Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
26 Oct 2026, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ranjeet Bahadur
Kota TOP, Bharat Petroleum Corporation Limited
Site Visit is mandatory for bid to be accepted Pre bid meet: 22.10.2026 Time 14:00 Conference Room BPCL Kota TOP Site Visit is mandatory to qualify this tender Pre bid meet: 22.10.2026 14:00 Hours Venue: Conference Room, BPCL Kota TOP
27070
1000467267
Limited Tender
Works
Kota TOP
26 Oct 2026
18 Oct 2026
26 Oct 2026
19 Oct 2026
26 Oct 2026
19 Oct 2026
22 Oct 2026 - 22 Oct 2026
PRICE BID DOCUMENT
BHARAT PETROLEUM CORPORATION LIMITED - KOTA TOP
Total Amount incl. GST
Sr. No. Service No. Item Description Qty Unit Basic Rate (₹) GST Rate (%)
1 Wooden cabinet 1 EA
2 Mini refrigerator-50 L 1 EA
3 Wash basin outside for cleaning utensils 2 EA
4 Dustbin (wet and dry) for outside canteen 4 EA
5 Buffetware 1 EA
6 Glassware table with SS support 2 EA
7 Decorative pictures 4 EA
Modular Kitchen & Furniture (Including Storage Cabinets, Worktops, & Associated
9 Electrical kettle 2 EA
10 Dosa Tawa 1 EA
11 9019094 GYPSUM BOARD 12.5MM 20 M2
12 9019211 LED LG RECESS 32W NT 8 EA
13 9015191 SITC of LED TUBE Light 18 W 10 RA
Light cablin work - for LED Tubelightsm including supplying and fixiing of
boards,sockets switches and necessary wireing requrired as per site condition and
approved by Enngineer in Charge.
No. of boards ->
14 9022134 No. of swithces per board -> 6 1 LS
No. Sockets 5A 1 per board
Tentative length of wiring 250 M
Supplying & fixing in position FOR SHUTTERS OF DOORS, WINDOWS &
VENTILATORS of aluminium partitions, doors, windows,ventilators, louvres, fixed
glazing, sliding windows, north
lighting glazing, aluminium rough ground etc. with extruded & integral colour
powder coating ( 50 microns) , Aluminium sections,
powder coated Aluminium beadings,powder coated Aluminium profile panelsheets,
manufactured to IS 733, IS 1285 and other relevant codes & using
minimum 2mm thick (or as specified) heavy sections from approvedmanufacturer
including cost of supplying required no. of heavy
duty stainless steel butt hinges, pivots, approved door and windowshandles, EPDM
Gasket, PVC/Neoprene Gasket Lining,
Stainless steel screws, mastic filling, weather strips, tower bolts,nuts, washers,
rollers etc. as required and as per drawing etc. all
complete at all heights and as directed by the Engineer-in-Charge. Therate shall
15 9019066 also include giving a coat of bitumastic paint on the 80 M2
aluminium surfaces in contact with masonry / concrete and closing thegaps around
the frame and the adjoining surface with
approved silicone sealant on both faces to achieve watertightness.
Note:1. No extra payment will be made for all non-aluminium consumable
itemslike screws, gasket, weather strips, PVC/Neoprene lining and butthinges,
tower bolts etc.
2. Glazing, Particle Boards, aluminium grills, mesh etc. will bemeasured and paid
separately under relevant item.
3. All fitting shall be of matching colour powder coated aluminiumsections.
4. The aluminium sections shall be smooth, rust free, straight, mitredand jointed
mechanically wherever required
including cleat angles at no extra cost.
Along with development of necessary framework
Providing and applying Plaster of Paris (POP) false ceiling, including preparation of
surface, providing and fixing GI frame work (if required) or chicken mesh properly
tied to the structural ceiling, and applying POP plaster in layers to required
thickness. The ceiling shall be finished smooth, true to line and level, including
making grooves, mouldings, coves, drops or any design pattern as per drawings. The
work shall include cutting, filling joints, finishing with sand paper, and making
openings for light fixtures, fans, AC grills, etc., complete in all respects as per
approved design
Providing and and direction
applying of Paris
Plaster of Engineer-in-charge.
(POP) wall paneling PVC/Wallapper tiles,
including preparation of surface, providing and fixing GI/wooden framework or
chicken mesh (if required) properly anchored to the wall, and applying POP plaster
in layers to required thickness. The paneling shall be finished smooth, true to line
and level, including forming grooves, mouldings, borders, patterns, or designer
panels as per approved drawings. The work shall include cutting, filling joints,
sanding, and making openings for electrical boxes, switchboards, etc., complete in
all respects as per design and direction of Engineer-in-charge.
Bidder instructions: Basic Amount
Enter the unit basic rate and GST rate (for example, enter 18 for 18%) in the yellow cells. GST Amount
The total amount is calculated automatically for each item and for the complete bid. Grand Total
Bidder / Company Name GSTIN
Authorized Signatory Date
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
27070.pdf
pdf • 6.46 MB
BUDGETDOC_27070.pdf
pdf • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .