Loading…
Loading…
Tender Value
₹6.4 Cr
EMD Value
₹6.4 L
Closing Date
28 May 2026, 6:00 pmClosed
Superintending Engineer, PIU, Zone-6, Vadodara.
Upgradation of Existing OT (11 Nos) in MOT and New Modular Operation Theater (02 Nos.) in Various Buildings at SSG hospital, Vadodara. (Reinvited)
307099
2026-27/07/01
Open
Civil Works - Buildings
Works
Vadodara
1 document required · 1 mandatory
₹12,000
PIU-General Fund A/c 11-114
₹6.4 L
20 May 2026
20 May 2026
20 May 2026
28 May 2026
20 May 2026
Name of Work :- Upgradation of Existing OT (11 Nos) in MOT and New Modular Operation Theater (02 Nos.) in Various Buildings at
SSG hospital, Vadodara.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No In Figures Estimates
Rs.Ps. Qunatities Rs.Ps.
SS Modular OT Sandwich Wall Panel Specification (Double Skin SS 0.8 mm + Core)
A. Construction
Panel type: Factory-made sandwich wall panel, double skin stainless steel.
Face sheets (both sides):
Stainless Steel 0.8 mm thick each side (inside and outside).
Recommended grade: AISI 304, finish 2B / satin (hairline optional only if client accepts).
SS sheet to be plain, scratch-free, without dents, waviness, oil canning.
1 941.91 Core material (choose as per project requirement): 11,000.00 Sq Mtrs.
Spech. ElevenThousand Only
PIR / PUF: density 40 ± 2 kg/m³ (typical) for insulation, light weight.
Rockwool: density 80–100 kg/m³ for superior fire performance and acoustic.
Core to be uniform, void-free, non-sagging.
B. Panel Thickness
Overall thickness: commonly 50 mm - 60 mm (final as per OT HVAC heat load and design).
Thickness tolerance: ±1 mm (typical).
C. Bonding and Integrity
SS skins bonded to core using
OT Sandwich industrial
Ceiling grade adhesive
Panel Specification / hot-press
(Double Skin SSlamination.
A. Construction
Panel type: Factory-made sandwich wall panel, double skin stainless steel.
Face sheets (both sides):
Stainless Steel 0.8 mm thick each side (inside and outside).
Recommended grade: AISI 304, finish 2B / satin (hairline optional only if client accepts).
SS sheet to be plain, scratch-free, without dents, waviness, oil canning.
Addi. Rupees TenThousand
2 606.25 Core material (choose as per project requirement): 10,000.00 Sq Mtrs.
PIR / PUF: density 40 ± 2 kg/m³ (typical) for insulation, light weight.
Rockwool: density 80–100 kg/m³ for superior fire performance and acoustic.
Core to be uniform, void-free, non-sagging.
B. Panel Thickness
Overall thickness: commonly 40 mm - 50 mm (final as per OT HVAC heat load and design).
Thickness tolerance: ±1 mm (typical).
C. Bonding and Integrity
SS skins bonded to core using industrial grade adhesive / hot-press lamination.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling filtration system in Estimates
the surgical theatre should ensure a unidirectional distribution of sterile air, covering all areas affected by the Qunatities Rs.Ps.
airflow. It should consist of a laminar flow system incorporated within a frame made from thick extruded
aluminum profiles, complete with a sealed gasket to prevent leaks. The system should incorporate "H 14"
class HEPA filters positioned in the ceiling plenum. These filters should achieve an MPPS average efficiency
greater than 99.95% and a 3-micron DOP efficiency greater than 99.99%. The filters should also be designed
to handle a final pressure drop of no more than 600 Pa, operate at a maximum temperature of 60 degrees
Celsius, and function effectively within a relative humidity range of 40-50%. The filtration ceiling system
should be capable of maintaining a constant airflow velocity of 0.25 m/s at the diffuser. This should be
accomplished through the use of a diffuser or flow equalizer that ensures uniform and constant air
distribution over the entire surface area. The structure holding the filtration system, including the filter
Addi. Rupees Three Lakh
3 13.00 frames and top plenum, should be made from either aluminum or stainless steel. The system should be CE/UL 3,90,000.00 Nos.
Spech. Ninety Thousand Only
certified and designed to achieve an ISO 14644/1 classification of ISO 5, with a bacteriological class of B (5
CFU/m3) and particle decontamination kinetics CP of 5 minutes. After installation, the system's performance
should be validated by a third-party government-approved environmental lab to ensure compliance with
specified standards. A positive pressure should be maintained inside the operating theatre to prevent
contamination from external air sources. The supplier should provide test certificates for the HEPA filters and
the laminar airflow systems from the original manufacturers. Furthermore, the size of the laminar airflow
system should be a minimum of 8 feet by 8 feet. Finally, the entire system should meet CE/BIS certification
standards, ensuring it adheres to both European and Indian safety and performance regulations and including
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No The flooring within the surgical theatre should consist of a minimum of 2mm thick antistatic seamless PVC, Estimates
ensuring durability and safety. This floor should be smooth, non-slip, and made from an impervious material Qunatities Rs.Ps.
with sufficient conductivity to dissipate static electricity effectively, yet not so conductive as to risk electric
shock to personnel. The PVC used should be of very high quality, particularly designed for electrostatic charge
dissipation, and should not be less than 2 mm in thickness. The installation process should utilize continuous
rolls, and joints should be seamlessly welded using special PVC thermal welding units with welding bars of the
same color to ensure uniformity and prevent contamination. The sheets should be highly durable, capable of
resisting shocks, indentations, and scratches. The conductive material should be uniformly impregnated
within the PVC as grains to enhance its antistatic properties. Additionally, the flooring should be inert to body
fluids, chemicals, and disinfectants, and remain unaffected by temperature variations typical within an
operating theatre. It should efficiently discharge electric charges up to 2 kV, and the electrical resistance
(point to ground) should be maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no buildup of electrical
charge beyond 100 volts. Floor installation should be performed by skilled workers from accredited agencies
Addi. Rupees Four Thousand
4 635.50 authorized by the PVC sheet supplier. The installation should include a conductive copper grid beneath the 4,250.00 Sq Mtrs.
Spech. Two Hundred Fifty Only
PVC sheet, supported by liquid epoxy compounds to create a uniform and level surface. Copper strips should
be made visible by grinding and not project more than 0.5mm above the floor level to prevent damage to the
PVC sheet, with one earthing lead brought out from every 150 sq.ft area and attached to the main earthing
strip/ground. The flooring should also be mechanically shockproof, scratchproof, flame retardant, and
antimicrobial. Corners of the flooring should be uniformly curved, and a concealed cove-former (aluminium)
should overlap the wall panel to a height of approximately 25mm and be sealed perfectly and uniformly.
Before laying the PVC, suitable self-leveling compounds should be used to prevent any undulations within the
operating theatre. The final surface should be non-corrosive to biological fluids and detergents, with a color
that is uniform, pleasant, and matching with the ambience as approved by the respective consignee.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No The door to the surgical theatre should be a hermetically sealed, single sliding door measuring 2.1 meters in Estimates
height and 1.5 meters in width. The door should be equipped with a controller capable of being operated by Qunatities Rs.Ps.
elbow switches, foot switches, and a touchless sensor, providing multiple, accessible control options. The
track for the door should be made from stainless steel or aluminum, with the running surface for the top
rollers angled appropriately to minimize resistance and facilitate smoother movement. The door leaf should
be suspended using high-quality hard plastic rollers with double bearings at the top. These rollers should run
under the stainless steel or aluminum track to ensure smooth and noiseless operation. The opening and
closing mechanisms of the door should be controlled by a microprocessor for precise electromechanical
movement. The material of the door should be either SMS or HPL, with a color that matches the interior
design. The door should be designed to be strong yet lightweight for ease of use. In case the automatic
mechanism fails, the door should still be able to open and close effortlessly manually. The handle of the door
should be made from stainless steel with a matte finish and equipped with a high-quality cylindrical or ESPg
lock for security. The door leaf should incorporate a high-quality synthetic rubber gasket with long durability Rupees Two Lakh
13.00 to ensure hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor on 2,95,000.00 Ninety Five Thousand Nos.
either side of the door should be perfectly level, with a maximum permissible difference of +1mm, to avoid
any tripping hazards or unsealed gaps. The overall thickness of the finished door should range from 30-
60mm, with the inner part of the door filled with CFC-free polyurethane foam, approximately 48mm thick,
sealed airtight to block any microbial ingress. The door and its controls should comply with IEE regulations,
utilizing DC brushless or PMDC motors that are effectively isolated from mains power to ensure safety and
reliability. Additionally, the door should include a vision window measuring 300mm x 300mm, featuring
double-glazed panels that are hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked,
BIS certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for
the hermetically sealed door frame should be included in the pre-dispatch documents to verify compliance
with the specified standards and functionality.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No The door to the surgical theatre should be a hermetically sealed, single sliding door measuring minimu 2.1 Estimates
meters in height and 1.0 meters in width. The door should be equipped with a controller capable of being Qunatities Rs.Ps.
operated by elbow switches, foot switches, and a touchless sensor, providing multiple, accessible control
options. The track for the door should be made from stainless steel or aluminum, with the running surface for
the top rollers angled appropriately to minimize resistance and facilitate smoother movement. The door leaf
should be suspended using high-quality hard plastic rollers with double bearings at the top. These rollers
should run under the stainless steel or aluminum track to ensure smooth and noiseless operation. The
opening and closing mechanisms of the door should be controlled by a microprocessor for precise
electromechanical movement. The material of the door should be either SMS or HPL, with a color that
matches the interior design. The door should be designed to be strong yet lightweight for ease of use. In case
the automatic mechanism fails, the door should still be able to open and close effortlessly manually. The
handle of the door should be made from stainless steel with a matte finish and equipped with a high-quality
cylindrical or ESPg lock for security. The door leaf should incorporate a high-quality synthetic rubber gasket
Addi. with long durability to ensure hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of Rupees Two Lakh
Spech. Fifteen Thousand Only
75Pa. The floor on either side of the door should be perfectly level, with a maximum permissible difference of
+1mm, to avoid any tripping hazards or unsealed gaps. The overall thickness of the finished door should
range from 30-60mm, with the inner part of the door filled with CFC-free polyurethane foam, approximately
48mm thick, sealed airtight to block any microbial ingress. The door and its controls should comply with IEE
regulations, utilizing DC brushless or PMDC motors that are effectively isolated from mains power to ensure
safety and reliability. Additionally, the door should include a vision window measuring 300mm x 300mm,
featuring double-glazed panels that are hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked,
BIS certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for
the hermetically sealed door frame should be included in the pre-dispatch documents to verify compliance
with the specified standards and functionality.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and Communication Estimates
Controller - The Operation Switch and Comms Controller should encompass all necessary controls to ensure Qunatities Rs.Ps.
the proper operation and monitoring of equipment and services in the operating room (OR). Positioned for
optimal visibility in the surgeon's line of sight and the OT staff, the wall-mounted membrane-buttons should
be easily accessible to the nurse for operation and assistance. In addition to hosting a digital clock and
elapsed time indicator, the panel should feature a medical gas alarm, clearly indicating high and low gas
pressures for each gas service, including vacuum, supported by an audible alarm. The Operation Switch and
Comms Controller should also provide an alarm mute option for fault annunciation, with pressure sensors
strategically located near isolation valves. Controls for general lighting, including ON/OFF and dimming, Rupees One Lakh
13.00 organized in groups for uniform illumination, should be present. Furthermore, the panel should facilitate 1,95,000.00 Ninety Five Thousand Nos.
control over operating lights (major and satellite) and camera functions (on/off and intensity). A hands-free Only
telephone set with memory should be conveniently situated, and temperature and humidity controls for the
room, linked to the AHU (+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control Valve (whichever
is applicable), should be adjustable from the Operation Switch and Comms Controller. Real-time indicators,
such as a digital room pressure indicator and HEPA filter bank differential pressure indicator, are essential for
monitoring and maintaining a safe and controlled environment in the operating room. Telephone with Alpha-
numeric keyboard is required with Speed-dialing option
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient removal of waste
materials to the dirty linen area or adjacent corridor. Each hatch box should be equipped with two doors,
operated electrically or motorized, designed such that only one door can be opened at a time to prevent
Addi. cross-contamination. UV lighting should be installed to ensure sterilization and should remain on when both Rupees One Lakh
Spech. doors are closed, automatically turning off when either door is opened. Indicators should be provided on Fifteen Thousand Only
both sides of the operating theater to monitor the door open/close status. The material of the hatch box
should also be SS304 grade stainless steel, with a minimum size of 600mm x 600mm.
In each operating theater, an operating list board should be installed. It should be made of ceramic with
magnetic properties and should be flush with the wall to maintain cleanliness and ease of use. LED type flat
panel X-ray viewing panels should be provided, complying with relevant electrical safety codes, and mounted
flush with the wall to prevent dust accumulation and microbial growth. The body should be made of extruded Rupees TwentyEight
13.00 aluminum, powder-coated with a bacteria-resistant and disinfectant-resistant finish. The diffuser on the front 28,500.00 Thousand Five Nos.
panel should provide a uniformly lit screen, and dimming controls should be easily accessible. Additionally, a Hundred Only
proper spring-loaded film clip with rollers should be included to securely hold and easily remove films without
causing scratches.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No LED type flat panel X-ray viewing panel should be supplied. This should comply with relevant electrical safely Estimates
codes. This should be a 2-panel viewing screen. Mounting should be flush with the wall to avoid dust Qunatities Rs.Ps.
more Rupees FourtyOne
accumulation and growth or organisms between wall and panel. Body should be of extruded aluminium
14.00 powder coated black with bacteria resistant and disinfectant resistant finish. The diffuser on the front panel 41,500.00 Thousand Five Nos.
should be a uniformly lit screen. Dimming electronic control should be enclosed at the bottom of the cabinet. Hundred Only
Proper spring-loaded film clip with rollers should be provided to hold the films firmly and to remove the film
without scratches
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station should be
compact, designed for use in the OT complex, and facilitate pre-procedural scrubbing. It should be made from
heavy gauge type 304 stainless steel with a minimum thickness of 1.5mm and feature seamless welded
construction polished to a satin finish. The scrub sink should have a front access panel for easy maintenance
Rupees One Lakh
Addi. of water control valves, waste connections, stoppers, and strainers. Hands-free operation should be enabled
through infrared sensors with programmable adjustments. Thermostatic mixing valve control should maintain
1,26,000.00 Twenty Six Thousand Nos.
constant water temperature and be located behind the access panel. Timing should be adjustable to meet Only
individual usage requirements, and units should have reduced anti-splash fronts. An additional knee/foot-
operated switch should also be provided for enhanced functionality.
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be constructed with
same material, as wall and ceiling panels. The shelves, made of glass and, should be removable for cleaning.
Addi. The unit should be divided into two or more parts, each with individual glass doors equipped with a high- Rupees EightyFive
Spech. quality locking system. The overall size of the storage unit should Thousand Only
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the operational
environment of each operating theatre, peripheral lighting and clean room luminaries should be installed,
with a minimum of eight units per theatre. These lights should offer an intensity of at least 500 Lux and be
housed in highly specular anodized aluminum with an optical antiglare system to minimize visual fatigue and
glare. Each peripheral light should measure 2' x 1'. The covers for these luminaries should be constructed
from highly resistant, disinfectant-proof laminated safety glass or acrylic, featuring a stylish, fine-grained
surface that complements the clean and sterile environment of the operating theatre. The body of the
luminaries should be made from sheet steel, perfectly powder-coated to resist contamination and facilitate
easy cleaning, and should be ready for connection either as individual units or within a series circuit. This
Addi. Rupees Twelve
12 140.00 setup should include digital electronic control gear utilizing multilamp technology to optimize energy 12,000.00 Nos.
Spech. Thousand Only
efficiency and light output. The installation of these luminaries should ensure that the recess frames are gas
tight. Each fitting should be flush with the ceiling and designed to be removable from either the top or
bottom for ease of maintenance. It is crucial that the light fittings are uniformly and aesthetically distributed
across the ceiling to provide consistent illumination throughout the OT, without interfering with visibility
during procedures such as green mode endoscopy. Furthermore, the peripheral lighting system should
conform to IP65 or IP54 international protection ratings, ensuring that the fixtures are dust tight and
protected against water ingress, suitable for the demanding conditions of an operating theatre.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each Estimates
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire Qunatities Rs.Ps.
Resistance Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels
should be provided by the general electrical contractor, and all distribution services within the departments
should run from these panels. The power distribution unit should hold certifications such as EN, CE, FDA, IEC,
and BIS to ensure compliance with international safety and performance standards. Each wall of the MOT
should have a minimum of two hybrid switch sockets (6/16A) on each wall, in compliance with IEC standards.
Light fittings within the clinical areas should be recessed LED types equipped with control gear and sealed in
accordance with the IP54 standard. This standard ensures that the fittings are protected against limited dust
ingress and water spray from all directions, suitable for clinical environments. All equipment should be fully
and permanently labeled to clearly identify and describe the function, operation, and voltage of the Rupees Two Lakh
13.00 apparatus concerned. Upon completion of the electrical installation, tests should be carried out in accordance 2,99,000.00 Ninety Nine Thousand Job
with the relevant sections of local wiring regulations, with results duly recorded. Each OT should have a Only
distribution board (DBs) installed, with suitable wiring. A separate enclosure should house all high-voltage
equipment to ensure safety and isolation. The remote cabinet should contain operating lamp transformers,
mains failure relays, UPS, electrical distribution equipment, and circuit protection equipment for all circuits
within the operating theatre. All internal wiring within the DBs should terminate in connectors equipped with
screws and clamp springs. Connections should be of the clip-on type mounted on a rail approved by
CE/IEC/BIS standards and labeled with indelible proprietary labels. All internal circuits should be protected by
individual fuses or miniature circuit breakers to ensure safety and manage potential electrical faults
AIR HENDALING UNIT Make:KrVelocity: Not More Then 10 mt/second. , Canvass Connection-Heavy duty, non
partical shreding,Fire Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically Balanced Selection
of fan-Should run comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB
Type:TEFC, IP:55, Foot Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked
Rupees Twelve Lakh
Addi. with AHU Motor door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm plain G.I
Outer const.:0.8 mm G.I. Pre coated / Powder coated Thickness of Insulation: 25mm,PUF injected having
12,25,000.00 Twenty Five Thousand Job
density 40 to 42 kg/m3. ,Colour:As approved by CLIENT CONDENSING UNIT : Only
Condensing unit for AHU with all assesories and instalation (Copper pipe provide 3 mtr Only Extra will
charged extra) consider 1200 sqfeet insulation and ducting M
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and Estimates
enclosed technical specifications, having Mobile App Connectivity, Battery Backup Qunatities Rs.Ps.
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100% (using Digital Capacitive
Touch (Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
Addi. -Working range - 1 m Rupees Three Lakh
Spech. -Color rendering index 93Ra Ninety Thousand Only
- Focusing Preset: Adjustable
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this product under Class A,
Compliant to IEC standards such as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test
Certificates to be submitted with Bid) Clause-wise Technical Compliance to be
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a compact, modular
configuration to meet the precise requirements of hospitals, enabling customization to suit specific
operational needs of both Operating Theatres and Intensive Care Units. It should be equipped with robust
ceiling support capable of mounting a selection of arms. The extension arm, pivotal for functionality, should
allow horizontal movement with a radius of 800-900mm and provide a level rotation ranging from 0 to
330/340 degrees, with both the extension arm and terminal box designed to rotate together and
independently for maximum versatility. The pendant should support a net loading capacity of min. 100 kg,
accommodating a variety of medical instruments and devices securely. For medical and electrical services, it
should offer configurations that include at least two oxygen outlets, two vacuum outlets, one medical air, one
medical air at 7 bar, and an optional nitrous oxide outlet (In-scope of MGPS vendor) Additionally, there
should be six main sockets, each capable of supporting 5 to 15 amps, conforming to universal standards to
Rupees Two Lakh
Addi. facilitate the operation of various medical and electronic devices. In terms of materials and construction, the
pendant should be crafted from high-strength aluminum alloy with a sealed design to enhance durability and
2,84,000.00 EightyFour Thousand Nos.
maintain sterile conditions. The arm itself should be made from high-density aluminum alloy extrusion, Only
ensuring both strength and reliability. Installation of the pendant should be ceiling-mounted to provide a
reliable and firm setup, optimizing space usage in the Operating Theatre or ICU while seamlessly integrating
with existing medical systems for managing medical gas, electrical services, data communication, and
equipment. Additionally, the pendant should include practical features such as a stainless steel IV pole and a
ward vacuum unit clamp to further enhance its utility in a medical setting. With a net weight of approximately
105 kg, accessible by the equipment carrier, the pendant should be robust yet manageable, ensuring it meets
the rigorous demands of modern medical environments.
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
Providing and fixing UPS (25KVA) Of Good Quality as directed by engineer incharge Rupees Three Lakh Estimates
Addi. Qunatities Rs.Ps.
more 3,75,000.00 Seventy Five Thousand Job
Medical Gas Pipe Line Of Required dia for OT oxygen(set of 2 point), Vaccum , medical Air and surgical air..
Rupees One Lakh
Addi. Etc reuired Point(from existing line ) as directed by engineer incharge from Outer Nearest Passage to OT
Pendant Rate Including , Alarm , Valve (for all line) , and refixing of Point ,Flowmeter and Probe . if alredy
1,25,000.00 Twenty Five Thousand Job
then no payment given Only
General Surgeon Operating Table – Floor-mounted, height-adjustable (hydraulic/electric) OT table, overall
1900–2000 mm (L) × 500–600 mm (W); height adjustment 750–1000 mm; stainless steel/aluminum frame
Addi. radiolucent sections; adjustable backrest, leg rest, Trendelenburg/reverse Trendelenburg, lateral tilt, and Rupees Two Lakh Fifty
Spech. headrest; fireretardant, antimicrobial seamless mattress; smooth castor movement with central brake; Thousand Only
provision for standard
accessories (arm boards, headrest, IV pole, supports); load capacity 150–200 kg; easy to clean, durable, and
with IEC/ISO medical standards.
Execution of all type of Necessary Civil work for brick/block massaonary work, plaster, wall-celing
Antibacterial Paint, Painting, Door - Window sill-jambs of 16-18 mm Granite (OF OT Door -Window Only) tiles
Addi. patchups, new door/window (aluminium) etc and dismentaling door, windows, Brick/Block wall-floor-pcc etc Rupees One Lakh One
20 13.00 for new door opening, shifting of existing door/window and or closing old door/window as per Site 1,01,000.00 Job
Spech. Thousand Only
requirement and as per instruction of engineer incharge (all necessary civil work is to be done for creating
Estimate Rates Total Amount
Estimate Rates Total Amount
NBO according to
E But May ITEM DESCRIPTION UNIT
No Add Extra (Above item no. 13) for Copper Pipes for AIR HENDALING UNIT with all assesories and instalation Estimates
NO Addi. be Rupees Fifteen
21 121.33 with insulation etc complete 1,500.00 RMT
Qunatities Rs.Ps.
Spech. more Thousand Only
Total Estimated Amount
Total Estimated Cost Rupees Six Crore Thirty five Lakh Six Thousand Eight Hundred Eighty Five Only
I / We am / are willing to carry out the work at ……………. % Above / Below percentage a should be written in figures and words of the
Estimated rates mentioned above. Amount of my / our Tender works out as under.
Estimated amount put to tender
Put to tender Rs.
Deduct ………% Below.Rs.
Note-1 All work shall be carried out as per Public Works Department Handbook and other specifications of divisions or as directed.
All the columns in Schedule should be filled in ink and the total of the enteries in the last colummn should be stuck by the contractor under his
Rate quoted includ clearence of site ( prior cmmencement of work at its close ) in all respects and hold good for work under all cinditions, site,
moisture, weather, etc.
Note-4 To be continued on additional sheets, if found necessary.
Serviceable material available ( if any ) after Demolishing / Dismentalling any item should be hand over to the concerned PIU Site
Engineer In Charge as per instruction of engineer in charge.
Deputy Executive Engineer (Civil) Executive Engineer (Civil)
Project Implementation Unit Project Implementation Unit
Zone-6, Vadodara City Zone-6, Vadodara City
Deputy Executive Engineer (Elect.) Executive Engineer (Elect.)
Project Implementation Unit Project Implementation Unit
Zone-6, Vadodara City Zone-6, Vadodara City
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Civil Building Specification Book.pdf
02 Electrical Specification Book.pdf
03 Circular Part 1.pdf
04 Circular Part 2.pdf
05 Special Condition.pdf
06-01 Civil Make List 2025.pdf
06-02 Special Instruction to Bidder.pdf
07 SBD MOT.pdf
08 Schedule B of MOT Works.pdf
09 Specification MOT Work.pdf
10 Certification of MOT works.pdf
11 PQ Criteria for MOT Works.pdf
12 Tender Document 07-01.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .