| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC in order | |
| 2 | L2₹4.4 L+₹31,760.32 (7.69%)Rejected-AOC | L2 | Rejected-AOC in order |
| Sl No | Description | Qty | Unit | K.CHANDRABABU L1 | SURESH KUMAR S L2 |
|---|---|---|---|---|---|
| 1.00PROTECTION FENCE AROUND POTHENCODE POND | |||||
| 1.00 | OD113536/2025-2026:Random rubble masonry in Cement mortar 1:6 (1 cement : 6 coarse sand) with hard
stone in foundation and plinth as per direction of engineer incharge at site. Modified 7.1.1 | 4.8 | cum | 6,700 ₹32,160 Lowest | 7,215.38 ₹34,633.82 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 4.12 | sqm | 760.34 ₹3,132.6 Lowest | 818.83 ₹3,373.58 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.2 | cum | 10,453.81 ₹12,544.57 Lowest | 11,257.95 ₹13,509.54 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 120 | kilogram | 112.05 ₹13,446 Lowest | 120.67 ₹14,480.4 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 14.4 | sqm | 384.87 ₹5,542.13 Lowest | 414.48 ₹5,968.51 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.08 | cum | 9,205.19 ₹9,941.61 Lowest | 9,913.28 ₹10,706.34 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 34.12 | sqm | 316.25 ₹10,790.45 Lowest | 340.58 ₹11,620.59 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,677.32 | kg | 177.83 ₹2,98,277.82 Lowest | 191.51 ₹3,21,223.55 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 96 | sqm | 164.31 ₹15,773.76 Lowest | 176.95 ₹16,987.2 |
Tender Value
₹4.2 L
EMD Value
₹10,586
Closing Date
8 Aug 2025, 6:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER O/O Assistant Engineer LID EW section Pothencode
Annual Plan-2025-26-construction of protective fence in pothencode pond-288/26- POTHENCODE GP
2025_LSGD_780048_2
02/TEND/AE/LIDEW/PCD/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
POTHENCODE
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,586
Yes
1 Sept 2025
31 Jul 2025
11 Aug 2025
31 Jul 2025
8 Aug 2025
31 Jul 2025
Amount
PROTECTION FENCE AROUND POTHENCODE POND
OD113536/2025-2026:Random rubble masonry in Cement mortar 1:6 (1 cement : 6 coarse sand) with hard stone in foundation and plinth as per direction of engineer incharge at site. Modified 7.1.1
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
OD114117/2025-2026:Providing and fixing Granite of any colour and shade for Name board 75x60cm, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering & fixing
SURESH KUMAR S (BID ID -2279743)
Bidder Name
SURESH KUMAR S
K.CHANDRABABU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1279878.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .