Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹19,683
Closing Date
27 Jul 2026, 3:00 pmDue tomorrow
EE-II works SVPMC
EE-II works SVPMC
Construction of CC Road and Box Type Culvert with Hollow Blocks Wall Works and Covering Slabs starting from Shri Sathaiah House to Shri Srinuwas Rao s Gandi House at Japan Road Dairy Farm Ward No 15
2026_PMBC_23859_1
08/EE-II/Wks/R/MC/2026-27
Open Tender
Civil Works - Roads
Works
90 days
Japan Road Dairy Farm Ward No 15
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19,683
20 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge.
a) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 4.72 | Cum | 3,434.36 | ₹16,210.18 |
| 2 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | 2.39 | Cum | 3,977.05 | ₹9,505.15 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
A) In cement mortar | 3.2 | Cum | 2,906.63 | ₹9,301.22 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil | 5.31 | Cum | 367.24 | ₹1,950.04 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 0.57 | Cum | 276.53 | ₹157.62 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.27 | Cum | 9,610.71 | ₹69,869.86 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Foundations, footings, bases of columns, etc. for mass concrete | 30.52 | Sqm | 553.26 | ₹16,885.5 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for
a)Columns, Pillars, Piers, Abutments, Posts and Struts | 3.3 | Sqm | 1,356.25 | ₹4,475.63 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for
a)Lintels, beams, plinth beams, girders, bressumers and cantilevers | 19.7 | Sqm | 1,038.95 | ₹20,467.32 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Walls (any thickness) including attached pilasters,butteresses, plinth and string courses etc. | 36.21 | Sqm | 1,188.64 | ₹43,040.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_25285.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].