Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.6 L+₹1.1 L (5.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | T P RIYAS AHAMMED L1 | ABDURAHIMAN M K L2 |
|---|---|---|---|---|---|
| 1.00Kuttikadavu Bridge Hand Rail Restoration | |||||
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.19 | cum | 9,152.05 ₹10,872.64 Lowest | 9,660 ₹11,476.08 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 95 | kilogram | 103.26 ₹9,809.7 Lowest | 109 ₹10,355 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 76 | sqm | 354.69 ₹26,956.44 Lowest | 374.4 ₹28,454.4 |
| 1.00 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 2,232.41 | kg | 207.59 ₹4,63,426.82 Lowest | 219.1 ₹4,89,121.91 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 295 | sqm | 151.43 ₹44,671.85 Lowest | 159.8 ₹47,141 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 115 | sqm | 74.26 ₹8,539.9 Lowest | 78.4 ₹9,016 |
| 2.00Manakkadu Malapram Road | |||||
| 2.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 75 | sqm | 14.7 ₹1,102.5 Lowest | 15.5 ₹1,162.5 |
| 2.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 3.56 | cum | 2,283.3 ₹8,133.11 Lowest | 2,410 ₹8,584.42 |
Tender Value
₹20.5 L
EMD Value
₹50,000
Closing Date
24 Oct 2025, 11:00 amClosed
Assistant Engineer
ASSISTANTENGINEERLIDEWMAVOORGP
Annual Plan-Mavoor GP- Annual plan 2025-26 -Project no 162/25-26 - MAINTENENCE OF VARIOUS ROAD IN MAVOOR GP - STAGE 2-General Civil Work
2025_LSGD_810848_1
T8/AE/LIDEW/MVR
Open Tender
Civil Works - Roads
Item Rate
Mavoor g p
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
25 Nov 2025
16 Oct 2025
25 Oct 2025
16 Oct 2025
24 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353695.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1353695.xls
BOQ • 0.26 MB
162sbd.pdf
Tender Documents • 2.62 MB
combinepdf.pdf
Other Document • 0.08 MB
162nit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .