Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.6 LAdmitted-Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | -26.00% | ₹36.6 L | L1 | Admitted-Finance |
| 2 | L2₹42.0 L+₹5.4 L (14.9%)Admitted-Finance | -15.01% | ₹42.0 L+₹5.4 L (14.9%) | L2 | Admitted-Finance |
| 3 | L3₹49.4 L+₹12.8 L (35.1%)Admitted-Finance | -0.01% | ₹49.4 L+₹12.8 L (35.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Dus qualified due to non submiossion of epf,pan,gst as per clause no 2.3 ii,Schedule A,.B,C as per cluse no 2.4 ii(a,b and c) and work experience certificate under DTCN clause 2.3 iii |
Tender Value
₹49.4 L
EMD Value
₹49,400
Closing Date
3 Jul 2026, 5:00 pmClosed
GM(C), OMC Ltd.
Office of the GM(C), OMC Ltd., Bhubaneswar
Construction of C.C. Approach road, R.C.C. retaining wall and Porta cabin Foundation for 2 numbers weigh Bridge (WB 4 and WB5 5) at Jiling Mines of Barbil region in the district of Keonjhar
2026_OMC_132325_1
NIT No.20/OMC/CIVIL/2026
Open Tender
Civil Works - Others
Percentage
245 days
JILLING MINES
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹7,080
₹49,400
Yes
29 Jul 2026
19 Jun 2026
4 Jul 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 216.3 | Cum | 408.8 | ₹88,423.44 |
| 1.02 | Excavation of founation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P etc. comp. as directed by EIC. | 54.1 | Cum | 2,030.1 | ₹1,09,828.41 |
| 1.03 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | 23.65 | Cum | 1,191.1 | ₹28,169.51 |
| 1.04 | P.C.C .of prop.(1:4:8) in foundation using 40 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC. | 23.65 | Cum | 6,523.7 | ₹1,54,285.5 |
| 1.05 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in footing | 40 | Cum | 7,408.65 | ₹2,96,346 |
| 1.06 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in wall | 97.4 | Cum | 14,045.9 | ₹13,68,070.66 |
| 1.07 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in column | 6.5 | Cum | 14,918.3 | ₹96,968.95 |
| 1.08 | Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. | 13.8 | Ton | 88,556.3 | ₹12,22,076.94 |
| 1.09 | Loosening, leveling and compacting original gravel supporting emabankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table-300.2 for embankment consruction etc complete as per direction of EIC. | 197.85 | Cum | 66.2 | ₹13,097.67 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBD_1.pdf
Tender Documents • 3.81 MB
BOQ_596953.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .