Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹4.2 Cr+₹30.3 L (7.82%)Accepted-AOC | ₹4.2 Cr+₹30.3 L (7.82%) | L2 | Accepted-AOC Lowest responsive accepted bidder |
| 2 | L1₹3.9 CrRejected-Finance | ₹3.9 Cr | L1 | Rejected-Finance Disqualified on the basis of instructions given in clause no. 4.2(d) of Evaluation and Qualification Criteria of the Bid Document |
| 3 | L3₹4.4 Cr+₹50.4 L (13.0%)Rejected-AOC | ₹4.4 Cr+₹50.4 L (13.0%) | L3 | Rejected-AOC Not L1 bidder |
| 4 | Rejected-Technical C O HOTEL VASUNDHARA PLACE KAILASH GATE MUNIKI RETI TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | - | - | Rejected-Technical non responsive as per evaluation and qualification criteria 3.1 (ii) |
Tender Value
Refer Docs
EMD Value
₹8.0 L
Closing Date
10 Oct 2019, 11:00 amClosed
Program Manager PIU Slope Bridge and Irrigation
4th Floor DDPM Tower Ajabpur Khurd Haridwar Bypass Road Dehradun
Construction of Bridge
2019_pwd_20120_1
UDRP/AF/BR/37
Open Tender
Civil Works - Bridges
Item Rate
450 days
Pauri Garhwal
The bidder has to submit the affidavit of correctness
6 documents required · 6 mandatory
₹5,900
Prog Mngr PIU Slope Bridge and Irrigation UDRP AF
₹8.0 L
Dehradun
15 Feb 2020
7 Sept 2019
10 Oct 2019
8 Sept 2019
10 Oct 2019
24 Sept 2019
9 Sept 2019 - 18 Sept 2019
18 Sept 2019
Amount
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. and as directed by ingineer in-charge. By Mechanical Means / Manual Means
Ordinary soil Depth upto 3 m
Ordinary rock (not requiring blasting)
Hard rock ( requiring prohibited )
Plain cement concrete (PCC) Grade M15 in open foundation complete as per drawing and technical specifications,as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Reinforced cement concrete (RCC) Grade M35 in open foundation complete as per drawing and technical specifications,as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth Using Concrete Mixer.
Reinforced cement concrete (RCC) M 35 in sub-structure complete as per drawing and technical specifications Using concrete Mixer Height upto 5m, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification PSC Grade M-40 Using concrete mixer and, as directed by engineer in-charge must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure for dack slab as per drawing and Technical Specification For solid slab super-structure Height upto 5m, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. (RCC Grade M35 for deck slab)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material and as directed by engineer in-charge.
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as directed by engineer.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as directed by engineer.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications and as directed by engineer.
Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel confirming IS 226 - 1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticirrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismentling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts..
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard pecifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and as directed by engineer.
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per Dimensions in the approved drawing and at locations directed by the Engineer, all as specified)
Drainage Spouts complete as per drawing and Technical specification as per direction of engineer in-charge.
Mastic Asphalt Providing and laying 65 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515 and as directed by engineer in-charge.
Reinforced cement concrete (M-30) approach slab including formwork but excluding reinforcement steel, complete as per drawing and Technical specification and must be continuous curing for at least 14 days must be done by laying Hessain cloth and as directed by engineer in-charge.
Painting on Steel Surfaces Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade and as directed by engineer in-charge.
Erection of Steel Truss (Girder) Bridge (up to 60m span) as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipments, civil work and consumables, cost of arranging, fabricating, errecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor's designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of mansoon and as per directions of the engineer-in-charge.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications and as directed by engineer in-charge.
Bore Hole for Soil Investigation - Carrying out confirmatory bores up to required depths complete in all respects as per MORTH Technical Specifications 2400 and as directed by Engineer-in- Charge.
Depth between 0 m to 10 m
Depth between 10 m to 20 m
Supplying, fitting and fixing in position true to line and level POT- PTFE bearing tonne consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications and as directed by engineer in- charge
Free POT cum PTFE
Guided (L) pot cum PTFE
Guided (T) pot cum PTFE
Fixed pot bearing
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)
Supply and fixing of 20mm dia P.F. make 10.90 grade HSFG High Strength Friction Grip bolt to IS 3757:1985 latest to grade 10.9S with high strength friction grip nut to IS 6623:2004 latest to grade 10S and high strength friction 2 No. washer including cost of all material, labour, fixing at site, all taxes, T&P etc required foe proper completion of the work.(20x100mm) and as directed by engineer in- charge.
Approach Road
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means In all area including thorny jungle
Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting (With out Dozer) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m at safe place as per direction of ingineer in-charge and as per Clause 1603.2.
Excavation in Hilly Areas in Hard Rock requiring blasting Excavation in hilly areas in hard rock requiring blasting, by mechanical means without using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m at safe place as per direction of ingineer in-charge and as per Clause 1603.2.
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 and as directed by engineer.
WBM work
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 and as directed by engineer. By Mechanical Means
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniformt hickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. and as directed by engineer.
Bituminous work
Prime coat (Medium porosity) Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical pecification Clause 502 and as directed by engineer.
Tack coat Tack coat using VG-10 grade bitumen Over granular surfaces treated with primer @ 0.40 kg/sqm and as directed by engineer.
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508 and as directed by engineer.
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 using Bitumen (VG-10) and as directed by engineer.
Safety work
Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( if Concrete Required for Vertical post Fixing will be paid extra) an as directed by enginer.
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction and as directed by engineer in-charge.
Providing plain cement concrete M-10 (Nominal mix 1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the ull width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
R.R. stone masonry laid in 1:5 cement and sand mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Pointing with cement mortar (1:3) on brick/stone work as per drawing and technical specification Clauses 613.3 and 1204, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Side Drain Work
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction and as directed by engineer in-charge.
Providing plain cement concrete M-10 (Nominal mix 1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Providing plain cement concrete M-15 (Nominal mix 1:2.5:5) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Providing and Fixing 'Logo' of UDRP_AF Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
Protection Work
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction and as directed by engineer incharge.
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions)
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth.
Environmental Monitoring Cost
Pre-Construction
Ambient Air Quality Monitoring
Surface Water Quality
Noise Quality
Soil Quality
During construction
Ambient Air Quality Monitoring
Surface Water Quality
Noise Quality
Soil Quality
Environmental Management Plan Implementation Training site
Water sprinkling by water tanker to minimize the dust pollution during construction activities. It has been considered for at least 2 hours/day for 120 days
ARKS UNIVERSAL PRIVATE LIMITED
VIJAY DHYANI
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .