ATTACHMENT
PreformJVMOU.pdf
ATTACHMENT
073SpecialCondition.pdf
ATTACHMENT
AdvancecorrectionslipNo01to08GCCApril2022.pdf
ATTACHMENT
AdvancecorrectionslipNo09to12GCCApril2022.pdf
ATTACHMENT
DRMBRC073of2026-27C.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].