Tender Value
₹76.8 Cr
EMD Value
₹86.8 L
Closing Date
21 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CHAPRA
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER, ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, CHAPRA
SUPERINTENDING ENGINEER, SARAN ROAD CIRCLE HAJIPUR
SE
Widening and Strengthening work of NH-19 Left out Portion of Chapra Section(Length-13.40 Km.)under Road Division, Chapra for the Year 2024-25
131309
NIT No-01/2026-27/RCD/CHAPRA/RE-E-TENDER
Open Tender
CIVIL
Saran
• Legal Status of Bidder.
• Place of Registration.
• Principal place of Business
• Total value of civil engineering construction work performed in FY- 2021-22 : Amount to be enterd
• Total value of civil engineering construction work performed in FY- 2022-23 : Amount to be enterd
• Total value of civil engineering construction work performed in FY- 2023-24 : Amount to be enterd
• Total value of civil engineering construction work performed in FY- 2024-25 : Amount to be enterd
• Total value of civil engineering construction work performed in FY- 2025-26 : Amount to be enterd
• Work Experience of Similar nature : Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs)
• Minimum Quantities of work done as prime contractor in any one year during last five years: ? Non Bituminous Sub ?bases and Bases(GSB/WMM) - 7901.763 M3
Value to be enterd.
• Minimum Quantities of work done as prime contractor in any one year during last five years: ? Earthwork in both excavation and embankement combined Quantity . 31153.0747 M3 : Value to be enterd.
• Minimum Quantities of work done as prime contractor in any one year during last five years: ? Concrete works (Including RCC and PSC ) : 2757.367 M3 : Value to be enterd.
• Minimum Quantities of work done as prime contractor in any one year during last five years: ? Bituminous Treatment (BM, DBM, BC, SDBC) ?6825.1007M3
Value to be enterd.
• Bidding Capacity:More than the total Bid value of present work = A*N*3-B=Rs. Where A = Maxm. Value of civil Engineering work executed in any one yr during last 5 yrs.(Updated to the priceleavel of the year indicated in Appendix)Taking into account the completed as well works in progress. N= Nos of years for completion of works for which bids are invited.. B=Value(updated to the price of the year indicated in Appendix) of existing commitments & ongoing works to be completed during the next (period of completion of the works for which bids are invited ) : Amount to be entered
• Existing commitments and ongoing works : Amount to be entered
• Work for which Bid already submitted : Amount to be entered
• Availability of key items of Contractor's Equipment : Motor Grader - 5 : Nos to be entered
• Availability of key items of Contractor's Equipment : Dozer - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Front end Loader - 3 : Nos to be entered
• Availability of key items of Contractor's Equipment : Smooth Wheeled Roller - 3 : Nos to be entered
• Availability of key items of Contractor's Equipment : Vibratory Roller - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Fully Computerized Hot Mix Plant (Mim. 100-120 TPH Capacity) with Electronic Controls. - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Paver Finisher with Electronic Sensor - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Water Tanker - 4 : Nos to be entered
• Availability of key items of Contractor's Equipment : Bitumen Sprayer - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Tandem Roller - 2 : Nos to be entered
• Availability of key items of Contractor's Equipment : Concrete Mixer with Integral Weigh Batching Facility - 1 : Nos to be entered
• Availability of key items of Contractor's Equipment : Concrite Batching and mixing plan (Minimum Capacity 15m3/hour)- 1 : Nos to be entered
• Availability of key items of Contractor's Equipment : WMM Plant - 1 : Nos to be entered
• Availability of key items of Contractor's Equipment : Paver Finisher for laying WMM Material - 1 : Nos to be entered
• Key Personnel - Project Manager/ B.E. Civil + 10 Years Experience (5 years as Manager) or Retired EE : 1 Nos
• Key Personnel - Site Engineer / B.E. Civil + 7 Years Experience (3 years in Road Construction o) or Retaired A.E - 4 Nos
• Key Personnel - Plant Engineer / B.E. Mech/Civil + 5 Years Experience or Diploma in Mechanical + 7 Years Experience or retaired J.E - 2 Nos
• Key Personnel - Quantity Surveyor / B.E. Civil. + 5 Years Experience or Diploma in Civil + 7 Years Experience - 2 Nos
• Key Personnel - Soil & Material Engineer / B.E., Civil + 7 Years Experience - 2 Nos
• Key Personnel - Survey Engineer/B.E. Civil + 03 Years Exp. or Dip. Civil + 05 Years Exp- 2 Nos
• Key Personnel - Site supervisor (Fresh graduate in Civil or Diploma Civil +03 Years Exp. Or retired I.T.I Holder - 4 Nos
• Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs).
• I.T. & G.S.T. Registration & clearance Certificate :
• Proposed methodology and programme of construction :
• Time of Completion :
• NOC for Debar (If required):
CIVIL
PERCENTAGE
L1
1
21 documents required · 21 mandatory
₹10,000
Processing Fee: 5900
₹86.8 L
Office of Chief Engineer North, Road Construction Department, Bihar, Patna
11 May 2026
11 May 2026
21 May 2026
12 May 2026
21 May 2026
12 May 2026
15 May 2026
Widening and Strengthening work of NH-19 Left out Portion of Chapra Section(Length-13.40 Km.)under Road Division, Chapra for the Year 2024-25
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT of NH19 RE E TENDER 2026.pdf
NIT • 2.35 MB
SBD NH 19.doc
NIT • 0.66 MB
TECHNICAL SHEET for 26-27.pdf
NIT • 0.25 MB
BOQ NH-19 Final.pdf
NIT • 1.21 MB
7930 E 26.11.25.pdf
NIT • 0.45 MB
BOQ NH-19 Final.pdf
NIT • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .