Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | ₹13.0 L | L1 | Accepted-AOC Below rate |
| Sl No | Description | Qty | Unit | T.Sundarraj L1 |
|---|---|---|---|---|
| 1.00 | Dismantling and Clearing away existing for damaged IWC set including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 2 | No | 750 ₹1,500 Lowest |
| 2.00 | Chipping of concrete and roughening the surface and Clearing away from the site etc complete as per specification (PWD SOR Sl.No - 38A) | 10 | M2 | 43 ₹430 Lowest |
| 3.00 | Dismantling and Clearing away existing for Brick / Stone Masonry in cement mortar walls under 3m high including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 3.5 | M3 | 303 ₹1,060.5 Lowest |
| 4.00 | Dismantling and Clearing away existing for RCC by manual / by using deploying machineries including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 0.5 | M3 | 4,609 ₹2,304.5 Lowest |
| 5.00 | Dismantling and Clearing away existing for Plain Cement Concrete including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 10 | M3 | 520 ₹5,200 Lowest |
| 6.00Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | ||||
| 7.00 | Footing | 30 | M3 | 257 ₹7,710 Lowest |
| 8.00 | Grade Beam | 11 | M3 | 111 ₹1,221 Lowest |
| 9.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 5 | M3 | 1,757 ₹8,785 Lowest |
| 10.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 5.18 | M3 | 5,323 ₹27,573.14 Lowest |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Commissioner
Azad road,Karur
Karur City Municipal Coproation_SFC_School Improvement Grant 2025-26_Maintenance work and rejenuvation of compound wall to Vengakkalpatty Panchayat Union Elementary School in ward no. 48, zone 4 at Karur Corporation.
2026_MAWS_653249_4
E1/4371/2025
Open Tender
Civil Works - Buildings
Item Wise
120 days
KCMC
Pre Qualification and EMD scan Copy
2 documents required · 2 mandatory
₹0
₹16,000
16 May 2026
14 Feb 2026
17 Feb 2026
14 Feb 2026
17 Feb 2026
14 Feb 2026
14 Feb 2026 - 17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and Clearing away existing for damaged IWC set including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 2 | No | - | - |
| 2 | Chipping of concrete and roughening the surface and Clearing away from the site etc complete as per specification (PWD SOR Sl.No - 38A) | 10 | M2 | - | - |
| 3 | Dismantling and Clearing away existing for Brick / Stone Masonry in cement mortar walls under 3m high including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 3.5 | M3 | - | - |
| 4 | Dismantling and Clearing away existing for RCC by manual / by using deploying machineries including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 0.5 | M3 | - | - |
| 5 | Dismantling and Clearing away existing for Plain Cement Concrete including cost of conveyance and Labour Charges at site,Other Including Chargesetc., Complete | 10 | M3 | - | - |
| 6 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | - | - | - | - |
| 7 | Footing | 30 | M3 | - | - |
| 8 | Grade Beam | 11 | M3 | - | - |
| 9 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 5 | M3 | - | - |
| 10 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 5.18 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_788987.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .