Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC AJITH BHAVAN KANDAMTHITTA PANTHA PO THIRUVANANTHAPURAM KERALA 695573 | THIRUVANANTHAPURAM | KERALA | 695573 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.9 L+₹45,160 (3.93%)Rejected-Finance | L2 | Rejected-Finance Higher Bid |
Tender Value
₹14.7 L
EMD Value
₹29,307
Closing Date
26 Aug 2020, 3:00 pmClosed
DIRECTOR CSIR-NIIST
Industrial Estate, pappanamcode, Trivandrum-695019
Annual Maintenance contract works for Air conditioners, Cold room, Refrigerators and Deep Freezers etc 2020-2021
2020_CSIR_55405_1
NIIST/ESD/ELECT AC-AMC/WKS/2020-21
Open Tender
Electrical Works
Item Rate
365 days
CSIR-NIIST, TVM
Please refer Tender Documents
9 documents required · 9 mandatory
₹0
₹29,307
9 Oct 2020
19 Aug 2020
27 Aug 2020
19 Aug 2020
26 Aug 2020
19 Aug 2020
19 Aug 2020 - 26 Aug 2020
Amount
PART-A Maintenance of Airconditioners
Four Quartely servicing and maintenance of window mounting units 1.5 Tr/2 TR capacity of various makes like, Voltas, Bluestar, Videocon, Usha etc. Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
Four Quartely servicing and maintenance of Split Air conditioners of 1.5 Tr/2 TR capacity of various makes like, Voltas, Bluestar, carrier, Videocon, Usha etc. Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
Four Quartely servicing and maintenance of Multi Split Air conditioners of 2 Tr/ 3 TR capacity of various makes like, Voltas, Bluestar, carrier, Videocon, Usha etc. Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
Four Quartely servicing and maintenance of Slim line Air conditioners of 3 TR capacity of Voltas, make . Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
Four Quartely servicing and maintenance of Ductable Split Air conditioners of various capacities as follows . Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
3 TR Carrier make.
5 TR Carrier make
5.5 TR Carrier,Blue star, Hitachi make
8.5 TR Carrier,Blue star make
Four Quartely servicing and maintenance of Packaged Air conditioners of various capacities as follows . Attend to all breakdown calls or performance related complainte. Rate should be quoted for yearly basis.
11 TR ETA/Zeco/Carriermake (Twin circuit of 5.5 TR with Horizontal AHU type)
16.6 TR ETA make (Twin circuit of 8.5 TR with Horizontal AHU type)
Four Quartely sevicing and maintenance of Cold Room 1.0/2 TR
PART-B Supply, Installation,Replacing of Spares/Works as and when required basis
Supply and installation of new sealed unit compressors for window mounting/Split/Multi split air conditioners of 1.5 TR/2TR of Reciprocating/Rotary as and when/which required
Gas (Refrigerant) charging of 1.5 TR/2TR windows mounting air conditioners of various makes after welding , system flushing with nitrogen, leak testing, evacuation including all material cost and labour charges etc. complete , as when required.
Gas (Refrigerant - R22/R32) charging of 1.5TR/2TR Split air conditioners of various makes after welding , system flushing with nitrogen, leak testing, evacuation including all material cost and labour charges etc. complete as and when required.
Gas (Refrigerent ) charging of 3TR Slim line air conditioners after welding, system flushing with nitrogen, leak testing, evacuation including all matetrial cost and labour charges etc. complete as and when required.
Shifting and Re-installation of spli/Multi split Air conditioners with in the Lab.Rooms/Camplus including Civil work if required.
Copper tubing for the above1/4'' & 1/2'' ( or which ever is suitable size to the unit ) with insulation etc complete.
Condensing Unit Stand
Fan motor Rewinding, over-hauling , bush replacement and re fixing etc. complete of window units/split Units, as and when required.
Blower Fan motor bush repalcement , servicing and re-fixing etc for split units, as and when required.
Sevicing and rectification of cordless remote controller PCBs of split Ac as and when required.
Supply , fixing & commissioning of new condensing fan motor for split AC as and when required.
Supply, fixing & commissioning of new blower fan motor for split AC as and when required.
Supply , Installation & commissioning of New condensing units with copper coil without compressor of 1.5/2TR as and when required.
Supply , Installation & commissioning of New Indoor units with copper coil without compressor of 1.5/2TR as and when required.
Supply & Installation of New condenser copper coils 1.5/2TR split units (replacing of Aluminium Coil) as and when required.
Supply and laying of closed cell nitrile rubber Insulation for existing refrigent tubes and wrapping heat resistance (white) tape on it.
Supply and fixing of spare parts for windows units and split units, as and when required.
Fan motor capacitor
Starting capacitor
Running Capacitor
Starting Relay
Thermostat
Swing motor for split Acs
Air filter Fiber
Air Filter Fiber for spli Unit
condenser fan leaf
Blower Fan
Replacement of remote control unit (cordless ) with signal receiver
Contactor for 2TR single phase compressor
Contactor for multi split A/Cs condenser fan
Temp Sensor Air
Temp Sensor coil
PART B II FOR PACKAGE/AHU UNITS
Supply and fixing of the following Genuine spare parts whenever necessary
contactor for compressor (siemens 3TF33)
contactor for blower motor (siemens 3TF31)
Overload relay for compressor (siemens 3UA52 16-25A)
Overload relay for fan motor (siemens 3UA50 6-10A)
Under Voltage & over voltage cut out and phase failure and phase reversal cut put ( Make -Minilec - S2VMR3)
Microprocesor based Controlling unit carrier /ETA makes
Temp sensor For Microprocessor
"v" Belts
Bearings for Blower mounting
Shaft for blower
Liquid line filter/drier
AHU Fan motor Rewinding , over-hauling , and Re-fixing atc complete as and when required.(5 HP, 3HP motor)
Condenser fan motor Rewinding, over-hauling, and refixing etc complete as and when required
Gas (Refrigerant ) charging of 11TR (5.5 Twin Compressors with individual Ref Circuit ) air conditioners . After welding, syystem flushing with nitrogen , leak testing , evacuation & recommissioning , including all material cost and labour charges etc. complete , as and when required.Twin system and hence rate may be quoted for 5.5 TR only .
Gas (Refrigerant ) charging of 16TR (8.3 Twin Compressors with individual Ref Circuit ) air conditioners . After welding, syystem flushing with nitrogen , leak testing , evacuation & recommissioning , including all material cost and labour charges etc. complete , as and when required.Twin system and hence rate may be quoted for 8.3 TR only .
PART - B-III For Ductable units 3,5,5.5 & 8.5 TR units
Supply and fixing of the following Genuine spare parts whenever necessary
Contacror for compressor
Single Phase Preventer with Under Voltage & Over voltage cut out, Phase failure and phase reversal cut out
Microprocesor based Controlling unit
Temp sensor For Microprocessor
Compressor for 3TR (1.5 + 1.5) unit 1.5TR Rotary Compressor
Liquid line filter / Drier
Condenser fan Leaf
V belts for IDUs
Blower Fan motor Rewinding , over hauling , and Refixing etc complete whenever required.
Condenser fan motor Rewinding, over-hauling, and refixing etc complete as and when required
Gas ( Refrigerant ) charging of 3TR air conditioners of Carrier make after welding , system flushing with nitrogen , leak testing , evacuation & recommissioning, including all material cost and labour charges etc. complete, as and when required. Twin system and hence rate may be quoted for 1.5 TR only
Gas(Refrigerant) charging of 5.5TR air conditioners of carrier/Blue star make after welding,system flushing with nitrogen, leak testing , evacuation & recommissioning , including all material cost and labour charges etc. complete, as and when required.
Gas (Refrigerant) charging of 8.5 TR/8.3TR air conditioners of variousof Carrier/Blue star after welding , system flushing with nitrogen, leak testing, evacuation including all material cost and labour charges etc. complete , as when required.
Supply and fixing of the following Air filters of following specifications
105x40 cm (5.5 Tr Carrier unit)
90x40 cm (3TR Carrier unit)
60x30.5x50 cm Box type prefilter for ZECO AHU 90% down to 10 Micron
61x61x50 cm Box type prefilter for ZECO AHU 90% down to 10 Micron
61x61x50 cm Box type prefilter for ZECO AHU 99% down to 5 Micron
60x30.5x50 cm Box type prefilter for ZECO AHU 90% down to 5 Micron
Shifting of 5TR outdoor unit (TEM ROOM) NEW location Appx 1 floor down as per the directions of engineers, including evacuation, recommissioning,including all material cost and labour charges etc
Supply & replacing of Condenser deck (Condenser mounting plate) for carrier make 3TR units
PART B IV FOR COLD ROOMS
Four Quartely servicing and maintenance of cold rooms 1.5 TR/ 2TR capacity (4 Deg C) of makes like Voltas, Carrier, L.G., Bluestar, Videcon, Usha etc. Attend to all breakdown calls or performance related complaints. Rate should be quoted for yearly basis.
Replacement of Evaporator fan motor with leafs
Replacement of Condenser fan motor with leafs
Gas (Refrigerent) charging of 1.5TR/2TR cold rooms flushing with Nitrogen , leak testing , evacuation including all material cost and labour charges etc. complete, as and when required.
PART B- V FOR REFRIDERATORS/ DEEP FREEZERS
Exchanging defective compressors with new one, installation , welding , leak testing, evacuation and gas charging, etc. complete for all models, as and when required.
Supply of outdoorluminaries used for floodlight with high power LEDS suitable for area lighting
Spare parts ( original ) supply and replacement , as and when required.
Relay
Thermostat
Capacitors
Timer for non frost refrigerator
Heater for non frost refrigerator
Fan motor with fan leaf for Frost free Refrigerator
Supply & installation of compressors of various capacity refrigerator , as and when required.
Gas charging after testing and evacuation including cost of materials and labour charges, etc. complete, as and when required.
Hevaco Cooling Systems pvt ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .