| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹3.9 L+₹49,801.10 (14.5%)Rejected-Finance | L2 | Rejected-Finance higher bidder 2 | |
| 3 | L3₹4.0 L+₹55,484.90 (16.1%)Rejected-Finance | L3 | Rejected-Finance higher bidder1 |
Tender Value
₹4.5 L
EMD Value
₹9,060
Closing Date
24 Aug 2023, 3:00 pmClosed
EE-I WKS
EE-I Wks
Renovation of footpath side drain and hand railing starting from Model School to Ratnam Market near Kamraj School at Ward No 05
2023_PMBC_11251_1
66/EE/WKS-I/MC/2023-24
Open Tender
Construction Works
Works
120 days
Ratnam Market
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,060
24 Aug 2023
10 Aug 2023
24 Aug 2023
10 Aug 2023
24 Aug 2023
10 Aug 2023
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.G.I. pipes
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
B S ENGINEERING
R D CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
finance_11973.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .