Dy.Minicipal Commissioner - West Zone
Providing , Supplying & Laying Wetmix at Breakdown Work & Doing Handlaying Patchwork at diff. places in stadium ward . (A.R.C.)
295838
9/25-26 (T.N.33)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
9 Apr 2026
9 Apr 2026
9 Apr 2026
30 Apr 2026
9 Apr 2026
2. Tender Estimated Cost Rs.9,99,088.95
1% of the Tender Cost in the form (Rs.10000.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post
(ii) Mode of Sending A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt..01-05-2026 15:00 PM
Submission of EMD. Tender fee and other Documents during
Place of Submission & Opening of office hours: On Dt.01-05-2026 &12:00pm West Zone, 2nd
10. Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
11. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
Time permitted to start parts of as above by contractor the contractor shall be levied penalty of (1)
work Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
GST ftuLx[t¾xhlu «J<obtl GST yjd&e awfJJtbtk ytJNu.
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Addl.C.E.(west zone)
AHMEDAB AD MUNICIPAL CORPORATION ENGINEERING
Name of Work:- Providing , Supplying & Laying Wetmix at Breakdown Work &
Doing Handlayin g Patchwork at diff. places in st adium ward .
Ahmedabad Municipal Corporation
Engineering Department - West Zone
Name of Work :- Providing , Supplying & Laying Wetmix at Breakdown Work & Doing
Handlaying Patchwork at diff. places in stadium ward . (A.R.C.)
Sr. Quantity Item Description Rate Rs. Per Amount in Rs.
1 Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt
carpet, metal,s oiling/cutting Reinforcement etc.comp.
with stacking the material as directed. (Based on
Previously approved rate by C E sir )
a 5.00 up to 0.20 meter thickness (By Manual) 71.10 Smt
b 150.00 0.20 to 0.30 meter (By any type of Breaker 177.76 Smt
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
c 5.00 0.30 meter & above (By any type of Breaker 311.08 Smt
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
2 70.00 Barricading the entire break down or excavated area 79.99 Rmt
on rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint
/ Board out side to avoid accident & for smooth
traffic diversion & movement including cautionary board
etc. Item also includes for making temporary sufficient
nos of lighting arrangement through out the work
with necessary required arrangement. The same shall be
removed after completion of work.
3 150.00 Box cutting the road surface to proper slope and camber 127.13 Cmt
for making a base for road work including removing
the excavated stuff and depositing on the road side
slope as directed upto 200 Mt.lead
4 150.00 Conveyance charge of earth, lime, murrum, building 117.20 Cmt
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc
complete. Internal conveyance above 50 mt done
within the work site is not payable. (Road Project
5 Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision.
a 150.00 Production & Supply of WMM 1975.00 Cmt
b 150.00 Laying of WMM 35.00 Cmt
6 6900.00 Providing and applying Primer Coat with cationic 40.24 Smt
bitumen emulsion SS1 grade conforming to ASTM
GRADE on prepared surface of wet mix macadam
including clearing of Wet mix macadam surface with air
compressor to remove all loose material other foreign
material. The primer shall be sprayed uniformly at the
rate of 0.70-1.0 kg/sqm. It shall be applied by a self-
propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a
specified rate. No dilution or heating at site of SS1
bitumen emulsion shall be permitted. (As Per Road
7 660.00 Labour charges for hand laying hotmix material 449.68 MT
DBM/BC on the road surface in line & level
incl. cleaning the surface with Air Compressor and if
require re carting material by JCB at necessory place
of work also rolling with 8-10 Tonnes Vibratory Roller
and Dust spreading on BC after rolling, rate also
includes re- carting of Hotmix material from place of
Work/AMC store to Location of laying having narrow
width like chawls, poles, gamtal roads etc. complete. (As
Per Road Tender)
8 5.00 Hiring of Tractor with trolley considering 8 Hrs. As 2104.09 Day
working Day hours inclu. Driver (GWSSB SOR-2022-23
Section-2E- Miscellenous Item No.7)
9 Providing and supplying of labour for necessary
manual excavation, cleaning, Shifting of Material Or any
other, or for any other work as directed by Engineer In
charge. The Rate includes Handcart with Mazdoor
20.00 Labour charges - Mazdoor 493.00 EACH
20.00 Labour charges - Breaker 697.00 EACH
10 30.00 Providing & Supplying JCB Machine on rental basis 600.00 Hour
in case of emergency situation and break down
type work & also during unavoidable condition as
per instruction of Engg. In Charge, rate includes all
nece. Shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up
to store. (As per previous tender Rates)
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC of thickness up to
0.20 meter including demolishing the asphalt carpet, metal,s oiling/cutting Reinforcement
etc.comp. with stacking the material as directed. (Based on Previously approved rate by C E sir )
a) up to 0.20 meter thickness (By Manual)
b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete.
c) 0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc complete.
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at max.
meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic
diversion & movement including cautionary board etc. Item also includes for making temporary sufficient nos of
lighting arrangement through out the work with necessary required arrangement. The same shall be removed after
completion of work.
As per Instruction of Engineer Incharge
Box cutting the road surface to proper slope and camber for making a base for road work including removing
the excavated stuff and depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and rubbish of
all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be property of the
Government and be conveyed and stacked as directed. within 200 M. lead. The roots of the trees coming in the sides
shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full
responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply
laborers, materials, etc. required for setting out the reference marks and bench marks and shall maintain them as long
as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as shown
in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing necessary
slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid separately if not
specified. The bottom of the excavated area shall be 1 evened both longitudinally and transversely. as directed by
removing and watering as required. No earth filling will be allowed for bringing it to level, if mistake or any other
reason excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width shall be made
up with concrete of same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in layer
including ramming and watering etc. The balance of the excavated quantity shall be removed by the contractor from
the site of work to a place as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches shown
on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus excavation
made in excess of above requirements or due to slopping and sloping back as found necessary on account of
conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind Including spreading & levelling etc. complete.
Lead Upto 1 Km.
Lead From 1 Km to 2 Km.
Lead From 2 Km to 3 Km
Lead From 3 Km to 4 Km
Lead From 4 Km to 5 Km
Lead From 5 Km to 10 Km
Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of
anykind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of 200 meters or
as per instruction given by Engineer in charge. Useful materials obtained from clearing site and excavation shall be
stacked and used within the work site. Internal conveyance above 200 mt within the work site i.e. From starting
chainage to End chainage of a given road WILL NOT BE PAYABLE. Materials suitable for construction of
Embankment, earthen shoulder and subgrade shall be stacked at convenient places within a work site for reuse. No
extra payment will be paid to the contractor for stacking of earth within the work site and reused for the construction
of Embankment layer, sub grade and earthen shoulder purpose. Only surplus earth shall be disposed off outside the
work site as per instruction given by Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly
within a lead of 50 M. and will be allowed to be used by the contractor on payment at rates laid down in the contract
or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if there are no such rates in the
Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a particular stretch
of given road will be paid in this item as per instruction of Engineer in charge. No bulkage of disposed earth will be
considered for the payment.
The rate shall be for a unit of one cubic meter.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with
vibratory roller to achieve the desired density etc complete.
Production & Supply of WMM to site of
works Laying of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed
with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in
accordance with the requirements of these Specifications. The material shall be laid in one or more layers as necessary
to lines,grades and cross-sections shown on the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other
approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may
be upto 200 mm with the approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table
17-1. Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out
on the material delivered to site as per IS:2386 (Part-5).
Table 3-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value IS:2386 (Part-4) 40 percent (Max.)
or Aggregate Impact value
IS:2386 (Part-4) 30 percent (Max.)
2. Combined Flakiness and Elongation indices IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of
flaky stone metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal.
Elongation index is weight of elongated particles divided by total non-flaky particles. The values of flakiness index and elongation index so found
Grading Requirements
The aggregates shall conform to the grading given in Table 17-2.
Table 3-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low
limit on one sieve to the high limit on the adjacent sieve or vice versa.
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified
grade and camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be
corrected in an approved manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and
potholes shall be repaired and made good with the suitable material. The existing surface shall be scarified and re-
shaped to the required grade and camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for
controlled addition of water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete
batching plant. For small quantity of wet mix work, the Engineer may permit the mixing to be done in concrete
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The
mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-
base/base in required quantities. In no case should these be dumped in heaps directly on the area where these are to be
laid nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or
his authorized representative. For portions where mechanical means cannot be used, manual means as approved by the
Engineer shall be used. The motor grader shall be capable of spreading the material uniformly all over the surface. Its
blade shall have hydraulic control suitable for initial adjustments and maintaining the same so as to achieve the
specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is
spread withoutrutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surface is free fromsurface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by
removing or adding aggregate as may be required. The layer may be tested by depth blocks during construction. No
segregation of layer and fine particles should be allowed. The aggregates as spread should be of uniform gradation
with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly
compacted, to the full depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm,
smooth wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction
shall be done with the help of vibratory roller of minimum static weight of 80 to 100 kN or equivalent capacity roller.
The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress
gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly
over-lapping each preceding track by at least one third width until the entire surface has been rolled. Alternate trips of
the roller shall be terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges
have been firmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of
the road uniformly overlapping each of the preceding track by at least one-third width until the entire surface has been
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be
corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with
mechanical tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper
bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-
base/base course or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre
straight edge, the surface should be loosened and premixed material added or removed as required before rolling
again so as to achieve a uniform surface conforming to the desired grade and crossfall. In no case should the use of
unmixed material be permitted to make up the depressions. Rolling shall be continued till the density achieved is at
least 98 per cent of the maximum dry density for the material as determined by the method outlined in IS : 2720 (Part-
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction
equipment or any compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective
areas shall be made good to the full thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has
dried and the wearing course laid.
Surface Finish and Quality Control
of WorkSurface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 17-3.
Table 3-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness One test per 500 Cu.m. IS:2386, Part-I
and Elongation Indices
Atterberg Limits of portion One test per 200 Cu.m. IS:2720, Part-V
of aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course
is otherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be
scarified over the affected area, reshaped with added premixed material or removed and replaced with fresh premixed
material as applicable and recompacted. The area treated in the aforesaid manner shall not be less than 5 m long and
m wide. In no case shall depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all
necessary measures for the safety of traffic during construction and provide, erect and maintain such barricades,
including signs, marking, flags, lights and flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing and applying Primer Coat with cationic bitumen emulsion SS1 grade conforming to ASTM
GRADE on prepared surface of wet mix macadam including clearing of Wet mix macadam surface with air
compressor to remove all loose material other foreign material. The primer shall be sprayed uniformly at the rate of
0.70-1.0 kg/sqm. It shall be applied by a self-propelled or towed bitumen pressure sprayer, equipped
for spraying the material uniformly at a specified rate. No dilution or heating at site of SS1 bitumen emulsion
shall be permitted. (As Per Road Tender)
Labour charges for hand laying hotmix material DBM/BC on the road surface in line & level incl.
cleaning the surface with Air Compressor and if require re carting material by JCB at necessory place of work also
rolling with 8-10 Tonnes Vibratory Roller and Dust spreading on BC after rolling, rate also includes re- carting
of Hotmix material from place of Work/AMC store to Location of laying having narrow width like chawls, poles,
gamtal roads etc. complete. (As Per Road Tender)
Rolling : - Bituminous materials shall be laid and compacted in layers, which enable the specified thickness, surface
level, regularity requirements and compaction to be achieved. Compaction of Bituminous materials shall commence as
soon as possible after laying. Compaction shall be substantially completed before the temperature falls below the
minimum rolling temperatures. Rolling of longitudinal joints shall be done immediately behind the paving
operation. After this, rolling shall commence at the edges and proceed towards the center longitudinally except
that on super elevated and unidirectional cambered portions, it shall progress from the lower to the upper edge
parallel to the center line of the pavement. Rolling shall be continued until all the roller marks are removed from the
surface. All the deficiencies in the surface after laying shall be corrected by the attendants behind the paver,
before initial rolling is commenced. The initial or Break down rolling shall be done with 8-10 tones dead weight
smooth-wheeled rollers. The intermediate rolling shall be done with 8-10 tones or vibratory roller. The
finishing shall be done with 6 to 8 tones smooth wheel tandem rollers. At least two number of roller on site. Where
compaction is to be determined by density of cores, the requirements to prove the performance of rollers shall apply in
order to demonstrate that the specified Density can be achieved. In such cases the contractor shall nominate the
plant, and the method by which he intends to achieve the specified level of compaction and finish at temperatures above
the minimum specified rolling Temperature. Bituminous material shall be rolled in longitudinal directions, with the
driven rolls nearest the pavers. The roller shall first compact the materials adjacent to the joints and then work from the
lower to the upper side of the layer, overlapping on successive passes by at least one third of the width of the rear roll
or, in case of Pneumatic tyre roller, at least the nominal width of 300 mm. Roller should move at a speed of not more
than 5 km/ hr. the roller shall not be permitted to stand on pavement which have not been fully compacted and
necessary precautions shall be taken to prevent dropping of oil, Grease, Petrol or other foreign matters on the pavement
either when the roller are operating or standing. The wheels of rollers shall be kept damp with water, and the
spray system provided with the machine should be in good working condition, to prevent the mixture from
adhering to the wheel. Only sufficient moisture to prevent the adhesion should be used. Surplus water shall not
be allowed to stand on the partially compacted pavement.
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR 2021-22)
Item No. 9 : Providing and supplying of labour for necessary manual excavation, cleaning,
Shifting of Material Or any other, or for any other work as directed by Engineer In charge. The Rate includes Handcart
Labour charges - Mazdoor
Labour charges - Breaker
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge, rate includes all nece. shifting, fuel and
operating charges and stacking of useful & non-useful materials separately up to store. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and laying work) (Based on
Previously approved rate by CE sir )
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl)
bégt ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf
duhkxe&e zevtuÍex Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu
Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn
ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 r>Jm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg
ftuLx[t¾xh Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY
fhÔþk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu
LþfNtl &Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb
>hBgtl bswh fu sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle
hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk
(suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegt>btk sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo.
btk btLg ftuLx[t¾xhle gt>ebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu
<&t MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl
øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE
sJtltu Fao vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo
>lt Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb
mhfth©eyu fhuj ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 33.pdf
Download all tender documents and submit your bid