| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC CHADAYAMANGALAM | ₹7.5 L Quoted ₹7.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.5 LRejected-AOC CHADAYAMANGALAM KERALA | KANNUR | KERALA | 670612 | ₹7.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHIHAD J S L2 | VASUDEVAKURUP B L1 |
|---|---|---|---|---|---|
| 1.00Construction of culvert and Side Protection works | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 54.18 | cum | 257.63 ₹13,958.39 | 257 ₹13,924.26 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 20 | hour | 455.83 ₹9,116.6 | 455 ₹9,100 |
| 1.00 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | 4 | Day | 1,082.18 ₹4,328.72 | 1,082 ₹4,328 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | 757.52 ₹757.52 | 757 ₹757 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.3 | cum | 3,671.89 ₹1,101.57 | 3,671 ₹1,101.3 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 65.37 | cum | 3,993.46 ₹2,61,052.48 | 3,993 ₹2,61,022.41 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 15.75 | cum | 8,343.49 ₹1,31,409.97 | 8,343 ₹1,31,402.25 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 9.6 | sqm | 386.16 ₹3,707.14 | 386 ₹3,705.6 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.44 | cum | 7,932.89 ₹35,222.03 | 7,932 ₹35,218.08 |
Tender Value
₹7.5 L
EMD Value
₹18,640
Closing Date
29 May 2026, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER MINOR IRRIGATION SUB
ASSISTANT EXECUTIVE ENGINEER MINOR IRRIGATION SUB DIVISION KOTTARAKKARA
GENERAL General Maintenance and Reconstruction of Tractor culvert and other allied works in Cherukunnam ela thodu in Chadayamangalam Grama PanchayathGeneral Civil Work
2026_Irrig_850908_1
IRR/IA/377/2026-2027
Open Tender
Civil Works - Others
240 days
Chadayamangalam Grama Panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,645
Yes
₹18,640
Yes
9 Jul 2026
14 May 2026
2 Jun 2026
14 May 2026
29 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of culvert and Side Protection works | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.003 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | - | Day | - | - |
| 1.004 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | - | cum | - | - |
| 1.005 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.006 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.007 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.008 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.009 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1437759.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1437759.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 4.09 MB
Download all tender documents and submit your bid