| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-Finance | ₹26.4 L | L1 | Accepted-Finance Qualified |
| 2 | L2₹27.3 LRejected-Finance | ₹27.3 L | L2 | Rejected-Finance Disqualified |
| 3 | L3₹29.2 LRejected-Finance | ₹29.2 L | L3 | Rejected-Finance Disqualified |
| Sl No | Description | Qty | Unit | V CHARLES L2 | JEGANNIVAAS L3 | MANOHARAN AND CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Renewal the Road Irungalur Checkpost to Rethinankudi River road KM 0/0-1/40 Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,176 | cum | 5.91 ₹6,950.16 | 6 ₹7,056 | 5.3 ₹6,232.80 |
| 2.00 | Providing and Laying Gravel to 150mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 168 | cum | 317.06 ₹53,266.08 | 340 ₹57,120 | 350 ₹58,800 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 567 | cum | 130.62 ₹74,061.54 | 140 ₹79,380 | 130 ₹73,710 |
| 4.00 | .Applying TACK COAT over WMM surface at 3.00 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,250 | sqm | 32.54 ₹1.7 L | 34 ₹1.8 L | 19 ₹99,750 |
| 5.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 157.5 | cum | 11,028.07 ₹17.4 L | 11,850 ₹18.7 L | 10,880 ₹17.1 L |
| 6.00 | Provision for Road Marking with hot appiled Thermoplastic compund in etc., Completed | 280 | sqm | 827.7 ₹2.3 L | 890 ₹2.5 L | 890 ₹2.5 L |
| 7.00 | Provision for HM Stone | 7 | no | 534.42 ₹3,740.94 | 574 ₹4,018 | 780 ₹5,460 |
| 8.00 | Provision for KM Stone | 1 | no | 2,043.21 ₹2,043.21 | 2,197 ₹2,197 | 2,700 ₹2,700 |
| 9.00 | Sign board | 2 | no | 4,649.07 ₹9,298.14 | 4,999 ₹9,998 | 5,000 ₹10,000 |
| 10.00 | Provision for name board arrangements | 1 | no | 19,530 ₹19,530 | 21,000 ₹21,000 | 15,000 ₹15,000 |
Tender Value
₹29.6 L
EMD Value
₹30,000
Closing Date
12 Feb 2026, 2:00 pmClosed
Bdo BP
Mannachanallur panchayat Union
Renewal the Road Irungalur Checkpost to Rethinankudi River road KM 0/0-1/40 in Manachanallur Block.Tiruchirappalli
2026_RDTN_652373_1
A2/3850/2025 02.02.2026
Open Tender
Civil Works - Roads
Mannachanallur Panchayat union
Renewal the Road Irungalur Checkpost to Rethinankudi River road KM 0/0-1/40 in Manachanallur Block.Tiruchirappalli
5 documents required · 5 mandatory
₹0
₹30,000
Yes
Mannachanallur panchayat Union
13 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
6 Feb 2026
Renewal the Road Irungalur Checkpost to Rethinankudi River road KM 0/0-1/40 Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Providing and Laying Gravel to 150mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
.Applying TACK COAT over WMM surface at 3.00 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with hot appiled Thermoplastic compund in etc., Completed
Provision for HM Stone
Provision for KM Stone
Sign board
Provision for name board arrangements
Provision for Photos Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
NIT.pdf
Tender Documents • 0.09 MB
BOQ_782240.xls
BOQ • 0.25 MB
Pricebid.pdf
Additional Documents • 0.70 MB
Techbid.pdf
Additional Documents • 0.92 MB
Download all tender documents and submit your bid