| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC 13 312J ETMS BUILDING THALAPPARA P O MALAPPURAM DISTRICT | KANNUR | KERALA | 670612 | L1 | Accepted-AOC First lowest | |
| 2 | L2₹21.9 L+₹2.4 L (12.3%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹22.1 L+₹2.6 L (13.2%)Rejected-AOC | L3 | Rejected-AOC Third Lowest |
Tender Value
₹22.2 L
EMD Value
₹50,000
Closing Date
15 Oct 2022, 5:00 pmClosed
Regional Engineer, KESNIK, RNK Wayanad
Regional Engineer, Kerala State Nirmithi Kendra, Regional center, Wayanad
Earth Work PCC 40 mm broken stone Centering Shuttering PCC 20 mm broken stone RCC Constructing masonry Chamber
2022_KSNK_513294_1
KSNK/TECH/WYND/ADNLOT-26/2022
Open Tender
Civil Works - Others
Item Rate
30 days
Taluk Head Quarters Hospital, Police Station Road
Refer NIT
6 documents required · 6 mandatory
₹2,500
₹50,000
Yes
2 Dec 2022
6 Oct 2022
17 Oct 2022
6 Oct 2022
15 Oct 2022
6 Oct 2022
Amount
Civil Works
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.4 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od121718/2022_2023 : Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 160mm dia 6 Kgf/cm2 - External work- Exposed on wall
18.34.1 : Constructing masonry chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand: 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
B I ABOOBACKER SIDIQ
Abdulnazir K
Bidder Name
B I ABOOBACKER SIDIQ
Abdulnazir K
UTECHCONSTRUCTIONS LLP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .