Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-Finance | ₹18.0 L | 1 | Accepted-Finance 1st lowest |
| 2 | 2₹18.7 L+₹68,491 (3.80%)Accepted-Finance | ₹18.7 L+₹68,491 (3.80%) | 2 | Accepted-Finance 2nd lowest |
| 3 | 3₹19.2 L+₹1.2 L (6.62%)Accepted-Finance | ₹19.2 L+₹1.2 L (6.62%) | 3 | Accepted-Finance 3rd lowest |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-incomplete paper submitted |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Physically document not submitted |
| Sl No | Description | Qty | Unit | VAISHANVI CONSTRUTION/ KOMAL SINGH L2 | SUMIT LOHNI L1 | Ramesh Chandra Kandpal L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.Rubble Stone Masonry in Cement Mortar | 132 | CUM | 352 ₹46,464 | 312 ₹41,184 | 286 ₹37,752 Lowest |
| 2.00 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth | 316 | CUM | 341 ₹1,07,756 | 303 ₹95,748 | 277 ₹87,532 Lowest |
| 3.00 | Stone masonry in cement mortar in foundation complete as per drawing & technical specification Clauses 702, 704, 1202 and 1203 Random rubble masonry In 1:4 cement mortar | 441 | CUM | 3,590 ₹15,83,190 | 3,497 ₹15,42,177 Lowest | 3,820 ₹16,84,620 |
| 4.00 | Pointing with cement mortar (1:3) on stone masonry | 1,758 | SQM | 68 ₹1,19,544 | 63 ₹1,10,754 | 57 ₹1,00,206 Lowest |
| 5.00 | Suppy & fixing of M.S tashes of required size/avg. size including all cost of material, labour,cutting,welding & T&P etc | 100 | KG. | 119 ₹11,900 | 105 ₹10,500 | 95 ₹9,500 Lowest |
Tender Value
₹24.4 L
EMD Value
₹63,000
Closing Date
27 Aug 2025, 5:00 pmClosed
Executive Engineer
Irrigation Division Ramnagar
Project of renovation various gules of Chilkiya canal under NABARD at Ramnagar Block, Distt Nainital Kulava No 11,13,14
2025_IRDCE_85761_1
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
270 days
ramnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer Irrigation Division Ramnagar
₹63,000
3 Sept 2025
11 Aug 2025
28 Aug 2025
11 Aug 2025
27 Aug 2025
11 Aug 2025
Amount
Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.Rubble Stone Masonry in Cement Mortar
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth
Stone masonry in cement mortar in foundation complete as per drawing & technical specification Clauses 702, 704, 1202 and 1203 Random rubble masonry In 1:4 cement mortar
Pointing with cement mortar (1:3) on stone masonry
Suppy & fixing of M.S tashes of required size/avg. size including all cost of material, labour,cutting,welding & T&P etc
VAISHANVI CONSTRUTION/ KOMAL SINGH (BID ID -394391)
Ramesh Chandra Kandpal (BID ID -394482)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .