| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.7 CrAccepted-AOC | ₹13.7 Cr Quoted ₹17.2 Cr | 1 | Accepted-AOC Po Placed |
| 2 | 2₹3.4 CrAccepted-AOC | ₹3.4 Cr Quoted ₹20.0 Cr | 2 | Accepted-AOC Po Placed |
| 3 | 3₹30.8 CrRejected-AOC 102 R RESIDENCY PLOT 39 SEC 19 BEHIND HOTEL MALWAN ULWE NODE NAVI MUMBAI | NAVI MUMBAI | MAHARASHTRA | ₹30.8 Cr | 3 | Rejected-AOC Po Not Placed |
| 4 | 4₹30.8 CrRejected-AOC | ₹30.8 Cr | 4 | Rejected-AOC Po Not Placed |
| 5 | Rejected-Technical | - | - | Rejected-Technical Tech. not suitable |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
21 Oct 2024, 5:00 pmClosed
DMM(SB)II
MM Dept, Kussara Store, Mazgaon, Mumbai
Biennial Rate Contract for LV/HV Cable Laying Activity in Trenches
2024_BEST_1085185_1
DMM(SB)/07/79231/2024-25/ADVT
Open Tender
Support/Maintenance Service
900 days
MM Dept, Kussara Store, Mazgaon
Please refer Tender documents.
8 documents required · 8 mandatory
₹12,000
₹5 L
Yes
19 Mar 2025
13 Sept 2024
23 Oct 2024
13 Sept 2024
21 Oct 2024
13 Sept 2024
PRICE SCHEDULE - PART- A
Cost of Excavation and making Trenches including breaking existing concrete RCC Road/Concrete Pavement with proper Barricading& Backfilling
Cost of Excavation and making Trenches including breaking existing Asphalt with proper Barricading & Backfilling
Cost of Excavation and making Trenches including breaking existing Paver Blocks or similar surface with proper Barricading & Backfilling
Rate for LV Cable Laying per Running Meter in Trenches which includes Laying of Pipes wherever required, Pulling of cable (through excavated Trenches or Pipes), Bedding (by sand or sieved earth), Tiling, Removal & Disposal of Debris
Rate for HV Cable Laying per Running Meter in Trenches which includes Laying of Pipes wherever required, Pulling of cable (through excavated Trenches or Pipes), Bedding (by sand or sieved earth), Tiling, Removal & Disposal of Debris
PRICE SCHEDULE - PART- B
Provision of DWC-HDPE Pipe in size 150mm. ID/200 mm. OD – 6mtr. length, ISI mark as per IS 16205, Part -24 at site.
Provision of HDPE Pipe of 150mm. dia IS Grade 4984, PN4, PE80, 4 mtrs. length at site.
Excavation & Trenching of Hard Rock upto 0.75 mtr. (width) × 1.2 mtr. (depth)
Dewatering Pump between 5HP/10HP Shift
CC Masonry work including all material cost
Brick work for chambers with precast cover including all material cost
Cleaning of duct.
Using Water Tanker of minimum 10KL capacityfor pipe cleaning
Use of JCB (with/without breaker) with Operator & Fuel
Diamond cutting upto 300 mm. thickness
Diamond cutting upto 600 mm. thickness.
Core cutting upto 200 mm. dia
Core cutting upto 300 mm. dia
To provide Air Compressor (for Demolition Hammer) with Operator & Fuel.
Installation Charges for Modified Mini Pillar alongwith pit excavation, 2 Nos. of foundation & 4 nos. of rag bolt (weight upto 190 Kg.)
Installation Charges for 6-way Auxiliary Distribution Pillar alongwith pit excavation, 2 Nos. of foundation & 4 nos. of rag bolt (weight upto 300 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Installation Charges for 8-way Auxiliary Distribution Pillar alongwith pit excavation,2 Nos.of foundation & 4 nos. of rag bolt (weight upto 400 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Installation Charges for 10-way Auxiliary Distribution Pillar alongwith pit excavation, 2 Nos. of foundation & 4 nos. of rag bolt (weight upto 450 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Installation Charges for 12-way Auxiliary Distribution Pillar alongwith pit excavation, 2 Nos. of foundation & 4 nos. of rag bolt (weight upto 600 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Installation Charges for 16-way Auxiliary Distribution Pillar alongwith pit excavation, 4 Nos. of foundation & 8 nos. of rag bolt (weight upto 800 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Installation Charges for 20-way Auxiliary Distribution Pillar alongwith pit excavation, 4 Nos. of foundation & 8 nos. of rag bolt (weight upto 1000 Kg.) Pillar will be placed on foundation by U/T's Transport Contractor.
Breaking of empty wooden cable drum and transporting the wooden flanks and useful material to nearby site/ chowkey/Dept./as per requirements. The weight of each wooden drum varies from 350 kg to 600 kg
Re-instatement in private premises for cement coba surface. This will be |including required material and labour.
Re-instatement in private premises for mastic / asphalt surface. This will be including required material and labour.
Re-instatement in private premises for paver block surface. This will be including required material and labour
Re-instatement in private premises for chequered / shahabadi / mosaic tiles surface. This will be including required material and labour.
Re-instatement in private premises for vitrified tiles surface. This will be including required material and labour.