Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹176.40 (0.06%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
24 Jul 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
Improvement of Paristan Khul/Putkhah Khul from Zahoor Ah Rather to Astan under ADP (PRI) year 2026-27 P/H Sonium Block Lalpora
2026_RDPR_315401_15
94/Xen/Rew/Bla/2026-27 Dated 10/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,880
27 Jul 2026
10 Jul 2026
25 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting | 15 | cum | - | - |
| 2 | Constructing vertical bunds with sloping faces, by Stone filling (dry,
hand packed tightly); including cost of stones and cost of wire crates | 45.9 | cum | - | - |
| 3 | Back filling behind bunds using matrial available at site | 9.18 | cum | - | - |
| 4 | RANDOM RUBBLE MASONRY
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) incl all carraiges of material | 5.58 | cum | - | - |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone incl carraige of material | 22.32 | cum | - | - |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 and curing complete | 9 | sqm | - | - |
| 7 | P/F of information sign board and site photographs. | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1023276.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1023276.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .