Superintending Engineer, Project Implementation Unit, Zone-6, Vadodara
MODULAR OPERATION THEATRE AT SDH SANTRAMPUR, TA:-SANTRAMPUR DIST:-MAHISAGAR (REINVITE)
283977
2025-26/162/01
Open
Civil Works - Buildings
Panchmahal
1 document required · 1 mandatory
₹2,400
Yes
PIU-GENERAL FUND A/C 11-114-Gandhinagar
₹60,000
Yes
7 Mar 2026
7 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
S. No. Quantity Unit Rate in Words Total
Supply, Installation, Testing and Commissioning of Pre Fabricated
Modular Operation Theater Panels (Walls and Ceiling) made out
Polyurethane foam injected at 40 Kg/m3 sandwiched between
0.8 mm thick GP/SP sheet on front side and 0.5 mm GP/SP/PPGI sheet
on back-side. The inner surface walls be fixed to the bricks wall with
essential support. There will be minimum possible cavity/gap in
between solid and steel walls and will be variable to suit the architects
lay out for the flush mounting of the equipments. The wall and ceiling
panels must comply with necessary provision of to JIS Z 2801/ISO
22196, BS EN 1363-1:2020, EN 1363-2:1999, EN 1364-1:2015, DIN
52210-2:1984-08, DIN 4102-1, Class A2. Any Third-party compliance
Rupees Six
certificate mandatory. Panel should be covered with protective sheath
Thousand Five
1 Penels of 300 d.f.t Anti-bacterial Paint having undergone Washability/Water 138.88 Sq Mtrs. 6,550.00
Hundred Fifty
resistance Test JIS K 5663.7.12, permeability test less than 200 unit of
permeability, Anti-bacterial effect against staphyloccoccus aureus,
Escherichia coli (via HALO test) and safety and causative agents such as
formaldehyde, toluene, xylene, paradichlorobenzene etc. Third party
(NABL approved Lab) certification for EGP and thickness test certificate
to be submitted
at time of supply.
Supply, Installation, Testing and Commissioning of Ceiling Filtration
System - The ceiling filtration system in the surgical theatre should
ensure a unidirectional distribution of sterile air, covering all areas
affected by the airflow. It should consist of a laminar flow system
incorporated within a frame made from thick extruded aluminum
profiles, complete with a sealed gasket to prevent leaks. The system
should incorporate "H 14" class HEPA filters positioned in the ceiling
plenum. These filters should achieve an MPPS average efficiency greater
than 99.95% and a 3-micron DOP efficiency greater than 99.99%. The
filters should also be designed to handle a final pressure drop of no
more than 600 Pa, operate at a maximum temperature of 60 degrees
Celsius, and function effectively within a relative humidity range of 40-
50%. The filtration ceiling system should be capable of maintaining a Rupees Three
2 HEPA filters constant airflow velocity of 0.25 m/s at the diffuser. This should be 1.00 Nos. 3,90,000.00 Lakh Ninety
accomplished through the use of a diffuser or flow equalizer that Thousand Only
ensures uniform and constant air distribution over the entire surface
area. The structure holding the filtration system, including the filter
frames and top plenum, should be made from either aluminum or
stainless steel. The system should be CE/UL certified and designed to
achieve an ISO 14644/1 classification of ISO 5, with a bacteriological
class of B (5 CFU/m3) and particle decontamination kinetics CP of
minutes. After installation, the system's performance should be
validated by a third-party government-approved environmental lab to
ensure compliance with specified standards. A positive pressure should
be maintained inside the operating theatre to prevent contamination
from external air sources. The supplier should provide test certificates
for the HEPA filters and the laminar airflow systems from the original
manufacturers. Furthermore, the size of the laminar airflow system
The flooring within the surgical theatre should consist of a minimum of2
mm thick antistatic seamless PVC, ensuring durability and safety. This
floor should be smooth, non-slip, and made from an impervious material
with sufficient conductivity to dissipate static electricity effectively, yet
not so conductive as to risk electric shock to personnel. The PVC used
should be of very high quality, particularly designed for electrostatic
charge dissipation, and should not be less than 2 mm in thickness. The
installation process should utilize continuous rolls, and joints should be
seamlessly welded using special PVC thermal welding units with
welding bars of the same color to ensure uniformity and prevent
contamination. The sheets should be highly durable, capable of resisting
shocks, indentations, and scratches. The conductive material should be
uniformly impregnated within the PVC as grains to enhance its antistatic Rupees Four
Vinyl Flooring properties. Additionally, the flooring should be inert to body fluids,
Thousand Two
3 45.14 Sq Mtrs. 4,250.00
chemicals, and disinfectants, and remain unaffected by temperature Hundred Fifty
variations typical within an operating theatre. It should efficiently Only
discharge electric charges up to 2 kV, and the electrical resistance (point
to ground) should be maintained within 2.5x10^4 to 5x10^6 ohms,
ensuring no buildup of electrical charge beyond 100 volts. Floor
installation should be performed by skilled workers from accredited
agencies authorized by the PVC sheet supplier. The installation should
include a conductive copper grid beneath the PVC sheet, supported by
liquid epoxy compounds to create a uniform and level surface. Copper
strips should be made visible by grinding and not project more than
0.5mm above the floor level to prevent damage to the PVC sheet, with
one earthing lead brought out from every 150 sq.ft area and attached to
the main earthing strip/ground. The flooring should also be
mechanically shockproof, scratchproof, flame retardant, and
The door to the surgical theatre should be a hermetically sealed, single
sliding door measuring 2.1 meters in height and 1.5 meters in width.
The door should be equipped with a controller capable of being
operated by elbow switches, foot switches, and a touchless sensor,
providing multiple, accessible control options. The track for the door
should be made from stainless steel or aluminum, with the running
surface for the top rollers angled appropriately to minimize resistance
and facilitate smoother movement. The door leaf should be suspended
using high-quality hard plastic rollers with double bearings at the top.
These rollers should run under the stainless steel or aluminum track to
ensure smooth and noiseless operation. The opening and closing
mechanisms of the door should be controlled by a microprocessor for
precise electromechanical movement. The material of the door should Rupees Two
4 Doors be either SMS or HPL, with a color that matches the interior design. The 2.00 Nos. 2,95,000.00 Lakh Ninety Five
door should be designed to be strong yet lightweight for ease of use. In Thousand Only
case the automatic mechanism fails, the door should still be able to open
and close effortlessly manually. The handle of the door should be made
from stainless steel with a matte finish and equipped with a high-quality
cylindrical or ESPg lock for security. The door leaf should incorporate a
high-quality synthetic rubber gasket with long durability to ensure
hermetic sealing and maintain a 99.99% air tightness at a minimum
pressure of 75Pa. The floor on either side of the door should be perfectly
level, with a maximum permissible difference of +1mm, to avoid any
tripping hazards or unsealed gaps. The overall thickness of the finished
door should range from 30-60mm, with the inner part of the door filled
with CFC-free polyurethane foam, approximately 48mm thick, sealed
airtight to block any microbial ingress. The door and its controls should
comply with IEE regulations, utilizing DC brushless or PMDC motors
Supply, Installation, Testing and Commissioning of Membrane-Type
Operation Switch and Communication Controller - The Operation Switch
and Comms Controller should encompass all necessary controls to
ensure the proper operation and monitoring of equipment and services
in the operating room (OR). Positioned for optimal visibility in the
surgeon's line of sight and the OT staff, the wall-mounted membrane-
buttons should be easily accessible to the nurse for operation and
assistance. In addition to hosting a digital clock and elapsed time
indicator, the panel should feature a medical gas alarm, clearly
indicating high and low gas pressures for each gas service, including
vacuum, supported by an audible alarm. The Operation Switch and
Comms Controller should also provide an alarm mute option for fault
annunciation, with pressure sensors strategically located near isolation Rupees One lakh
5 Control Panel valves. Controls for general lighting, including ON/OFF and dimming, 1.00 Nos. 1,95,000.00 Ninety Five
organized in groups for uniform illumination, should be present. Thousand Only
Furthermore, the panel should facilitate control over operating lights
(major and satellite) and camera functions (on/off and intensity). A
hands-free telephone set with memory should be conveniently situated,
and temperature and humidity controls for the room, linked to the AHU
(+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control
Valve (whichever is applicable), should be adjustable from the
Operation Switch and Comms Controller. Real-time indicators, such as a
digital room pressure indicator and HEPA filter bank differential
pressure indicator, are essential for monitoring and maintaining a safe
and controlled environment in the operating room. Telephone with
Alpha-numeric keyboard is required with Speed-dialing option
Hatch boxes should be provided in each operating theater to facilitate
the safe and efficient removal of waste materials to the dirty linen area
or adjacent corridor. Each hatch box should be equipped with two
doors, operated electrically or motorized, designed such that only one
door can be opened at a time to prevent cross-contamination. UV
Rupees One Lakh
lighting should be installed to ensure sterilization and should remain on
6 Hatch boxes 1.00 Nos. 1,15,000.00 Fifteen
when both doors are closed, automatically turning off when either door
Thousand Only
is opened. Indicators should be provided on both sides of the operating
theater to monitor the door open/close status. The material of the hatch
box should also be SS304 grade stainless steel, with a minimum size of
In each operating theater, an operating list board should be installed. It
should be made of ceramic with magnetic properties and should be
flush with the wall to maintain cleanliness and ease of use. LED type flat
panel X-ray viewing panels should be provided, complying with relevant
electrical safety codes, and mounted flush with the wall to prevent dust Rupees Twenty
accumulation and microbial growth. The body should be made of Eight Thousand
7 list board 1.00 Nos. 28,500.00
extruded aluminum, powder-coated with a bacteria-resistant and Five Hundred
disinfectant-resistant finish. The diffuser on the front panel should Only
provide a uniformly lit screen, and dimming controls should be easily
accessible. Additionally, a proper spring-loaded film clip with rollers
should be included to securely hold and easily remove films without
causing scratches.
LED type flat panel X-ray viewing panel should be supplied. This should
comply with relevant electrical safely codes. This should be a 2-panel
viewing screen. Mounting should be flush with the wall to avoid dust
accumulation and growth or organisms between wall and panel. Body
Rupees Fourty
X-ray should be of extruded aluminium powder coated black with bacteria
one Thousand
8 viewing resistant and disinfectant resistant finish. The diffuser on the front panel 1.00 Nos. 41,500.00
Five Hundred
panel should be a uniformly lit screen. Dimming electronic control should be
enclosed at the bottom of the cabinet. Proper spring-loaded film clip
with rollers should be provided to hold the films firmly and to remove
the film without scratches
Supply, Installation, Testing and Commissioning of Double-Bay Scrub
Sink - The scrub station should be compact, designed for use in the OT
complex, and facilitate pre-procedural scrubbing. It should be made
from heavy gauge type 304 stainless steel with a minimum thickness of
1.5mm and feature seamless welded construction polished to a satin
finish. The scrub sink should have a front access panel for easy
maintenance of water control valves, waste connections, stoppers, and Rupees One Lakh
9 strainers. Hands-free operation should be enabled through infrared 1.00 Nos. 1,26,000.00 Twenty Six
sensors with programmable adjustments. Thermostatic mixing valve Thousand Only
control should maintain constant water temperature and be located
behind the access panel. Timing should be adjustable to meet individual
usage requirements, and units should have reduced anti-splash fronts.
An additional knee/foot-operated switch should also be provided for
enhanced functionality.
Supply, Installation, Testing and Commissioning of Storage Units -
Storage units should be constructed with same material, as wall and
ceiling panels. The shelves, made of glass and, should be removable for Rupees Eighty
10 Storage Units cleaning. The unit should be divided into two or more parts, each with 2.00 Nos. 85,000.00 Five Thousand
individual glass doors equipped with a high-quality locking system. The Only
overall size of the storage unit should
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
Supply, Installation, Testing and Commissioning of Peripheral Lighting -
To enhance the operational environment of each operating theatre,
peripheral lighting and clean room luminaries should be installed, with
a minimum of eight units per theatre. These lights should offer an
intensity of at least 500 Lux and be housed in highly specular anodized
aluminum with an optical antiglare system to minimize visual fatigue
and glare. Each peripheral light should measure 2' x 1'. The covers for
these luminaries should be constructed from highly resistant,
disinfectant-proof laminated safety glass or acrylic, featuring a stylish,
fine-grained surface that complements the clean and sterile
environment of the operating theatre. The body of the luminaries should
be made from sheet steel, perfectly powder-coated to resist
Rupees Twenty
Peripher contamination and facilitate easy cleaning, and should be ready for
connection either as individual units or within a series circuit. This Two Thousand
11 al 10.00 Nos. 22,500.00
Five Hundred
Lighting setup should include digital electronic control gear utilizing multilamp
technology to optimize energy efficiency and light output. The Only
installation of these luminaries should ensure that the recess frames are
gas tight. Each fitting should be flush with the ceiling and designed to be
removable from either the top or bottom for ease of maintenance. It is
crucial that the light fittings are uniformly and aesthetically distributed
across the ceiling to provide consistent illumination throughout the OT,
without interfering with visibility during procedures such as green
mode endoscopy. Furthermore, the peripheral lighting system should
conform to IP65 or IP54 international protection ratings, ensuring that
the fixtures are dust tight and protected against water ingress, suitable
for the demanding conditions of an operating theatre.
Control equipment for both general lighting and light dimming
functionalities should be centralized within the theatre control panel, Rupees Eighty
12 allowing for precise adjustments to meet varying procedural 1.00 Nos. 85,000.00 Five Thousand
requirements and enhance the functionality and flexibility of the Only
lighting system in the operating theatre.
Supply, Installation, Testing and Commissioning of Electrical Wiring
inside OT - Power distribution within each Operating Theatre (OT)
should be handled via distribution boards located locally to each
theatre using Fire Resistance Low Smoke Wiring, layed in PVC conduits
of reputed brand. The sub mains power to these panels should be
provided by the general electrical contractor, and all distribution
services within the departments should run from these panels. The
power distribution unit should hold certifications such as EN, CE, FDA,
IEC, and BIS to ensure compliance with international safety and
performance standards. Each wall of the MOT should have a minimum
of two hybrid switch sockets (6/16A) on each wall, in compliance with
IEC standards. Light fittings within the clinical areas should be recessed
LED types equipped with control gear and sealed in accordance with the Rupees Two
13 IP54 standard. This standard ensures that the fittings are protected 1.00 job 2,99,000.00 Lakh Ninety Nine
against limited dust ingress and water spray from all directions, suitable Thousand Only
for clinical environments. All equipment should be fully and
permanently labeled to clearly identify and describe the function,
operation, and voltage of the apparatus concerned. Upon completion of
the electrical installation, tests should be carried out in accordance with
the relevant sections of local wiring regulations, with results duly
recorded. Each OT should have a distribution board (DBs) installed,
with suitable wiring. A separate enclosure should house all high-voltage
equipment to ensure safety and isolation. The remote cabinet should
contain operating lamp transformers, mains failure relays, UPS,
electrical distribution equipment, and circuit protection equipment for
all circuits within the operating theatre. All internal wiring within the
DBs should terminate in connectors equipped with screws and clamp
springs. Connections should be of the clip-on type mounted on a rail
AIR HENDALING UNIT Make:KrVelocity: Not More Then 8 to
mt/second. , Canvass Connection-Heavy duty, non partical shreding,Fire
Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically
capecity. Motor Make:Siemence,B.B,Crompton,ABB , Type:TEFC, IP:55,
Foot Mounted, VFD compitable and I2 generation Safety: Motor should
AIR have interlocked with AHU Motor door/excess/Fire DamperType-TWO
Rupees Twelve
HENDAL TIRE, Floor Mounted , Inner const.:0.6mm plain G.I , Outer const.:0.8 mm
14 1.00 job 12,25,000.00 LakhTwenty Five
ING G.I. Pre coated / Powder coated Thickness of Insulation: 25mm,PUF
Thousand Only
UNIT injected having density 40 to 42 kg/m3. ,Colour:As approved by CLIENT
CONDENSING UNIT :
Condensing unit for AHU with all assesories and instalation (Copper
pipie provide 3 mtr Only Extra will charged extra) consider
sqfeet insulation and ducting
Double Dome OT Light with Ceiling mounted Double Dome LED OT
lights having following features and enclosed technical specifications,
having Mobile App Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment -
10 – 100% (using Digital Capacitive Touch (Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
-Working range - 1 m
Rupees Three
-Color rendering index 93Ra
15 OT Light 1.00 Nos. 3,90,000.00 Lakh Ninety
- Focusing Preset: Adjustable
Thousand Only
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO
License for this product under Class A, Compliant to IEC standards such
as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test
Certificates to be submitted with Bid) Clause-wise Technical Compliance
Single-arm surgery/anesthesia pendant designed for Operating
Theatres should feature a compact, modular configuration to meet the
precise requirements of hospitals, enabling customization to suit
specific operational needs of both Operating Theatres and Intensive
Care Units. It should be equipped with robust ceiling support capable of
functionality, should allow horizontal movement with a radius of 800-
900mm and provide a level rotation ranging from 0 to 330/340 degrees,
with both the extension arm and terminal box designed to rotate
together and independently for maximum versatility. The pendant
should support a net loading capacity of min. 100 kg, accommodating a
variety of medical instruments and devices securely. For medical and
electrical services, it should offer configurations that include at least two Rupees Two
16 Pendant oxygen outlets, two vacuum outlets, one medical air, one medical air at 7 1.00 Nos. 2,84,000.00 Lakh Eighty Four
bar, and an optional nitrous oxide outlet (In-scope of MGPS vendor) Thousand Only
Additionally, there should be six main sockets, each capable of
supporting 5 to 15 amps, conforming to universal standards to facilitate
the operation of various medical and electronic devices. In terms of
materials and construction, the pendant should be crafted from high-
strength aluminum alloy with a sealed design to enhance durability and
maintain sterile conditions. The arm itself should be made from high-
density aluminum alloy extrusion, ensuring both strength and
reliability. Installation of the pendant should be ceiling-mounted to
provide a reliable and firm setup, optimizing space usage in the
Operating Theatre or ICU while seamlessly integrating with existing
medical systems for managing medical gas, electrical services, data
communication, and equipment. Additionally, the pendant should
include practical features such as a stainless steel IV pole and a ward
Providing and fixing UPS (10KVA) Of Good Quality as directed by Rupees Three
engineer incharge Lakh Seventy
17 UPS 1.00 job 3,75,000.00
Five Thousand
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc
reuired Point(from existing line ) as directed by engineer incharge from Rupees Three
18 MGPS Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for 1.00 job 3,45,000.00 Lakh Fourty Five
all line) , Point ,Flowmeter and Probe . if alredy then no payment given Thousand Only
Sub-Total
In Words: Rupees Fifty Nine Lakh Eighty Five Thousand Five Hundred Nine Only
(A) Total tender amount Rs.
(B) Rebate on above tender amount (if any) (% in figure)________(% in Words)___________________________________________ Rs.
(C ) Net tendered amount (A-B) Rs.
(D) Net Tendered amount (In words) : Rupees
1 All works shall be carried out as per Public Work Department and other specification of division or as directed.
All the columns in the contractor be filled in ink and the total of the entries in the last column should be struck by the contractor under
his signature.
Rates quoted include clearance of site ( prior commncement of work and its close). In all respect and held good for work under all
condition, site, moisture, weather etc.
Testing of materials shall be as per statement attached with the specifications. The material shall be tested in GERI testing charges @
4 1% of the amount as per the schedule -B shall be recovered from the contractor from the running bill as per G.R. (E&R) deptt. No.
TKC/1085/4-S dt. 20-12-91. Test results other than GERI will not be accepted.
1% of the construction cost of shall be deducted from bill amount of contract, as per hthe building and other construction worker's
welfare cess act. 1996. (Labour & Employment department letter No. C.W.A. - 2004 - 1831- M(3), Dt. 09/12/2005, Notification of
labour & Employment Department. Dt. 03-01-05- and Labour & Employment Department. letter No.C.W.A. - 2004 - 1831- M(3),
CERTIFICATE
Quantity, rates & working of items are as per estimates and calculation in the schedule "B" are arithmetically checked and found correct.
Deputy Executive Engineer Executive Engineer
Project Implementation Unit Project Implementation Unit
Mahisagar Mahisagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BUILDING SPECIFICATION BOOKLET.pdf
22.PLUMBING SPECIFICATION.pdf
ElectricalSpecification.pdf
GR-Special Conditions All.pdf
Dtp Statement Sdh Santrampur.pdf
NIT MOT SDH Santrampur.pdf
SBD Modular MOT Final.pdf
SCHEDULE-B MOT SDH Santrampur.pdf
Specification MOT SDH Santrampur.pdf
05-Final Draft PQ for OT-CE sir-09-01-2026.pdf
Download all tender documents and submit your bid