| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC | ₹6.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.7 Cr+₹51.7 L (8.32%)Rejected-AOC | ₹6.7 Cr+₹51.7 L (8.32%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.7 Cr+₹1.5 Cr (24.7%)Rejected-AOC | ₹7.7 Cr+₹1.5 Cr (24.7%) | L3 | Rejected-AOC L3 |
| 4 | L4₹8.1 Cr+₹1.9 Cr (30.4%)Rejected-AOC | ₹8.1 Cr+₹1.9 Cr (30.4%) | L4 | Rejected-AOC L4 |
| 5 | L5₹8.2 Cr+₹2.0 Cr (31.9%)Rejected-AOC | ₹8.2 Cr+₹2.0 Cr (31.9%) | L5 | Rejected-AOC L5 |
Tender Value
₹6.2 Cr
EMD Value
₹2 L
Closing Date
18 Mar 2025, 5:00 pmClosed
Managing Director KINFRA
TC 31/2312, Kinfra H.O,Kinfra House, Sasthamangalam, Thiruvananthapuram
Land Development work for balance area of 20 acres, construction of drain and formation of road at Kinfra Advance Technology Park at Puzhakkall, Thrissur
2025_KINFR_744267_1
KINFRA/THR/45/2024-25
Open Tender
Civil Works - Others
Item Rate
365 days
Advance Technology Park at Puzhackal
As per NIT
2 documents required · 2 mandatory
₹11,800
₹2 L
Kinfra Hitech Park Kalamasserry
6 Jun 2025
28 Feb 2025
21 Mar 2025
28 Feb 2025
18 Mar 2025
10 Mar 2025
5 Mar 2025
Amount
Yard Development, Drain & Road Formation
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
Construction of sub-grade, earthen shoulders and yard filling with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub base - Mix in Place Method
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Construction of Drain at Boundary
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
Supply and fixing of PVC pipes, fittings, including fixing, jointing of pipes with one step PVC solvent cement etc. complete as per the direction of Engineer-in-Charge. 75 mm pipe 4 kgf/cm2
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes includingcollars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2(1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.
TPK INFRA PROJECTS (BID ID -2157047)
K V Varghese (BID ID -2160149)
P P ABDUL NAZIR (BID ID -2161971)
PK SULPHEEKER INFRASTRUCTURE LLP (BID ID -2153458)
Geogy George K (BID ID -2160285)
Bidder Name
Dhileesh. C
K V Varghese
Geogy George K
P P ABDUL NAZIR
PK SULPHEEKER INFRASTRUCTURE LLP
TPK INFRA PROJECTS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .