Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -31.89% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 L+₹11,883.08 (5.92%)Admitted-Finance | -27.86% | ₹2.1 L+₹11,883.08 (5.92%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹46,824.63 (23.3%)Admitted-Finance | -16.01% | ₹2.5 L+₹46,824.63 (23.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 L+₹86,808.39 (43.2%)Admitted-Finance | -2.45% | ₹2.9 L+₹86,808.39 (43.2%) | L4 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
8 Sept 2026, 6:00 pmClosed
Executive Engineer REW Samba
Office of the Executive Engineer REW Samba
Please refer as Tender Documents
2026_RDPR_322969_6
94 REW Samba of 2026-27 Dated-31-08-2026
Open Tender
Civil Works
Percentage
30 days
Bari Brahmana
Please refer as per BOQ
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹5,880
10 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 41.82 | sqm | 91.75 | ₹3,836.99 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded | 8.1 | cum | 4,826.5 | ₹39,094.65 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size, | 11.4 | cum | 5,733.6 | ₹65,363.04 |
| 4 | Dumping of stone | 4.89 | cum | 700 | ₹3,423 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 57.62 | sqm | 286.35 | ₹16,499.49 |
| 6 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge | 45.54 | sqm | 816.15 | ₹37,167.47 |
| 7 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) | 87.36 | sqm | 971 | ₹84,826.56 |
| 8 | Cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) | 0.41 | cum | 6,591 | ₹2,702.31 |
| 9 | 12mm thick cement plaster (1:6) | 40.89 | sqm | 266 | ₹10,876.74 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) excluding the cost of centring & shuttering. | 1.25 | cum | 7,788.4 | ₹9,735.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_1085781.xls
BOQ • 0.24 MB
VCCCC.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .