Construction of School Building for Boys Middle School Naibasti Anantnag.
2026_PWDJK_328271_1
NIT 111 of RnB/Ang/2026-27/8674-83 Dt 14/10/26
Open Tender
Civil Works
Percentage
720 days
Anantnag
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
Centralized Designated Pooling Ac 0470010200000099
₹2.8 L
15 Oct 2026
15 Oct 2026
23 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | - | - |
| 2 | Earth work in bulk excavation by Mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 394.92 | CUM | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 325.15 | CUM | - | - |
| 4 | Supplying and laying of quarry stone soling hand packed tightly incl ramming watering and filling of interstices incl all carriage complete job excluding the filling availabe at sight | 107.99 | CUM | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) incl all carriage complete job | 17.44 | CUM | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage of materials | 41.63 | CUM | - | - |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.
All works UPTO plinth level . | 125.9 | CUM | - | - |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.
All works above plinth level upto floor 5 level. | 110.95 | CUM | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting. bending, placing in position and binding all complete above plinth level TMT steel bar | 26,053.92 | kg | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1111260.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .