Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
10 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
DEE TRS
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; (as per Advance Correction Slip No. 1 to Indian Railways Standard General Conditions of Contract, Apil-2022 Rly. Board Letter no. 2022/CE-I/CT/GCC-2022 Policy Dt. 14.07.2022), where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
10.1 Technical Eligibility Criteria: (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. All the conditions of para 10.1 Technical Eligibility Criteria of IRGCC, April 2022 will follow.
Defination of Similar Work :- OEM/RDSO/CLW approved sources for the manufacture and supply of Traction Motor/Bogie Frame for any Electrical/Diesel Locomotives. O R OEM/RDSO/CLW approved sources for the Repair/Rehabilitation of Traction Motor/Bogie Frame for any Electrical/Diesel Locomotives. O R Uncoupling/Dismantling/Stripping of Traction Motor/Bogie & its components of Diesel/Electric locomotives/EMU/MEMU/DEMU. O R The Repair / Overhauling / Maintenance / Conversion / Upgradation of Transformer / Traction Motor / Bogie / Centre Pivot / Driver Cab / Pneumatic piping of Electric/ Diesel Locomotive. O R The Repair / Overhauling / Maintenance / Conversion / Upgradation of Transformer / Traction Motor / Bogie / Centre Pivot / Driver Cab / Pneumatic piping of EMU / MEMU/DEMU
3 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All tenderers are advised to kindly go through the tender document attached herewith carefully.
Cleaning, stripping/dismantling/Uncoupling, of Mechanical components of Electric locomotive at ELS/BSP.
TRS-BSP-25-26-OT-17~SECR
TRS-BSP-25-26-OT-17
Open
Works - General
24 Months
Bilaspur, Chhattisgarh
₹0
₹3.6 L
10 Apr 2026
19 Mar 2026
27 Mar 2026
141 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,79,72,909.57 | ||
| — | — | — | Above/ 39194.70 Below/P | ||
| Equipment: Brake Cylinder: Dismantle Brake cylinder of both boogie by opening M12 bolt 48 Nos. | — | 30.00 | — | — | |
| — | — | — | Above/ 209038.40 Below/P | ||
| Cleaning all parts of brake cylinder during IOH/TOH. | — | 160.00 | — | — | |
| — | — | — | Above/ 310289.00 Below/P | ||
| Detachment of brake piston from brake cylinder for overhauling and cleaning during any schedule. | — | 1900.00 | — | — | |
| — | — | — | Above/ 1259593.10 Below/P | ||
| Cleaning of components during Axle box greasing in every IC/TOH. | — | 730.00 | — | — | |
| — | — | — | Above/ 77646.30 Below/P | ||
| Cleaning of Axle box, back ring, angle ring, collar plate, racer and of open wheel sets during overhauling in IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 77646.30 Below/P | ||
| Removing of bearing from the Axle box housing and proper cleaning the grease with K. Oil and jute in every IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 629800.20 Below/P | ||
| Suspension tube grease cleaning after greasing in every IC/TOH. | — | 730.00 | — | — | |
| — | — | — | Above/ 77646.30 Below/P | ||
| Cleaning of Wheel sets including bull gear, MSU, Axle journal, wheel disc and labyrinth ring with oil and Jute in every IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 142200.00 Below/P | ||
| Removing of RACER of Axle Box as per requirement. | — | 360.00 | — | — | |
| — | — | — | Above/ 104760.00 Below/P | ||
| Removing of Axle Box as per requirement. | — | 360.00 | — | — | |
| — | — | — | Above/ 51764.10 Below/P | ||
| Scrapping /cleaning of gearcase with K. oil. Removing the fine iron particles from corners and magnetic drain plug. Cleaning the anabond from threaded holes in every IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 25882.20 Below/P | ||
| Removing the gearcase spyglass and the breather with specified spanner. Proper cleaning with oil and Jute then re-fitment in every IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 1725480.00 Below/P | ||
| Sand cleaning from sanders and sand removing released sand and throwing then into designated place in every inspection. | — | 2000.00 | — | — | |
| — | — | — | Above/ 473600.00 Below/P | ||
| Repairing of locomotive sanders at BSP loco shed incl. sanders repair equipments. | — | 8000.00 | — | — | |
| — | — | — | Above/ 602000.00 Below/P | ||
| Filling of Fine & dry sand in sand Box after inspection / Overhauling. | — | 14000.00 | — | — | |
| — | — | — | Above/ 77646.30 Below/P | ||
| Removing and cleaning of 36 no's spheriblocs from Torque Arm and Axle guide and cleaning in every IOH. | — | 30.00 | — | — | |
| — | — | — | Above/ 103480.00 Below/P | ||
| Removing and cleaning of 12 no's spheriblocs from Torque Arm and cleaning in every TOH schedule. | — | 130.00 | — | — | |
| — | — | — | Above/ 313920.00 Below/P | ||
| Removing and Fitment of Anti skid flooring in the CAB room of Locomotive. | — | 320.00 | — | — | |
| — | — | — | Above/ 230400.00 Below/P | ||
| Removing and fitment of Roof Gasket of Cab 1 side / Cab 2 side / Centre hood. | — | 480.00 | — | — | |
| — | — | — | Above/ 48640.00 Below/P | ||
| Painting of Inner CAB. | — | 160.00 | — | — | |
| — | — | — | Above/ 14240.00 Below/P | ||
| Fixing DECALS ( STICKERS ) in the loco. | — | 160.00 | — | — | |
| — | — | — | Above/ 152160.00 Below/P | ||
| CAB / Machine Room DOOR SEAL changing. | — | 160.00 | — | — | |
| — | — | — | Above/ 97280.00 Below/P | ||
| Changing of Foot Step Hardware. | — | 160.00 | — | — | |
| — | — | — | Above/ 72950.00 Below/P | ||
| Replacement of Front Lookout Glass with seal. | — | 50.00 | — | — | |
| — | — | — | Above/ 194400.00 Below/P | ||
| Replacement of Side Glass with seal in cab room. | — | 480.00 | — | — | |
| — | — | — | Above/ 199200.00 Below/P | ||
| Replacement of Door Glass with seal in cab room. | — | 480.00 | — | — | |
| — | — | — | Above/ 66400.00 Below/P | ||
| Replacement of Door Seals. | — | 160.00 | — | — | |
| — | — | — | Above/ 64800.00 Below/P | ||
| Replacement of Window Seals. | — | 160.00 | — | — | |
| — | — | — | Above/ 233440.00 Below/P | ||
| Replacement of look-out glass Seals. | — | 160.00 | — | — | |
| — | — | — | Above/ 11800.00 Below/P | ||
| Repairing of Door and other items of Water Urinals in 3-phase locomotives. | — | 40.00 | — | — | |
| — | — | — | Above/ 1039200.00 Below/P | ||
| Replacement of pins of Bogie frame in 3 phase Loco. One loco consists 02 bogie.(Qty: Per unit = Per Bogie) | — | 160.00 | — | — | |
| — | — | — | Above/ 176130.00 Below/P | ||
| Replacement of bushes of Bogie frame in 3 phase Loco. One loco consists 02 bogie. (Per unit = Per Bogie) | — | 30.00 | — | — | |
| — | — | — | Above/ 14400.00 Below/P | ||
| Removing of Vertical Damper. | — | 160.00 | — | — | |
| — | — | — | Above/ 31200.00 Below/P | ||
| Removing of Horizontal Damper. | — | 160.00 | — | — | |
| — | — | — | Above/ 31200.00 Below/P | ||
| Removing of YAW Damper | — | 160.00 | — | — | |
| — | — | — | Above/ 27200.00 Below/P | ||
| Removing of Axle Damper | — | 320.00 | — | — | |
| — | — | — | Above/ 78600.00 Below/P | ||
| Removal of CBC Coupling | — | 100.00 | — | — | |
| — | — | — | Above/ 69120.00 Below/P | ||
| Removal and fitment of Striker Block Wear Plate. | — | 80.00 | — | — | |
| — | — | — | Above/ 148050.00 Below/P | ||
| Fitment /Repair of CLI Inspection seat in CAB Room. | — | 630.00 | — | — | |
| — | — | — | Above/ 30240.00 Below/P | ||
| Placement and removing of spring from Spring Testing Machine for Testing of INNER Primary Spring. | — | 720.00 | — | — | |
| — | — | — | Above/ 34560.00 Below/P | ||
| Placement and removing of spring from Spring Testing Machine for Testing of OUTER Primary Spring. | — | 720.00 | — | — | |
| — | — | — | Above/ 12480.00 Below/P | ||
| Placement and removing of spring from Spring Testing Machine for Testing of Inner SECONDARY Spring. | — | 240.00 | — | — | |
| — | — | — | Above/ 22560.00 Below/P | ||
| Placement and removing of spring from Spring Testing Machine for Testing of Outer Secondary Spring. | — | 240.00 | — | — | |
| — | — | — | Above/ 81701.10 Below/P | ||
| Surface preparation for DPT and MPT test | — | 130.00 | — | — | |
| — | — | — | Above/ 917573.50 Below/P | ||
| Surface preparation for DPT and MPT test during IC/TOH schedule. | — | 730.00 | — | — | |
| — | — | — | Above/ 50277.90 Below/P | ||
| Surface preparation for DPT and MPT test during IOH schedule. | — | 30.00 | — | — | |
| — | — | — | Above/ 29328.60 Below/P | ||
| Sample vessels, Test machine cleaning & UST help. | — | 140.00 | — | — | |
| — | — | — | Above/ 137086.00 Below/P | ||
| Removing of Elastic Ring (Aclathamn ring) / centre pivoted housing in 3 phase locomotive. | — | 100.00 | — | — | |
| — | — | — | Above/ 363000.00 Below/P | ||
| Removing of old brake block from WAG 9 loco and placement of removed brake block to designated place and bringing new brake-block near loco for fitment. | — | 3000.00 | — | — | |
| — | — | — | Above/ 215750.00 Below/P | ||
| Replacement of Driver Seat in cab room as per requirement. | — | 250.00 | — | — | |
| — | — | — | Above/ 165915.00 Below/P | ||
| Replacement of Broken Axle Box Spring Without Lifting the Loco Body. | — | 45.00 | — | — | |
| — | — | — | Above/ 644480.00 Below/P | ||
| Removing of Gear Case from the wheel set, without lifting the Loco for any schedule/unscheduled work. | — | 160.00 | — | — | |
| — | — | — | Above/ 477675.00 Below/P | ||
| Removing of Gear Case from the wheel set, after the lifting of Loco Body for any schedule / unscheduled work. | — | 165.00 | — | — | |
| — | — | — | Above/ 86880.00 Below/P | ||
| Removal of Traction Link Bar of WAG9 Loco. | — | 30.00 | — | — | |
| — | — | — | Above/ 429600.00 Below/P | ||
| Removal of Traction Motor from coupled axle, without De-Wheeling of Bogie. | — | 160.00 | — | — | |
| — | — | — | Above/ 446240.00 Below/P | ||
| Removal of Traction Motor from coupled axle, after De-Wheeling of Bogie. | — | 160.00 | — | — | |
| — | — | — | Above/ 42080.00 Below/P | ||
| Removal & Fitment of buffer. | — | 160.00 | — | — | |
| — | — | — | Above/ 44750.00 Below/P | ||
| Removal & Fitment of sand box. | — | 250.00 | — | — | |
| — | — | — | Above/ 12160.00 Below/P | ||
| Removal & Fitment of cab door lock. | — | 95.00 | — | — | |
| — | — | — | Above/ 11305.00 Below/P | ||
| Removal & Fitment of machine room door lock. | — | 95.00 | — | — | |
| — | — | — | Above/ 356622.20 Below/P | ||
| Disconnection of loco body with loco bogie. | — | 220.00 | — | — | |
| — | — | — | Above/ 193727.25 Below/P | ||
| Removal of axle guide. | — | 225.00 | — | — | |
| — | — | — | Above/ 3600.00 Below/P | ||
| Removal of cattle guard. | — | 3.00 | — | — | |
| — | — | — | Above/ 421200.00 Below/P | ||
| Removal & Fitment of BP MR PIPE GUARD. | — | 1800.00 | — | — | |
| — | — | — | Above/ 102600.00 Below/P | ||
| Cleaning & painting of spring. | — | 1710.00 | — | — | |
| — | — | — | Above/ 535920.00 Below/P | ||
| Removal of knukle and screw coupling for dpt / mpt in any schedule | — | 4060.00 | — | — | |
| — | — | — | Above/ 987276.36 Below/P | ||
| Removal and fitment of axle box cover along with end cap with its assemblies of AC locomotive for UST of wheel set axle. | — | 9588.00 | — | — | |
| — | — | — | Above/ 536964.02 Below/P | ||
| Material movement from Stores to shop floor and back-shifting of removed materials to the nominated place. | — | 626.00 | — | — | |
| — | — | — | Above/ 1206295.74 Below/P | ||
| Supervision work performed by the skilled supervisor for the unskilled and semi- skilled manpower deployed by contractor for the work of 'Miscellaneous maintenance activities of major equipment of electric locomotives of ELS/BSP. total 03 supervisor i.e. 01 supervisor per shift) | — | 1878.00 | — | — | |
| — | — | — | Above/ 70665.00 Below/P | ||
| Loading, Unloading and shifting of all types of railway materials including scrap materials received or dispatched via truck or wagon etc for 81 store depot at ELS/BSP. (Per unit = Per MT) | — | 500.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
finalMechuncTD.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .