Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | L1 | Accepted-AOC Low rate | |
| 2 | L2₹28.1 L+₹16.3 L (139.0%)Rejected-AOC ROPAR CANALS AND GROUND WATER MODEL JAL SAROT VIBHAG PUNJAB ROPAR | L2 | Rejected-AOC High rate |
Tender Value
₹10.3 L
EMD Value
₹20,694
Closing Date
5 Nov 2024, 12:00 pmClosed
Executive Engineer
Ropar Canal and GWD Water Resources Department Pb.
Estimate for construction of approaches of bridge at RD 61573 of Talwandi Distributary
2024_WR_128842_1
40/22A/2024-25
Open Tender
Civil Works
Item Rate
60 days
vill raikot near ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹20,694
Yes
26 Apr 2025
21 Oct 2024
5 Nov 2024
21 Oct 2024
5 Nov 2024
21 Oct 2024
Amount
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (a) Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km (Katcha)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km (pucca)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km (Katcha)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km (pucca)
Compaction Extra for laying earth/fly/ash as per specifications in 20 cm layers and dressing but excluding cost of rolling.
Extra for watering the earth/fly ash laid in 20cm layers as per specifications for compaction.
Extra for rolling to specifications.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications.(PCC M30 using batching plant, transit mixer and concrete pump
Water Bound Macadam Grading I (without screening for low volume Roads/undersigned Providing, laying, spreading and compacting stone aggregates of Grading I towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheeled roller 8-10 tonnes in stages to proper grade and camber,applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the requireddensity complete as per technical specifications
Water Bound Macadam Grading II Providing, laying, spreading and compacting stone aggregates of Grading II towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheeled roller 8-10 tonnes in stages to proper grade and camber,applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarseaggregate, watering andcompacting to the required density complete as per technical clause 404 of MORT&H specifications
Any Other Items
DEEP ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .