Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
1 Oct 2026, 6:00 pm
The Chief Officer, Dahod Nagarpalika, Dahod
BID DOCUMENT FOR CONSTRUCTION WORK OF C.C. ROAD IN VARIOUS AREA AT DAHOD NAGARPALIKA UNDER: 15TH FINANCE SCHEME -UN TIED GRANT (FIRST INSTALLMENT) YEAR 2024-25.
345556
15TH FINANCE SCHEME -UN TIED GRANT (FIRST INSTALLMENT) YEAR 2024-25.
Open
Civil Works - Roads
Works
Dahod
14 documents required · 14 mandatory
₹7,080
The Chief Officer, Dahod Municipality, Dahod
₹3.4 L
16 Sept 2026
16 Sept 2026
16 Sept 2026
1 Oct 2026
16 Sept 2026
SBD SECTION-7 BILL OF QUANTITIES-141
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of
Division or as directed.
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects
and hold good for work under.
Note : 3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Signature of Contractor President Chief Officer
Dahod Nagarpalika Dahod Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-142
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT GOOD HOME CHRISTIAN
CHURCH HAKIMI SOCIETY AMBAWADA GHER TO MISSION CHURCH SUDHI , AT DAHOD. (WARD-1) (PHASE-
Item Qty. Description Total Unit Amount
1 246.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 492.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 328.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 328.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 328.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1640.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
charge . 75.75 Smt.
SBD SECTION-7 BILL OF QUANTITIES-143
7 49.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 13.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-144
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT DUNGRI FALIYA VRUNDAWAN
PARK NI GALI MA , AT DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 121.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 243.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 162.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404 of
M.O.R.T. & H. specification etc. complete. 1205.98 Cmt.
4 162.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 162.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete. 4247.21 Cmt.
6 810.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-145
7 24.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 7.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-146
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT NEAR VISHNU TREDERS HOUSE
, AT DAHOD. (WARD-2).
Item Qty. Description Total Unit Amount
1 48.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 96.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 64.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 64.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 64.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete. 4247.21 Cmt.
6 319.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-147
7 10.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 3.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-148
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT GOOD HOME CHRISTIAN
CHURCH HAKIMI SOCIETY AMBAWADA GHER TO MISSION CHURCH SUDHI , AT DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 199.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 399.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 266.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 266.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 266.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1330.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-149
7 40.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 10.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-150
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT AMBIKA NAGAR SUNIL DAMOR
WALI GALI , AT DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 81.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 162.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 108.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 108.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 108.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 540.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-151
7 16.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 6.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-152
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT AMBIKA NAGAR LALIT
DHARMARE WALI GALI , AT DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 91.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 183.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 122.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 122.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 122.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 610.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-153
7 19.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 7.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-154
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT NAMRATABEN WADI GALI
(KRUSHNANAGAR) , AT DAHOD. (WARD-4)
Item Qty. Description Total Unit Amount
1 25.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 50.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 34.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 34.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 34.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete. 4247.21 Cmt.
6 168.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-155
7 5.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 3.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-156
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT AMBIKA NAGAR MOCHI NE
CHAL MANDIR WALI GALI , AT DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 238.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 477.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as directed
upto 50Mt.lead.
3 318.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 318.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 318.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1590.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-157
7 48.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 14.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-158
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT RANGOLI PARK SOCIETY , AT
DAHOD. (WARD-1)
Item Qty. Description Total Unit Amount
1 90.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 180.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 120.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404 of
M.O.R.T. & H. specification etc. complete. 1205.98 Cmt.
4 120.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 120.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 600.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-159
7 18.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 6.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-160
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT PUSHPAKUNJ REMAINING
ROAD , AT DAHOD. (WARD-2).
Item Qty. Description Total Unit Amount
1 101.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 202.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 135.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 135.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 135.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 675.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-161
7 20.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 8.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-162
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT SINGLE FADIYA , AT DAHOD.
Item Qty. Description Total Unit Amount
1 122.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 245.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 163.50 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 163.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 163.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass concrete.
6 816.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas
as per requirement and labour charges on directed by
Engineer-in-charge .
SBD SECTION-7 BILL OF QUANTITIES-163
7 25.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 10.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-164
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT SIDDHPURI SOCIETY , AT
DAHOD. (WARD- 3)
Item Qty. Description Total Unit Amount
1 105.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 210.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 140.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404 of
M.O.R.T. & H. specification etc. complete.
4 140.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 140.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 700.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-165
7 21.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 8.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-166
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT KARTIKEY SOCIETY SIDE
COLONY & BECK SIDE COLONY , AT DAHOD. (WARD-2).
Item Qty. Description Total Unit Amount
1 162.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 323.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 215.50 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404 of
M.O.R.T. & H. specification etc. complete.
4 215.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 215.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1077.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-167
7 32.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 11.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-168
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT YOUNGER SHIF TO DR DAVE
DISPENSARY , AT DAHOD. (WARD- 3)
Item Qty. Description Total Unit Amount
1 157.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 314.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 209.50 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 209.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 209.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1047.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-169
7 31.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 9.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-170
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT ARIFBHAI LUHAR HOUSE TO
CHUNAWALA COMPOUND , AT DAHOD. (WARD- 3)
Item Qty. Description Total Unit Amount
1 99.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 198.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 132.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 132.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 132.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 660.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-171
7 20.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 6.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-172
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C.ROAD AT THAKKAR FADIYA RAJASTHAN
BHAVAN MAIN ROAD , AT DAHOD. (WARD- 3)
Item Qty. Description Total Unit Amount
1 191.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 382.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 255.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1205.98 Cmt.
4 255.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 255.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1275.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
charge . 75.75 Smt.
SBD SECTION-7 BILL OF QUANTITIES-173
7 38.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 6.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-174
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD.pdf
Notes.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .