| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77.5 CrAdmitted-Finance | +12.65% | ₹77.5 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Documents Not Complied |
Tender Value
₹68.8 Cr
EMD Value
₹1.4 Cr
Closing Date
2 Apr 2026, 6:00 pmClosed
CE WR ZONE KOTA
CE WR ZONE KOTA
Construction Work Of Remaining Reaches of LMC, RMC and Their Distributaries and Minors of Gararda Medium Irrigation Project District Bundi
2026_WRDAS_542779_1
CE WR KOTA -NIT33/2025-26 BUNDI
Open Tender
Civil Works
Percentage
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
AS PER NIT
₹1.4 Cr
Yes
17 Apr 2026
27 Feb 2026
3 Apr 2026
27 Feb 2026
2 Apr 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK | |||||
| 1.01 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting | 4,64,406 | Sqm | 1.45 | ₹6,73,388.7 |
| 1.02 | Cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department (A) 7.5 cm to 15 cms girth | 3,169 | Each | 41 | ₹1,29,929 |
| 1.03 | (B) over 15 cm to 30 cms girth | 1,704 | Each | 126 | ₹2,14,704 |
| 1.04 | (c) over 30 cm to 45cm girth | 100 | Each | 212 | ₹21,200 |
| 1.05 | Excavation for foundation of Dam ins eams/faults and at other confined places nearer to Abutment, peir, wings etc. in hard rock by line drilling/ rock breaker including dewatering, disposal, loading, unloading and dressing of excavated material within initial lead of 50m. and lift upto 1.5m complete in all respect. | 82,665.14 | Cum | 1,263 | ₹10,44,06,071.82 |
| 1.06 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required 1 st initial lift 1.5 m to 3m | 6,898.2 | cum | 8.5 | ₹58,634.7 |
| 1.07 | 2nd initial lift 3 m to 4.5m | 3,533.5 | cum | 17 | ₹60,069.5 |
| 1.08 | 3rd initial lift 4.5 m to 6 m | 1,409.9 | cum | 25.5 | ₹35,952.45 |
| 1.09 | 4th initial lift 6 m to 7.5m | 466.2 | cum | 34 | ₹15,850.8 |
stage.html
html • 0.03 MB
technical_967627.pdf
techsummary_967627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
Tech_Fin_Bid_Gararda_MIP.pdf
Tender Documents • 5.23 MB
Financial__BID.pdf
Tender Documents • 3.90 MB
BOQ_967627.xls
BOQ • 0.38 MB
PreBidCorrigendum.pdf
PDF • 0.35 MB
Pre_Bid_Proceeding_NIT33_2025_26.pdf
PDF • 4.91 MB
Corrigendum.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].