| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.3 LAccepted-Finance | L-1 | Accepted-Finance Accepted |
Tender Value
₹29.8 L
EMD Value
₹59,587
Closing Date
11 Aug 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
(SH - Desilting of covered / pipe / brick drains from Lohiya Dwar to Agra canal by deploying labour / super sucker / pumps / jetting machines / any other suitable mechanical means).
2026_PWD_296419_1
75/EE/SER-1/PWD/2026-27
Open Tender
Civil Works
Percentage
15 days
Assistant Engineer, SER-12
As per NIT
10 documents required · 10 mandatory
₹0
₹59,587
13 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting of covered / pipe / brick drains by deploying labour / super sucker / pumps / jetting machines / any other suitable mechanical means including opening/closing/placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge within 15 days (Upto 30thJuly).
The rates includes all above operations including opening/closing /placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. (The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item no 3.
Drains above 600mm upto 1200mm in width and all depths / drains upto 1200 mm dia pipes. | 205 | Mtr | 224.48 | ₹46,018.4 |
| 2 | Disposal of silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish / similar unserviceable dimantled or waste materials by mechanical means/including loading, transporting and unloading the same at any authorized Municipal/ any other Dumping Ground including weighing at plant etc. complete as per direction of Engineer-in-charge. Weighing and unloading at the plant shall be as per procedures/ rules of the Dumping Ground Management. The rates are inclusive of all operations, labours, leads and lifts from site of work to the authorized Municipal/ any other Dumping Ground. (Processing fees at prescribed rate of dumping ground will be deposited by the agency and shall be reimbursed by the department on production of only original cash receipts). (Payments for disposal under this item will be made on production of original Municipal dumping ground receipts), the agency shall also submit pre & post photograph in soft/hard copy. | 110 | MT | 359.95 | ₹39,594.5 |
| 3 | Hiring and operation of mobile crane (Hydra) for 8 hours/day for loading, unloading of dismantled material in truck or dumpers, levelling and dressing of ground etc including all risk involved in demolition operations etc i/c cost of driver, helper, diesel, lubricants etc complete as per direction of engineer in charge (Note : Contractor will be responsible for all risk involved during demolition operation) | 10 | Nos | 6,401.86 | ₹64,018.6 |
| 4 | Add EPF & ESIC @ 0.85% | 1 | LS | 1,272 | ₹1,272 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 9 | Cum | 260.3 | ₹2,342.7 |
| 6 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm. | 50 | Cum | 549.75 | ₹27,487.5 |
| 7Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 7.1 | Suspended floors, roofs, landings, balconies and access platform | 120 | Sqm | 927.25 | ₹1,11,270 |
| 7.2 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 480 | Sqm | 842.5 | ₹4,04,400 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 7,200 | Kg | 107.85 | ₹7,76,520 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.46 MB
BOQ_394559.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .