Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.8 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹27.9 L+₹531.19 (0.02%)Rejected-AOC | 2 | Rejected-AOC 2nd Lowest Bidder | |
| 3 | 3₹29.5 L+₹1.6 L (5.90%)Rejected-AOC | 3 | Rejected-AOC 3rd Lowest Bidder |
Tender Value
₹35.6 L
EMD Value
₹50,000
Closing Date
14 May 2020, 6:00 pmClosed
Executive Engineer
Executive Engineer, Irrigation Division, Alappuzha
CSIND-Desilting the Maliyampurackal canal in pulinkunnu Panchayth in Kuttanadu L.A.Constituency
2020_Irrig_354533_1
10/EE/IDA/2020-21
Open Tender
Civil Works - Others
Item Rate
150 days
Pulinkunnu Panchayath
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,800
Yes
online
₹50,000
Yes
26 Jun 2020
29 Apr 2020
19 May 2020
29 Apr 2020
14 May 2020
29 Apr 2020
Amount
Maliyampurackal canal
od64087/2019_2020/IA : Clearing and removing thick KARUKA and other underwater weeds and othersubmerged materials in or under water and other floating water weeds in the river in the river including all cost and conveyance and labour charges etc complete.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
sony scaria
K SHAJI
Bidder Name
P.K CONSTRUCTIONS
sony scaria
K SHAJI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_498462.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .