Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC 366 27 SUBHASH NAGAR ROHTAK ROAD JIND | JIND | JIND | HARYANA | 126102 | L1 | Accepted-AOC L1 AGENCY | |
| 2 | L2₹10.5 Cr+₹24.6 L (2.41%)Rejected-Finance | L2 | Rejected-Finance L2 AGENCY REJCTED |
Tender Value
₹8.6 Cr
EMD Value
₹17.1 L
Closing Date
27 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E E PD1 SONEPAT
E E PD 1 SONEPAT
Improvement by Providing Strengthening of Jharot Narela Road (ID-6225) in Sonepat Distt.
2022_HRY_203209_1
PWD/3101
Open Tender
Civil Works
Works
275 days
SONEPAT CIRCLE
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹17.1 L
Yes
7 Feb 2022
8 Jan 2022
28 Jan 2022
8 Jan 2022
27 Jan 2022
8 Jan 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Milling of existing damaged bitumen surface by cold milling machine upto any depth and hauling the milled material up to any lead and stacking at nearest recycling plant site. (HSR 17.43.2)
Note: - The quantity of reclaimed material shall be considered minimum 80% of theoretical volume. The reclaimed material shall be used 30% of total quantity of DBM item No. 8 as per clause No. 519 of MoRT&H specifications. | 341.6 | Cum | 100 | ₹34,160 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead any, stacking serviceable and unserviceable materials separately, as per technical clause 202 of MORT&H specifications. (HSR 17.3) | 2,369.85 | Cum | 100 | ₹2,36,985 |
| 3 | Removal of existing CC Block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or as desired by Engineer. (HSR 17.67). | 945 | Cum | 100 | ₹94,500 |
| 4 | Excavation for road work in soil by mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal within ROWs as per technical clause 301 of MORT&H specifications. (HSR 17.74) | 684.25 | Cum | 10 | ₹6,842.5 |
| 5 | Compaction & preparation of sub grade including loosening, levelling of earth, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (Based on HSR 17.5.3) | 7,245 | Sqm | 10 | ₹72,450 |
| 6 | Providing & laying Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material
Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. (Based on HSR 17.15.1) | 2,373.35 | Cum | 10 | ₹23,733.5 |
| 7 | Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor @ 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR.17.26.2) | 1,47,182 | Sqm | 10 | ₹14,71,820 |
| 8 | Providing & laying 50 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary check and evaluation, adding fresh mateerial including rejuvenation as required, grade, level and thickness, all as specified in clause No.519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen content 4.50% i/c bitumen of retrieved material as per job mix formula) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate roller and with hydraulic paver finisher with sensor control to the required grade. The milled material to be used in DBM shall be minimum 80% of the theoretical quantity. (Based on HSR 17.43.1)
Note:- If bitumen required is more than 4.50% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work.
II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Note: - Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. | 910.93 | Cum | 10 | ₹9,109.3 |
| 9 | Providing and laying 50mm thick dense graded bituminous macadam (DBM) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications (HSR.17.30.2)
Note: - I If bitumen required is more than 4.50% as per job mix formula no extra payment will be made and extra bitumen required will be considered as incidental to work.
II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Note: - Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. | 2,768.62 | Cum | 10 | ₹27,686.2 |
| 10 | Providing and laying 30mm thick bituminous concrete (BC) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor controlto the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications
Note: - I If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
III - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. (HSR.17.31.2) | 2,207.73 | Cum | 10 | ₹22,077.3 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
NEW.DOC.pdf
Tender Document • 1.77 MB
Tendernotice_1.pdf
Tender Document • 0.28 MB
BOQ_267742.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .