Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance WEST BENGAL | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
8 Jul 2020, 11:00 amClosed
Admiral Superintendent
NSRY KARWAR
NORMAL REFIT OF FB PREMA
2020_NAVY_351787_2
YCM/NR20/FB PREMA
Open Tender
Marine Services
150 days
Naval Ship Repair Yard Karwar
AS PER RFP
2 documents required · 2 mandatory
₹0
₹10 L
Yes
29 Jul 2020
20 Jun 2020
9 Jul 2020
20 Jun 2020
8 Jul 2020
20 Jun 2020
Amount
Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor
Fire sentry for minimum 10 hot work locations /day Note:- Fire sentries with adequate knowledge of fire and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident.
Cleaning and Gas free certification i.a.w NO 09/12 of Fuel / Oil Tanks, Water Ballat Tanks and Fresh Water Tank. Area-3520 Sq m Quote for Service.
Pressure Testing of Underwater tanks/void spaces/cofferdams. Including repairs/blanking of manhole covers( with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor.Ballast tannks Qty-08, Fuel tanks- 12, Fresh water tanks- 03, Peak tank Qty- 02. Quote for Service.
Bollard and Fairlead - Carry out surface preparation by hydrojet blasting up to bare metal to WJ 2 Standard. Repairs to be undertaken as per hull survey report of bollards / fairleads and stiffening members in the vicinity. Bollard (qty 13), Fairleads (qty 10). Note:- After hydrojet blasting, primer application to be undertaken to prevent flash rusting the same is to be put up for inspection prior to repair / renewal or painting to refit monitoring team. Inspection to be cleared post repairs by NSRY/ QC Team. Material and Service to be provided by contractor
Renewal of sea tube/Sea chests. (Including DPT of weld seam) i.a.w NES 155, NES 706. Material and Service to be provided by contractor
Pressure testing of sea tube to 0.2 Bar upto 10 mins i.a.w NO 01/15. Material and Service to be provided by contractor
Underwater Plating - (a) Remove marine fouling and old paint to bare metal from hull using hydrojet blasting to WJ 2 standard. (b) Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored. (c) Application of paint on underwater hull and boot top area to be carried out post WJ 2 standard.Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship, (iii) Aft. Renew defective draught marks. Note-: Navy approved paint scheme Jotun to be applied. Painting to be carried out as per NO 53/16. Material and Service to be provided by contractor
Above Water Area, Weather Deck Area- Carry out complete surface preparation by hydro jet blasting up to bare metal to WJ 2 standard. Defects to be rectified as per hull survey report. Carry out painting of above water area with high performance advanced hybrid coating system as per navy approved paint scheme Jotun mentioned below and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Jotun mentioned below. (a) Paint scheme for above water area (ship side, deck & super structure):- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns. (b) Paint scheme of weather deck area (upper deck, funnel deck and bridge top deck):- (i) 01 coat primer coat - dft 50 microns, (ii) 01coat anti corrosive intermediate coat - dft 200 microns, (iii) 01 coat non skid top coat - dft 800 microns, (iv)Total dft - 1050 microns. Material and Service to be provided by contractor
Funnnel and Masts- Carry out complete surface preparation by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint of surroundings structure, funnel and Mast structure. Heat resistant paint on funnel to be applied as per navy approved paint scheme RAL 9011(black) and/or RAL 9010 (White) And/or IS 5/ 358 (Buff colour) as per NO 53/ 16.Note:- Painting to be carried out as per NO 53/16. Paint scheme for mast:- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns. Material and Service to be provided by contractor.
Machinery Spaces - Clean all bilges, machinery foundation and surface preparation as per ST 3 standard and painting of the entire area. Clean all limber holes and drain holes. Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paint to be provided by Firm. Material and Service to be provided by contractor
Machinery Vibration Mounts - Manually clean and apply Nicole lacquer on the vibration mounts of all equipment. 25% of the total mounts are to be replaced post undertaking grouping of mounts based on SPM Checks. Material and Service to be provided by contractor.
Lagging Renew damaged / perished lagging at various places using pin method. Renew / restore in case of existing areas, paint scheme of affected areas before renewal of lagging. Material and Service to be provided by contractor.
Cathodic Protection Sacrificial Anodes - Renew total sacrificial anodes fitted to underwater hull, rudders, rope guard, shaft tunnel, stern tubes, inlets and outlets, sea chest, bilges and coffer dams. Quality certificate of the Anode to be provided for newly fitted anodes prior fitment. Material and Service to be provided by contractor.
Steel Renewal of structural plates (with Stiffeners) of deck and bulkheads including tank tops (including degutting of lagging, perforated paneling, cabling assiciated equipment minor eqpts., brackets, wooden fittings, machinery / equipment, switchboard / control panels, electronic and communication equipment, all light fittings, pipe lines, valves, electrical cables, junction boxes, obstructions, protrusions, foundation etc. etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting) of thickness as specified below with testing of weld joints by DPT. Steel plates supplied by Yard. All consumables material supplied by contractor. Quote for Service and Yard consumables.
Minor repairs of Wooden Furniture - Repair of wooden furniture (dinning table top in crew and officer's dinning hall - 03 nos.,wooden locker in dinning hall-02). Mat - Wood. Material and Service to be provided by contractor.
Repair of locking arrangement of all lockers and cupboards in all cabins and wheel house. Material and spares to be provided by contractor.
Plywood at lockers, cupboards and other wooden furniture in various offices and accommodations found broken / perished. The same is to be renewed. Material and Service to be provided by contractor.
Renewal/ Repairs of Furniture- Accommodation and Offices - Renewal of Center Table (Wooden) (Qty 01) (850x500x450h). Material and Service to be provided by contractor.
Renewal of Bunk lockers (Qty 20) as per sample.Material and Sevice to be provided by contractor
Renewal of Sofa with table (qty 01) (5 men sofa) as per sample. Material and Service to be provided by contractor
Renewal of mattress with cover and their securing arrangements. Single type mattress (Qty 14). Thickness - 6" as per sample. Material and Service to be provided by contractor
Renewal of cabin chairs in mess decks (qty 4). Material to be provided by contractor
Renewal of chairs in dining hall (qty 06). Material to be provided by contractor
Renewal of executive chairs (Revolving) in master cabin, engine driver cabin, wheel house (Qty 04). Material to be provided by contractor
Anchor, Chain Cable and Cable Locker - Lay out Anchor and chain cables and carry out surface preparation up to bare metal for survey. Repairs to be under taken as per hull survey report. Undertake survey of cable and shackles.Dismantle anchor and chain cable , clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Examine hull associated fittings. Clean and grease trunion pin and housing. Grease to be used:- LG-280 Patt No 0474/910-0502. The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All such shackles are to be stripped, greased and re-assembled. Anchor, chain cable and cable locker to be painted as per existing paint scheme. Paint to be provided by refittng firm. (Qty: Anchor - 02, chain length- 275 mtr). Material and service to be provided by contractor.
Overhauling- Capstan (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of capstan along with motor assembly and changing of oil. Equipment to be proved for satisfactory operation. Undertake weather proofing of motor terminal box. (b) Renew all high speed bearings. (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and thereafter varnish dirty and oily windings. (e) Motor to be overhauled, with both bearings renewed & tested onboard on load (subject to QC checks). (f) Overhauling of brake mechanism to be carried out. (f) Inspect and overhaul the control panel and renew defective components and cabling. (g) System to be proved for designed operation and load trials to be offered. Material and Service to be provided by Contractor
Overhauling- Anchor Winlass (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of anchor winch along with motor assembly, rollers and anchor windlass accessories. Changing of oil and insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. Undertake survey of structure post load testing. Structural defects to be rectified, if any. (b) Renew all high speed bearings (6208.2zr). (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and varnish dirty and oily windings. (e) Motor to be overhauled, both bearing to be renewed & tested onboard on load (subject to QC checks). (f) Overhaul brake mechanism. (g) Overhaul the control panel, and renew defective components and cabling. (h) Load test details to be furnished. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. (j) System to be proved for designed operation and load trials to be offered. (k) Carry out surface prepaeation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor
Overhauling of mushroom head with spindle and valves to be undertaken. Operationability of Quick shut off valve to be proved. Wire mesh to be renewed. Material and Service to be provided by contractor
Overhauling- Sewage Treatment Plant (Mfd - Hamworthy, England, Model-ST 3 A-C) - Undertake following routines: (a) Functioning of level switches of V-1 tank. Carryout de-sludging of V-2 tank by backflushing line. Clean the seawater ‘y’ type strainer at the inlet to bookcell. Lub oil to be renewed. Clean air supply filter / regulator element in solvent. Drain, inspect & clean the ‘bookcell’. Remove large deposits of hard material with diluted hydrochloric acid. Post completion of routines, operate system and inspect for leaks and proper cell amperage. (b) Inspect the tightness of belt and check leakage from gland of discharge pump. Repack the gland (if required). (c) Carry out following on Macerator pump:- (i) Check to ensure there are no leakages from the main seals. Renew drive end bearing and seals. (ii) Ensure impeller is free for rotation with no vibration. (iii) Ensure overload units operating correctly. (iv) Remove drain plugs provided at each end of the bracket of the electric motor and allow any accumulated moisture to drain away. Replace damaged plugs. (d) Clean and lubricate all plug cock valves. Lubricate valves in fully opened or fully closed position only. (e) Post repairs, STP to be proved for operation as per designed parameters. (f) Undertake effluent test from NABL accredited lab and check compliance to MARPOL norms. (g) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of marpol 73/78. (h) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate. Material and Service to be provided by contractor
Ventilation Trunking - Mechanical cleaning of Ventillation trunking to be undertaken and earthing strips on upper deck and mess. Paint to be restored post repairs as per existing paint scheme. Material and Service to be provided by contractor.
Grease filters inside exhaust trunking in galleys to be renewed, Qty- 02. Material and Service to be provided by contractor.
Airvent Pipe - wiremesh and securing strips damaged/ corroded of natural air vent (Goose Neck). to be renewed. Mat -MS Qty- 22. Material and Service to be provided by contractor.
Life raft - (a) Renew Hydrostatic Release Gears by NABL accredited agency. (Qty 02) Quote for material. (b) Life raft stowing brackets (Qty 02) along with sliding ladder damaged / corroded. To be repaired / renewed and operational. Job involves renewal of life raft securing straps, slips and shackles. Quote for services and material.
Ladders - Carry out mechanical surface preparation of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps and handrails. Paint to be restored as per existing paint scheme. Material and Service to be provided by contractor
Overhauling- Single Arm Boat Davit (Mfd - Aquarius Fiberglass Pvt. Ltd): - (a) Overhauling of boat davit, gear box along with motor assembly. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. During trials motor parameters are to recorded and same to be cleared by qc. Offer for trials to ss post completion. (b) Survey wire rope, spare gear and other associated lifting gears. Renew as necessary. (c) Carry out load testing with davit fully rigged up. After completion of load test. Examine the complete davit structure and associated lifting gears for flaws, distortion, defecation etc. flaws must be examined, carry out repairs if necessary and retest. (d) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint post surface preparation. (e) System to be proved for designed operation and load trials to be offered. Material and Service to be provided by contractor.
Overhauling Rescue Boat - Operanlised the rescue boat. Carry out following:- (a) Repair of GRP hull structure and serviceability checks of boat to be carried out. Undertake serviceability checks and repairs as required of all boat fittings i.e. Rubbing strip, hand holds, grab handels, life lines, slings and slings points, transom,boat rope etc. Reflective tape to be renewed. Carry out load test of boat slings. Trials to be carried out alongwith weighing of boat with accessories post repairs. Test certificate to be provided. (b) Overhauling of motor boat engine including calibration of injectors. (c) Boat chocks to be repaired and cushion to be renewed. Renewal of all seating arrangements of boat. (d) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester. (e) 02 in Nos oars and boat hook for rescue boat damaged / broken. To be renewed. (f) Renew polyester webbing boat sling for lowering and hoisting purpose. SWL 3.5 ton. Load test certificate to be provided. Boat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by Contractor
Overhauling - Sanitary System - Operationlised complete sanitary system. (a) Strip, clean and overhaul WC and urinal flushing valves, reducing valves and reducer (Qty 08). (b) Strip and clean sanitary system drain pipes. Re-galvanize where required (Length - 18 m). (c) Following accessories in the WC and bathroom to be renewed:- (a) Hand Shower - 04, (b) Wash basin tap - 04, (c) commode seat cover - 03, (d) Commode flush knobs - 04, (e) Wash Basin drain pipe - 06 (f) Mixer - 05 (g) Shower curtains - 05. Material and Service to be provided by Contractor
Overhauling- Domestic Fresh Water System - (a) Strip, clean and overhaul domestic fresh water system valves. Stop cock (qty 08), basin beep cock (pillar) (qty 04), sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). (b) Strip and clean domestic fresh water system pipes. Re-galvanize where required (Length - 15 m). Material and Service to be provided by Contractor
Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repair clips, hinges for looseness and wedge pieces for signs of wear and tear. Examine leather washers, toridal sealing rings and rubber sealing. Renew worn out parts and rubber beading. Carry out chalk test of all W/T doors. Paint to be restored as per existing paint scheme. Material and Service to be provided by contractor
Repair 05 in nos NWT doors hinges and deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, hydraulic door closing mechanism and rubber beading and removal & fitment, repairs to coaming of door, structural coaming, frames). Material and Service to be provided by contractor
WT Hatch and Manhole - (a) WT Hatch - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repairs and overhauling of WT Hatches. (Including surface preparation of hatch body and primer application, repairs to Coaming of hatches, Structural coaming, frames and straightening of bent hatches by removal & fitment, replacement of locks, auto locks, hinge pins, hinge assembly, rubber beading and removal & fitment).Carry out chalk test post repairs and renew worn out parts as necessary. (Qty - 06) (b) Renewal of rubber beading of manholes. (Qty - 28) Material and Service to be provided by contractor
Scuttles & Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardent cloth. Material to be provided by refitting firm. Scuttles - 07 & Windows - 18. Material and Service to be provided by contractor
Guardrails and Stanchions - Renew guardrail stanchions and securing foundations. Renew all the earthing connection of guard rails / stanchions and ensure grounding . Paint scheme of the stantions to be restored as per paint scheme . Material and Service to be provided by contractor.
Paint Scheme Renewal Water Ballast Tank and Fresh Water Tank - Carry out complete surface preparation to bare hull (SA 2.5 standards). Thereafter Paint to be restored as per existing paint scheme post repairs as per hull survey report for the following tanks:- (a) Water Ballast Tanks - 8, (b) Fresh Water Tanks - 3, Total Area - 2552 Sqm Paint to be supplied by contractor. Material and Service to be provided by contractor.
Internal Portion of Super Structure - Damaged area to be prepared up to bare metal and painting to be under taken as per existing paint scheme post repair plating, structures and fittings of various compartments as per hull survey report. Paint to be supplied by contractor. Material and Service to be provided by contractor.
Steel Renewal of A/W Structural plates along with Stiffeners of Deck and bulkheads and ship side (including degutting of lagging, perforated paneling, cabling associated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting)and thickness as specified below:Material grades: DMR 249A, DMR249B, D 40S, MS, B Quality steel.Standard : NES 155, NES 706. Steel plates supplied by yard and Welding Consumables to be supplied by contractor. Payment on actuals. Material and Service to be provided by contractor.
Fabrication and fitment of minor and major foundations (including degutting of lagging, perforated paneling, cabling assiciated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting).Standard : NES 155, NES 706(Steel supply by yard and weld consumables by Contractor). Material and Service to be provided by contractor.
Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS Material and Service to be provided by contractor
Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS Material and Service to be provided by contractor
Rubbing Stake - Rubber fenders (rubbing stake) all around the fuel barge found damaged / perished. Fenders to be renewed. Length- 50 mtr. Material - EBDM/NBR/Natural rubber. Material and Service to be provided by contractor
Pneumatic side fenders (size- L- 1160 MM, Dia - 660 MM) to be renewed. (Qty - 08) Material and Service to be provided by contractor
Fenders -Tyre fenders of barge found damaged. Renewal of tyre fenders (Air craft old tyres) (Qty- 43) (Aircraft tyres with outer dia 90 cm) to be carried out. ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders. Material and Service to be provided by contractor
Fenders - Renewal of eye pads associated with rubber fenders (qty 70) . ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders.Degutting and regutting of lagging to be undertaken. Material and Service to be provided by contractor
Fenders -Renewal of 20 mm galvanised chain (qty - 120 mtr) Note : Vendor to clear QC checks from user manager prior fitment . Material and Service to be provided by contractor
Fenders - Renewal of D shackle 20 mm (Qty - 100). ( Note : Vendor to clear QC checks from user manager prior fitment) . Material and Service to be provided by contractor
Life Saving Appliance. Renewal of following:- (a) Lifebuoy with self igniting light and smoke signal (MOB marker) quick release type to be renewed on bridge deck (qty 02), (b) Lifebuoy with life line (30m long) on 01 deck (qty 02), (c) Ordinary lifebuoy damaged. on main deck (qty 02), (d) Lifebuoy with self igniting light and 30m buoyant life line on 01 deck (qty 02). (e) Renewal of reflective tape on all lifebouys. Material and Service to be provided by contractor
9 Mtr aluminum gangway damaged / broken. To be replaced as per existing gangways. Mat - Al, length - 09m. Material and Service to be provided by contractor
Renewal of Name Board Ships name box along with lighting arrangement defective. To be renewed. Mat - MS (qty 01).Material and Service to be provided by Contractor
Ships name board on Port and Stbd side to be renewed. Mat - Wood (qty 02) with name engraved by steel electroplating. Material and Service to be provided by Contractor
Airvent pipe and valve - Overhauling of 36 in nos ball type check valves of Airvent pipe to be undertaken. Repair structural defects.Air vent valves of all ballast tanks found to be not holding. Valve to be overhauled and mesh to be replaced. Material and service to be provided by Contractor
Renewal of workshop tables (Mat - MS, qty-1) and flag locker (Mat - MS, qty-2). Material and service to be provided by Contractor
Fire hose box and securing brackets corroded at multiple locations. To be renewed. Job involves welding, cutting and renewal of securing brackets. Material and service to be provided by contractor
Foundation of Port and Stbd search light found deteriorated. Renewal to be undertaken. Mat - MS, (Qty - 02) Material and Service to be provided by contractor.
Rotating mechanism of Port and Stbd search lights jammed. Overhauling of mechanism to be undertakent. (Qty - 02). Material and service to be provided by contractor
Securing arrangement of navigation light (White) on main mast to be renewed. Mat- MS. Qty-01. Material and service to be provided by contractor
Fiber canopy on Main deck to be renewed. Job involves complete renewal of stanchions (Mat - Stainless Steel), stanchion shoes, securing strips and installation with new fiber canopy (80 sqm). Material and service to be provided by Contractor
Chair fitted in Wheel House (Qty - 01) and engine room (Qty - 01) found to be broken. Chair to be renewed as per sample. Job involves fitment of chair and renewal of securing brackets. Material and service to be provided by Contractor
Fixed wooden chair to be fitted in Wheel House for operator. Job involves fitment of chair and renewal of securing brackets. Mat - Wood. Material and service to be provided by Contractor
MOB marker brackets in bridge wing (port & stbd) damaged/ broken. To be renewed. Job involves welding and cutting assistance. Mat - MS, Qty - 02. Material and service to be provided by contractor
Curtains in dining hall to be renewed with fittings as per sample. Mat - Synthetic pvc. Dimensions - 4 Feet X 6 Feet, Qty - 03 Material and service to be provided by contractor
Sounding cap of various tanks threads worn out on both end. To be renewed. Mat - Brass. Material and service to be provided by Contractor
Box for storing life buoy found damaged. Boxes to be renewed. Job involves fitment also. Mat- Wood. Qty - 02 Material and service to be provided by contractor
Air line on main deck corroded / broken at various locations. To be renewed in-situ. Job involves welding and cutting assistance. Mat - MS. Material and service to be provided by contractor
Hot plate locker in galley damaged / broken. To be renewed. Mat- MS (As per sample) Material and service to be provided by Contractor
Metal locker in galley damaged / broken. To be renewed. Mat - SS. (As per sample) Material and service to be provided by Contractor
IMO stickers to be renewed all around ship.(Qty - 120). Material and service to be provided by contractor
Fire extinguisher securing brackets to be renewed including associated degutting of lagging / panelling / equipment / cabling and regutting. Job involves welding and cutting assistance. Qty - 10. Material and service to be provided by contractor
05 in nos marine wall clock to be renewed. Material to be provided by contractor.
Portable aluminum ladder broken / damaged. To be renewed. Mat- AL Material and service to be provided by contractor (As per sample).
Port and Stbd Main Engine (M/s Cummins India Ltd, Model- KTA-19-M4 (Running hours - Port: 2500; Stbd; 2500) :- Carry out following routines / work:- (a) Change engine oil, oil filter and by-pass filter (b) Clean pre-cleaner dust pan of air system (c) Change air cleaner element (d) Change coolant (e) Clean fuel filter / water separator (f) Change marine gear oil (g) Adjust throttle linkage, rectify defect if any (h) Change fuel filter, (j) Clean fuel tank breather, (k) Clean crankcase breather, (l) Renew heat exchanger Zinc plugs, (m) Renew belts, (n) Calibrate injectors and adjust valves, (p) Replace rocker cover gaskets, (q) Overhaul starting motor, (r) Port main engine starting panel indicator light not working, to be renewed, (s) Stbd main engine digital RPM indicator in LCP not working. To be replaced, (t) Port main engine lub oil cooler sea water discharge pipe corroded. Pipe to be renewed. Mat-GI, Dia-65 mm. Length- 01 meter, (u) Leakage observed from Port Main engine lub oil hand pump. Defect to be rectified, (v) Renew all instrumentation gauges and fittings (RPM, lub oil pressure, lub oil temp, water temp, voltmeter, hour counter), (w) Remove, dismantle, chemically clean, assemble and pressure test to required pressure with spares for fresh water and lub oil heat exchangers of both main engine. (x) Carry out SDC checks of both Main engines local control panel and wheel house control panel, rectify defects if any. (y) Carry out SDC checks of both Main engine, rectify defects if any. Quote for Service
Port and Stbd Main Engine, Cummins, Model-( KTA-19-M4) - Resistor,Corrosion (10 Litres)
Belt,V Ribbed
Element,Lub Oil Filter
Separator,Fuel Water
Element,Oil Bypass Filter
Valvoline Premium Blue 7800 Plus 1/55 Ltr
Inhibitor,Corrosion 10 Liters
Gasket,Rocker Lever Cover
Tachometer
Hose,Flexible
Element,Air Cleaner
Hose,Flexible
Cap,Filler
Hose,Plain
Clamp,T Bolt
Gasket,Connection
Clamp,T Bolt
Gasket,Tor Cnv Oil Cooler
Gasket,Oil Cooler Core
Draincock
Gasket,Lub Oil Clr Hsg
Hose,Plain
Clamp,Tube
Seal,O Ring
Hose,Plain
Seal,O Ring
Hose,Flexible
Indicator,Restriction
Washer,Sealing
Seal,O Ring
Seal,Injector
Seal,O Ring
Hose,Plain
Clamp,Hose
Hose,Flexible
Seal,O Ring
Seal,O Ring
Switch,Pressure
Switch,Temperature
Switch,Temperature
Kit,Oil Cooler
Sensor,Temperature
Sensor,Engine Speed
Sensor,Pressure
Pickup,Magnetic
Gauge,Temperature
Gauge,Pressure
Port and Stbd DA (M/s Cummins India Ltd,) (Running Hours - Port: 6000; Stbd: 6500) - Carry out following routines:- (a) Remove intake manifold. Clean & pressure test, (b) Remove turbocharger. Clean, inspect & repair with new spares, (c) Remove fuel injection pump. Clean, inspect, calibrate & repair with new spare parts, (d) Remove rocker levers & shaft. Clean, inspect & repair with new spares, (e) Remove injectors, clean, inspect, repair & calibrate with new spares, (f) Remove fuel connections (high pressure pipe lines). Clean, inspect & repair with new spares, (g) Remove push rods. Clean, inspect. Replace if required, (h) dismantle cylinder head. Clean, inspect & repair with new spare parts, (j) Dismantle one piston & one con rod assembly. Replace if required. Based on inspection, undertake inspection of balance piston / connecting rods accordingly, (k) Dismantle one liner for inspection of liner outer surface pitting. Replace if require, (l) Replace fresh water Pump, (m) remove belt tensioner. Clean, inspect & repair with new spare parts, (n) Remove & replace fuel feed Pump, (p) Replace sea water pump, (q) Remove starter motor. Clean, inspect, & repair with new spare parts , (r) Replace all hoses of cooling system, air system, lub oil and fuel systems, (s) Replace all zinc plugs, (t) Check /tighten all foundation bolts, (u) Clean all dismantled parts and cylinder block top position. Assemble engine with all new gaskets / 'o' rings, seals and above dismantle sub-assemblies, (v) Carry out tappet setting. For 6 CT/CTA 8.3 D(M) - valve setting intake valve clearance is 0.012” & exhaust valve clearance is 0.024”), (w) Clean all contact studs and bolts from rust cleaner and to be tightened, (x) Check AVR for serviceability. Carry out calibration, after calibration of avr undertake the voltage control test and paralleling trials, (y) All loose screws to be tightened, (z) Carry out calibration of over voltage protection unit (OVPU), reverse power relay, (aa) Undertake trials on completion of overhaul viz. Full load trials, voltage control test, speed control test and paralleling trials, (ab) Carry out calibration checks of all instrumentation/gauges, (ac) Carry out SDC checks of both DA local control panel, rectify defects if any. (ad) Post completion of routines, carry out SDC checks (hot & cold), rectify defects if any. Start the engine and check all gauges, replace if required, check for any oil/ water leakage, exhaust leakage, stop the engine and re-check engine oil level, top up if require. Carry out load trials and observe parameters. System to be proved for satisfactory performance. Quote for Service
Main Diesel Alternator, Cummins, Model: 6 CTA-8.3(DM) - Pump water
Seal O ring
Screw, Hex flange head cap
Connection, Exhaust outlet
Gasket, Exhaust out connection
Flange weld
Switch magnetic
Gasket, Int manifold cover
Screw, Hex flange head cap
Hose, Flexible
Clamp T bolt
Hose, Plain
Seal, Rectangular ring
Hose, Plain
Gasket, Breather
Kit air cleaner element (6C 200KVA)
Clamp T bolt
Clamp T bolt
Gasket connection
Clamp V band
Clamp hose
Gasket lub oil CLR cover
Core cooler
Gasket, oil cooler core
Cap filler
Belt V ribbed
Element lub oil filter
Guide valve stem
Insert valve
Seal valve stem
Valve intake
Valve exhaust
Spring valve
Seal rectangular ring
Pin timing
Clamp injector
Seal injector
Filter coolant
Valve check
Screw benjo connector
Gasket exhaust manifold
Joint ball
Gasket cover plate
Clamp hose
Switch coolant level
Hose flexible
Gasket oil suc. Connection
Gasket oil pan
Sensor temperature
Sensor pressure
Pickup magnetic
Bolt connecting rod
Nut connecting rod
Gasket oil drain
Seal O ring
Seal benjo connector
Hose flexible
Seal O ring
Gasket sea water pump
Gasket hydraulic pump
Hose plain
Clamp hose
Tensioner belt
Screw hex flange head cap
Thermostat
Gasket turbocharger
Nut hexagon flange
Kit HX40 turbo repair
Separator fuel water
Indicator restriction
Inhibitor corrosion 10 Liters
Kit upper engine gasket
Set lower engine gasket
Screw hex flange head cap
Connection oil supply
Screw RKR lever adjusting
Filter fuel
Actuator ETR fuel control
Control governor
Screw hexagon head cap
Connection water inlet
Cover access hole
Damper vibration
Support fan
Cylinder head
Injector
Lever rocker
Manifold oil
motor starting
Pulley alternator
Gear fuel pump
Exchanger heat
Isolator vibration
Pin piston
Pump fuel injection
Pump lubricating oil
Aftercooler
Connection water outlet
Gear flywheel ring
Gasket rear cover
Kit engine piston
Bearing connecting rod
Kit liner
Thermostat
Camshaft
Gear camshaft
Key plain woodruff
Port and Stbd Gear Box (Model - Twin Disc Model- MGX5222DC (Running hours - Port: 2500; Stbd; 2500):- Carry out following routines:- (a) Change lub oil and lub filter, (b) Overhaul control valve, (c) Clean suction strainer, (d) Overhaul lub oil manifold, (e) Inspect primary and secondary shaft assemblies, (f) Renew primary and secondary clutch plate, (g) Grease the oil seal on the output end of the output shaft through the grease filling with water pump, (h) Check shaft oil seal for leakage, renew if defective, (j) Renew all zinc rods, (k) Lub oil coolers to be removed, chemically cleaned, pressure tested and refitting, (l) Sea water leakage observed from gear box lub oil cooler, leakage to be rectified. (m) Carry out overhauling of Control panels. (n) Carry out SDC checks of both Gear box assembly, rectify defects if any. System to be proved for satisfactory performance. Quote for Service
Gear box -Twin disc (Far east) Ltd. - Filter element
Gasket oil pump
Gasket top cover
Ring back up
Filter element
Filter element
Gasket
O ring
O ring
Seal oil
Lube oil pump
Gear box oil- SAE 40
Fuel and Lub Oil Centrifuge (Make- GEA Westfalia, Model-OTC2-02-137):- Carry out following routines: - (a) Replace bow / hood gaskets, (b) Replace drive belts, (c )Replace grooved ball bearings, (d) Lubricate motor bearing, (e) Replace rubber metal coating, (f) Replace radial packing ring, (g) Oil change and through cleaning of the drive chamber. (h) Carry out overhauling of Starting control panels. Quote for Service
West Falia- Fuel oil Purifier - Major service kit
Service kit for pump
OWS (Make-Victor Marine Model-CS 500):- Carry out following routines / work on Oily water separator: - (a) Undertake full servicing of the equipment including pump overhaul, (b) Replace the first stage coalescer pack (c) Renew the advanced Granular media (d) Restore interior coating. (e) Recalibration of 15 ppm monior to be carried out. Prove system for satisfactory operation. (f) Carry out overhauling of Starting control panel. Quote for Service
Oily water separator (Make - Victor Marine, Model - CS1000) :- Coalescer (set)
End plate (set)
Advance granular media(set)
Wadding (filter mesh)
Gasket set (inc hatch gasket)
Feed pump stator
Reciprocating Air Compressor (Make - Elgi, Model LG 02 100 (MD Comp) :- Carry out following routines:- (a) Calibrate all pressure gauges (range- 0 to 17.5 kg/cm2) (Qty 02), (b) Carry out complete overhaul of compressor. Trials to be conducted and system to be proved for satisfactory performance. (c) Unloader valve defective / malfunctioning. To be replaced. (d) Carry out overhauling of Starting control panels. Quote for Service
Reciprocating air Compressors, Make- Elgi (Model HP 10 300) - Kit, Complete overhaul
CO2 Fire Fighting System - Carry out following routines:- (a) Renew all flexible hoses (qty-10), (b) Overhaul non-return valves and safety stop valves, (c) Remove and inspect cylinder operating heads and bursting discs, test for correct functioning, (d) Undertake hydro pressure testing of all bottles at 1.5 times of working pressure (qty 06) and submit report. (e) Carry out weight test of all 06 CO2 cylinders and refill gas if required. (f) CO2 remote control panel limit switch not working. To be replaced (qty 02). System to be proved for satisfactory performance. Quote for Service and Material
Shafting:- Carry out following routines:- (a) Clean and grease propellers, (b) Open top half bearing casing of plummber blocks and inspection to be undertaken.Replace defective bearings. (c) Lubricate the bearings. (d) Post completion of routines, Trials of shafting to be undertaken. System to be proved for satisfactory operation. Quote for Service and Material
AVCAT Striping Pump (Make:- Tushaco Pumps, Model:- T3ST-45 /46, 6 TPH (Type- Screw pump), Qty-02):- (a) Overhaul the pumps, test relief valve and reset on completion. Set Pr- 6 kg/cm2, Size - 50mm. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (c) Alignment of pump to be carried out. (d) Carry out overhauling of Starting control panels. System to be proved for satisfactory. Quote for Service
Avcat Striping pump, Make:- Tushaco Pumps, Model:- T3ST-45 /46, 6 TPH (Type- Screw pump) - Gasket
Pump bearing
Mechanical seal
Fuel flow meter
Cargo LSHSD Pump No.1 & 2 (Make:- Tushaco Pumps, Model:- TDSH-118/064, type- Screw Pump):- (a) Overhaul the pumps, test relief valve and reset on completion. Set Pr- 6 kg/cm2, Size - 50mm. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (c) Alignment of pump to be carried out. (d) Carry out overhauling of Starting control panels. System to be proved for satisfactory. Quote for Service
Cargo LSHSD Pump no.1 & 2 (Make:- Tushaco pumps, Model:- TDSH-118/064) - Gasket
Pump bearing
Mechanical seal
RV spring
Cargo Avcat Pump No.1 & 2 (Make:- Tushaco Pumps, Model:- TDSH-105/058, Type- Screw Pump):- (a) Overhaul the pumps, test relief valve and reset on completion. Set Pr- 6 kg/cm2, Size - 50mm. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (c) Alignment of pump to be carried out. (d) Carry out overhauling of Starting control panels. System to be proved for satisfactory. Quote for Service
Cargo Avcat pump (Make:- Tushaco Pumps, Model:- TDSH-105/058) - Gasket
Pump bearing
Mechanical seal
RV spring
Steering Gear (Make - Geeta Engineering, Model-TR2C-2 x 2.1.35(LG-02100)):- Carry out following routines. (a) Adjust safety valve on rudder motor and pump unit as per manual i.e. 62.5 bar. (b) Calibrate all pressure and temperature gauges. (c) Remove and clean magnetic filters mounted to the pump tanks. (d) Drain hydraulic oil, clean all filter and tanks, charge with fresh oil. System to be proved for satisfactory performance. (e) Rudder angle indicator back light not working and sluggish response at wheel house. Defect is to be rectified and system to be proved for satisfactory operation. (f) Carry out checks of Steering gear control system from wheel house and local control panel and prove the system for correct operation. Quote for Service.
Steering Gear, Make- Geeta engineering, Model-TR2C-2 x 2.1.35 Model - (LG-02100) - Seal kit for hydraulic pump
O' ring kit for relief valve
Pressure gauge (0-210 kg/cm2)
Solenoid for dc valve
Return line filter
Suction filter
Level gauge
Piston o ring
Potentiometer coil
Oil seal
Contactor C1
Relays R1-R5
Relays R6-R8
Indication lamps
Rudder angel indicator
Limit switch
Buzzer B2
Bilge / Ballast Pump (Make:- Jhonsons, Model:- CV-65-160):- (a) Overhauling of pumps to be carried out. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (-1 to 5) kg/cm2. (c) Alignment of pump to be carried out (d) Carry out overhauling of Starting control panel. System to be proved for satisfactory. Quote for Service
Bilge pump/ Ballast pump - Paper gasket
Impeller
Flange gasket
Pump free end bearing
Pump drive end bearing
Mechanical seal(MSGBERXC)
Fuel Oil Transfer Pump (Make- Tushaco Pumps. Model:- T3ST-45/46, Type- Screw Pump) - (a) Overhauling of pumps to be carried out. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (-1 to 5) kg/cm2. (c) Alignment of pump to be carried out (d) Carry out overhauling of Starting control panel. System to be proved for satisfactory. Quote for Service
Fuel oil transfer Pump (Make- Tushaco pumps. Model- T3ST-45/46) - Gasket
Pump bearing
Mechanical seal
Emergency Fire Pump (Make:-Jhonsons, Model:- CH-80-400) - (a) Overhauling of pumps to be carried out. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (-1 to 5) kg/cm2. (c) Alignment of pump to be carried out (d) Carry out overhauling of Starting control panel. System to be proved for satisfactory. Quote for Service
Emergency fire pump (Make:-Johnson, Model:- CH-80-400) - Impeller
Wearing ring
Gasket set
Cap nut
Bearing
Bearing
Shaft sleeve
Impeller key
Air wheel key
Mechanical seal
GS/Fire Pump (Make:- Jhonsons, Model:- CV-40-250, 30 TPH) - (a) Overhauling of pumps to be carried out. (b) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (-1 to 5) kg/cm2. (c) Alignment of pump to be carried out (d) Carry out overhauling of Starting control panel. System to be proved for satisfactory. Quote for Service
Fire pump/ GS pump - Impeller
Wearing ring
Shaft sleeve(32 Dia)
Motor bearing
Mechanical seal
Fresh Water Hydrophore Pump (Make-Marcony Trading) - Mechanical seal observed to be leaking and performance of the pump observed to be sub-optimal. Overhauling and alignment of pump to be carried out and system to be proved for designed perfomance. Carry out overhauling of Starting control panel. Quote for Service and Material
Hinges to be provided/fabricated on chequred plates of engine room for operating system valves. Quote for Service and Material
Fresh water Hydrphore tank:- Renewal the coating of Hydrophore tank. Calibrate pressure gauges. Range - (0 to 7) kg/cm2. Minor air leakage observed in system, to be rectified. Quote for Service and Material
Sea water Hydrphore tank:- Renewal the coating of Hydrophore tank. Calibrate pressure gauges. Range - (0 to 7) kg/cm2. Minor air leakage observed in system, to be rectified. Quote for Service and Material
Portable Gensets (Make- Pelican, Petrol engine, 1.6 KVA) - Overhaul Emergency generator set including calibration of instrumentation. Proved for satisfactory operation. Carry out overhauling of Starting control panel. Quote for Service and Material
Portable Gensets (Make- Pelican, Petrol engine, 1.6 KVA) - Overhaul Emergency generator set including calibration of instrumentation. Proved for satisfactory operation. Quote for Material
DD pump (Make- Perfect, 40 TPH):- Overhaul pump including calibration of instrumentation gauges. Quote for Service and Material
Overhaul portable discharge pump including motor parts, Capacity- 2 BHP. Quote for Service and Material
Renewal of digital flow meter (qty 02) in fuelling system. Quote for Service. and Material
AVCAT Pressure gauge reading on AVCAT filter not readable, view present location. Relocation of pressure gauge to be carried out. Quote for Service and Material
Fire hydrant in pump room obstructing AVCAT filter cover. Hydrant to be relocated. Job involves cutting and welding. Quote for Service and Material
Port gear box lub oil cooler sea water discharge pipe corroded. Pipe to be renewed. Mat-GI, dia-45 mm, length- 01 meter. Quote for Service and Material
Various system valves wheel corroded / damaged. Valve wheels to be renewed. Quote for Service and Material
Remote operation of fuel shut off valves observed to be sub-optimal. The same is to be overhauled. Quote for Service and Material
Split ACs fitted in Wheel House and Bridge observed to be malfunctioning and needs to be renewed. (Make - Voltas, Cap- 2 TR). Quote for Service and Material
Forward hand pump not operating, pump to be overhauled. Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 150mm). Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 125mm). Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 80mm). Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 65mm). Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 50mm). Quote for Service and Material
System Pipelines:- Renew with end fittings of Air Vent & Filling System (150mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
System Pipelines:- Renew with end fittings of Air Vent & Filling System (100mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
System Pipelines:- Renew with end fittings of Air Vent & Filling System (65mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (150mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (125mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (100mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (80mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (65mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (45mm) (C-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 65mm SDNR valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 65mm SD valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 80mm Butterfly valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 80mm SDR valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 125 mm Gate valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 150 mm Butterfly valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 125 mm Butterfly valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 65 mm Butterfly valve valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 100 mm Butterfly valve valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 100 mm Gate valves. Quote for Service and Material
Valves:- Removal, overhauling, pressure testing and fitment of 125 mm SDNR valves. Quote for Service and Material
Renewal of hot lagging for DA and main engine exhaust trunking. Lagging to be provided. Thickness- 25 mm. Material- MWMB Quote for Service and Material.
Suction and discharge pressure gauges of various system lines to be renewed:- (a) Range:- 1 to 2 kg/cm2 (qty 05) (Vertical mounted), (b) Range: 1 to 6 kg/cm2 (qty 08) (Vertical mounted), (c) Range: 1 to 10 kg/cm2 (Qty-04) (Back mounted), (d) Range 1 to 40 kg/cm2 Qty 02 ( Back mounted) Quote for Service and Material
Overhauling of fire hydrants to be carried out. Brass coupling to be renewed. Quote for Service and Material
Pressure gauges line of various system perished. Pipeline to be replaced. Dia-5 mm. Mat-copper. Quote for Service and Material
Rubber bellow and durites of both Main Engines, DAs and all auxiliaries are to be renewed as per sample:- (a) Sea water bellow- Dia-65 mm Qty-06, (b) Sea water Durites- Dia-45 mm Qty-08, Length-0.25 mtr, (c) Sea water durites- Dia-65 mm, Qty-04, Length-0.25 mtr, (e) Sea water bellow- Dia-80 mm ,Qty-04 Quote for Service and Material
Lub oil hand pumps of both main engine and DA to be overhauled. Quote for Service and Material
Remote operation of LSHSD and AVCAT cargo system valves using rod gearing hard to turn. To be overhauled. Quote for Service and Material
AVCAT filter housing alongwith filter element to be replaced view heavy deterioration and cracks. Make- M/s Delta. Quote for Service and Material
Spare AVCAT filter elements to be provided. Make- M/s Delta. Quote for Material
Expansion tanks gauge glass of both MEs and DAs to be replaced as per existing model. Quote for Service and Material
Zinc plugs of system lines, coolers and auxiliary equipment to be renewed as per the sample. Quote for Service and Material
Main Switch board and Group Starter Panel 1&2:- Following works to be carried out: - (a) Undertake calibration of instrument panel / meters fitted on MSB (Qty 10), (b) Replace bus bar insulators (Qty 06). Quote for Service and Material
MSB, Starter Panels & DBS. M/s Marine Electrical – 240V AC green indicating lamp
240V AC, red indicating lamp
240V AC, amber indicating lamp
240V AC, blue indicating lamp
MCB 2 pole 2A
MCB 2 pole 6A
MCB 2 pole 16A
MCB 2 pole 25A
MCB 3 pole 50A
MCB 3 pole 20A
MCB 3 pole 40A
MCB 3 pole 32A
HF Fuse link 4A
HF fuse link 10A
HF fuse link 2A
Thermal overload relay 1.4-2.3A
Thermal overload relay 2-3.3A
Thermal overload relay 4.5-7.5A
Thermal overload relay 3-5A
Thermal overload relay 14-23A
KW meter(-17-50-55Hz)
Interposing relays
Automatic Change over switch
MNX 18 power contactor
MNX 25 power contactor
MNX 32 power contactor
Ammeter 0-250A
Voltmeter 0-500V
Freq. Meter
Double voltmeter
Double freq. meter
Shock mounts for transformers
Shock mounts for SWBD
Echo Sounder (Model - GDS 101, Raytheon Anschutz GMBH, Germany) - Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material
VHF-DSC, Sailor 6222 (Thrane & Thrane), Denmark - VHF display unit not getting switched on. Carry out serviceability / functional check of all units. Replace defective components. Prove system operational availability. Quote for Service and Material
Search & Rescue Transponder, (Make-Thrane & Thrane, Model- SART II), Denmark - SART to be replaced, Qty- 02. Quote for Material.
Inverter cum battery charger unit not working. Suspect control failure. To be repaired. Quote for Service and Material
Fire detection alarm system in wheel house not getting switched on. To be repaired. Quote for Service and Material
Talk back system-speaker and microphone (02 nos) not working. To be repaired. Quote for Service
Talk Back System Spares point - Manual call point
Glass for manual call point, IP43 SV
Talk back amplifier unit
Talk back microphone
SPT fitted onboard at various locations found defective. To be opertionalised. Quote for Service and Material
Sound power telephone - Sound power telephone assy.
Remove and overhaul fire pump motor and GS pump motor including starter panel. Quote for Service
Remove and overhaul fire pump motor and GS pump motor. Quote for Material
GS and Fire pump Starter Panel spares - Aux contactor relay
Aux contactor relay
Aux contactor relay
1*fuse 5*20mm, 1.0A, quick
1*fuse 5*20mm, 3.15A, slow
1*fuse 5*20mm, 2A, slow
1*fuse 5*20mm, 4A, slow
Air Whistle not working. To be opertionalised. Quote for Service and Material
Transformer No 4 (10 KVA) not working due to low insulation. To be opertionalised. Quote for Service and Material
Trans Rectifier Unit to be upgraded to latest version. Quote for Service and Material
Window Wiper rubber beading damaged. Window wipers to be renewed. Quote for Service and Material
Calibration of AFDS sensors/system to be undertaken and defective sensors to be renewed. Serviceability checks of AFDS system to be undertaken. System to be proved for satisfactory performance. Quote for Service
AFDS - Optical smoke detector head, IP44D
Optical smoke detector head, IP44D SV
Conduit box
Sounder
Alarm push button
Socket
Head detector
Fuse 1A
24V DC orange switch
Momentary switch
Rotary switch
Orange indicator
Hooter
Shore supply phase sequence meter faulty, to be replaced with new one. Quote for Service
Phase sequence meter 500V
Tank content gauges control panel (Nivo system) (Qty 03 Panels) observed to be defective. Functional checks of all gauges to be carried out. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. Quote for Service and Material
40 TPH submersible pump socket switch observed to be faulty. To be renewed. Quote for Service and Material
Engine room lighting system to be replaced with LED lighting arrangement (25W). Quote for Service
LED tube light (35W)
LED tube light arrangement
2 pin socket
Engine room and Upper deck flood light(250W) not working. To be renewed. Quote for Service
Lighting - lamp holder
Lamp 250W
Toughened glass plate
Deck lights guard / fitting are broken. To be replaced with new one. Quote for Service and Material
Module type switch / socket faulty / defective to be renewed:- (a) W/H 32 A Switch
(b) Master Cabin 32 A switch
(c) ED cabin 32 A Switch
(d) 04 Crew cabin 32 A switch
(e) Provision Store 32 A Switch
Tubelight (25W) at various compartment / locations not working / defective. To be replaced with LED tube lights. Quote for Service and Material
GPS (MX 512), Navico, Australia - Carry out calibration of the system. Quote for Service and Material
Radar (MDC 2920 P)- Carry out calibration of the system. Quote for Service and Material
Following domestic equipment to be renewed:- (a) Hot Water Boiler (20ltrs)
(b) Deep Freezer 300ltrs
(c) RO purifier 20 ltrs.
(d) Microwave 23 ltrs.
(e) Galley fridge 210 ltrs
PA system (Ahuja) -PA system amplifier unit defective. To be repaired. Quote for Service
PA system microphone defective. To be renewed. Quote for Material
Galley hot plate Non-ops, to be repaired. Quote for Service and Material
Exhaust fan & blowers:- Carry out overhauling of following Ventillation blowers:- (a) E/R ventillation blower, 5.2 KW, Qty- 02 (b) Galley ventillation blower, 0.37 KW, Qty- 02 © Pump room ventillation blower, 0.56 KW, Qty- 02 (d0 Engg/ Elect store blower, 0.1 KW, Qty- 02 Quote for Service and Material
Accomodation space ventillation blowers(0.37 KW) and Bathroom blower( 0.14 KW) non-ops, overhauling to be done. Quote for Service and Material
Fire fighting spray jet nozzles observed to be defective. The same need to be replaced with EN 15182-2:2007(NFPA 1964:2008) standard fire hydrants.
Sea water suction strainers to be manufactured as per sample. Paint with epoxy coating. Mat- SS. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 20m, Dia- 4 inches. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 10m, Dia- 4 inches. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 10m, Dia- 2 inches. Quote for Material.
EPIRB to be replaced. Make- Pathfinder, Mode-RLB 37, Qty- 01. Quote for Material.
Following batteries to be replaced (a) 12V, 120 AH. Quote for Material.
Fans in various locations are not working, to be replaced. Quote for Service and Material
Pesto flash(Insect killer) in dining area to be renewed. Quote for Material.
Nicole lacquer
Search light- Port and Stbd search light not working, to be opertaionalised. Job involves renewal of securing brackets and fitment. Quote for Service
Search light - Lamp holder
Clear shade
Rubber gasket for shade
Lamp 1000W
Lamp 200W
Lamp holder assy.
Front ring, gasket with toughened glass assy.
Rubber bellow
Cable (35 Sq mm,3 Core)
Shore supply connector
Mercury Ship Repairs Pvt Ltd
GOA SHIPYARD LIMITED
YEOMAN MARINE SERVICES PVT. LTD.
ULTRA MARINE
M/s Dynatron services Private Limited
SOlas Marine Services Pvt. Ltd.
SEABLUE SHIPYARD LTD
CARE MARINE AND ALLIED SERVICES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid