Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance VILL NAYAPARA P O P S KAKDWIP DIST SOUTH 24 PARGANAS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | L1 | Admitted-Finance | ||
| 2 | L2₹9.9 L+₹42,073 (4.42%)Admitted-Finance VILL P O P S KAKDWIP HOSPITAL ROAD DIST SOUTH 24 PARGANAS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | L2 | Admitted-Finance | ||
| 3 | L3₹10.0 L+₹46,920 (4.93%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹10.0 L+₹47,211 (4.96%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,389
Closing Date
5 Jun 2026, 1:00 pmClosed
EXECUTIVE ENGINEER PWD DH DIVN
O/O THE EE PWD DIAMOND HARBOUR SOUTH 24 PGS
Emergent Repair to Saptamukhi Setu to Bhagbatpur via patharpratima bazar road from 1.00 kmp to 2.10kmp, 4.70kmp to 5.70kmp, 7.00kmp to 8.50 kmp and 12.50kmp to 14.00kmp in stretches under Diamond Harbour Division , P.W.D., during the year 2025-26.
2026_WBPWD_5014397_4
PWDEEDHDe.NIT NO.-01_2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
KAKDWIP
Please refer Tender documents.
5 documents required · 5 mandatory
₹19,389
Yes
22 Jun 2026
22 May 2026
8 Jun 2026
22 May 2026
5 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tack coat. [Tack coat is to be considered separately]i) With premixed Chips or Bajrees with 54 kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work)(b) Using Mobile HMP (Light duty) | 1 | Cum | 1 | ₹1 |
| 2 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) (RS1) | - | Sqm | - | - |
| 3 | Mending Potholes and depressions by stitching picked jhama bricks with one brick-on-edge laid in herring bone pattern and including necessary cushion of sand below the soling (and in between layers) including cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, finishing the surface to match with
adjacent areas complete as per direction.
b) One brick-on-edge laid in herring bond pattern (thickness 125 mm) | - | Sqm | - | - |
| 4 | GST (Sl-01 to Sl-03) | - | % | - | - |
| 5 | CESS (SL-01 to Sl-04) | - | % | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_5082484.xls
BOQ • 0.24 MB
2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .