| 1 | 1₹34.5 LAccepted-AOC | ₹34.5 L Quoted ₹35.2 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹36.8 L+₹1.6 L (4.57%)Rejected-AOC 344 GEHRI BUTTER GEHRI BUTTER GEHRI BUTTER BATHINDA PUNJAB 151401 | BATHINDA | PUNJAB | 151401 | ₹36.8 L+₹1.6 L (4.57%) | 2 | Rejected-AOC L-2 |
| Sl No | Description | Qty | Unit | MANJOT ENTERPRISES COMPANY L2 | KIARA ENERGY PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 279 | Cum | 200 ₹55,800 | 191 ₹53,289 Lowest |
| 2.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 127.7 | Cum | 6,200 ₹7,91,740 | 6,139 ₹7,83,950.3 Lowest |
| 3.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 354.95 | Sqm | 200 ₹70,990 | 173 ₹61,406.35 Lowest |
| 4.00 | 10mm thick cement plaster 1:4 on bed and top. | 97.13 | Sqm | 150 ₹14,569.5 | 133 ₹12,918.29 Lowest |
| 5.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 2.43 | Cum | 9,200 ₹22,356 | 9,155 ₹22,246.65 Lowest |
| 6.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 33.21 | Cum | 5,400 ₹1,79,334 | 5,380 ₹1,78,669.8 Lowest |
| 7.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 40.01 | Cum | 4,300 ₹1,72,043 | 4,255 ₹1,70,242.55 Lowest |
| 8.00 | Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 6,506.82 | Meter | 175 ₹11,38,693.5 | 167 ₹10,86,638.94 Lowest |
| 9.00 | Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) | 40 | Meter | 75 ₹3,000 | 70.52 ₹2,820.8 Lowest |
| 10.00 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank | 0.8 | Qtl | 12,000 ₹9,600 | 10,850 ₹8,680 Lowest |
Tender Value
₹32.6 L
EMD Value
₹65,278
Closing Date
17 Apr 2026, 3:00 pmClosed
Executive Engineer, BML Division Patiala
XEN, BML Division Jail Road Patiala
Laying U/G pipeline O/L RD 47760/R of Kheri Minor excluding supply of pipes.
2025_WR_137718_65
61/24-25
Open Tender
Civil Works - Canal
Item Rate
90 days
Ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹65,278
25 Apr 2026
11 Apr 2026
18 Apr 2026
11 Apr 2026
17 Apr 2026
11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 279 | Cum | - | - |
| 2 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 127.7 | Cum | - | - |
| 3 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 354.95 | Sqm | - | - |
| 4 | 10mm thick cement plaster 1:4 on bed and top. | 97.13 | Sqm | - | - |
| 5 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 2.43 | Cum | - | - |
| 6 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 33.21 | Cum | - | - |
| 7 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 40.01 | Cum | - | - |
| 8 | Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 6,506.82 | Meter | - | - |
| 9 | Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) | 40 | Meter | - | - |
| 10 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank | 0.8 | Qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_336684.xls
BOQ • 1.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .