Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.1 LAccepted-AOC | ₹29.1 L | 1 | Accepted-AOC Quoted 7.1percentage below estimate Rate |
| 2 | 2₹30.1 L+₹97,220.94 (3.34%)Rejected-AOC | ₹30.1 L+₹97,220.94 (3.34%) | 2 | Rejected-AOC Quoted 4percentage below estimate rate |
Tender Value
₹31.4 L
EMD Value
₹50,000
Closing Date
19 May 2026, 11:00 amClosed
Executive Engineer
Project Management Unit, Kalpetta
Bulk Tender Dyuthi HT Works 1 New OH Line from Thazhe Arappetta to Thinapuram ES Meppadi2 CC from Vetenary Junction to Kollivayal ESKambalakkad 3Reconductoring 11kV OH line with CC AchoorEstate Jack ES Vythiri 4 SI work at Mepperikkunnu ESMeenangadi
2026_KSEB_849080_1
03/PMU/KPTA/2026-27/29-04-2026
Open Tender
Electrical Works
Percentage
120 days
Vythiri, Kambalakkad, Meppadi, Meenangadi
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
₹50,000
17 Jul 2026
29 Apr 2026
20 May 2026
30 Apr 2026
19 May 2026
2 May 2026
30 Apr 2026 - 19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DESCRIPTION OF WORK ITEMS | - | - | - | - |
| 2 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 134 | No | 3,274.36 | ₹4,38,764.24 |
| 3 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | 288 | No | 158.91 | ₹45,766.08 |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 178 | No | 762.14 | ₹1,35,660.92 |
| 5 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 14 | No | 1,008.86 | ₹14,124.04 |
| 6 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 41 | No | 1,923.64 | ₹78,869.24 |
| 7 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 23 | No | 879.23 | ₹20,222.29 |
| 8 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 89 | No | 1,778.32 | ₹1,58,270.48 |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 23 | No | 906.41 | ₹20,847.43 |
| 10 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 11 | No | 4,143.14 | ₹45,574.54 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1434818.xls
BOQ • 0.36 MB
BidDocumentJackKolliThina.pdf
Tender Documents • 2.92 MB
DateExtensionCorrigendumJackKolliThina.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .